RW Energy Baoding 60kWh 30kW energy storage integrated DC fast charging station case: efficient, grid-friendly EV charging with storage.
Adopting an innovative integrated energy storage and fast charging architecture, this solution addresses insufficient grid capacity in urban built-up areas.
Featuring a compact integrated design, full-range environmental adaptability and multi-vehicle compatibility, it enables lightweight deployment of energy replenishment stations in public parking lots, creating a replicable model for non-grid-expansion charging construction and distributed energy storage charging development in northern cities.
With the surge in new energy vehicle (NEV) ownership in Baoding, the demand for charging in urban centers, commercial districts, and residential communities has grown rapidly. This project is located in a public parking lot in downtown Baoding, serving ride-hailing cars, private EVs, and corporate fleets.
The site faced several practical challenges: limited grid capacity, high costs of infrastructure expansion, tight construction deadlines, and complex outdoor environments.
The project addressed three core challenges:
RW Energy provided a 60 kWh / 30 kW Energy Storage Integrated DC Fast Charging Solution. This integrated system eliminates the need for grid expansion and complex civil works, enabling the rapid construction of high-reliability fast-charging points.

| Item |
Details |
| Battery Capacity |
60 kWh |
| Rated Output Power |
30 kW |
| Input Voltage |
200–850 VDC |
| Output Voltage |
200–1000 VDC |
| Output Current |
0–100 A |
| Charging Standards |
GB/T, CCS1, CCS2, CHAdeMO |
| System Efficiency |
≥ 94% (at rated output) |
| Power Factor |
> 0.98 |
| Protection Grade |
IP54 / IK10 |
| Operating Temp |
-30 °C to +55 °C |
| Cooling Method |
Forced Air Cooling |
| Protocols |
OCPP 1.6J |
| Connectivity |
Ethernet / 4G |
| HMI |
7-inch Industrial Touchscreen |
| Safety Protection |
Over/Under Voltage, Overcurrent, Short Circuit, Overtemperature, Insulation Monitoring, Emergency Stop |
| Quantity |
3 Units |
| Location |
Public Fast Charging Lot, Baoding, Hebei |
The project utilizes an Integrated ESS + DC Fast Charging architecture. The built-in battery storage enables "charging at low valley rates and discharging at peak rates," achieving peak-shaving and emergency power backup.
The design complies with outdoor safety standards, featuring robust grounding, insulation, and fireproofing. The full set of drawings covers layout, cable connections, ventilation, and emergency safety nodes, ensuring rapid installation and compliance.


Before delivery, all units underwent full type-tests at the RW Energy Laboratory:
Equipment was secured in industrial-grade, shock-proof, and moisture-proof packaging for long-haul transport. All accessories, including charging guns and technical documents, were categorized and tracked to ensure on-time delivery to the Baoding site.






RW Energy provides integrated O&M services for the Baoding station, specifically focusing on battery health, insulation performance, and fire safety. Our "Dedicated Support + Closed-loop Management" ensures the long-term efficiency and reliability of Baoding’s NEV charging network.
This project technology is fully compatible with international standards and ready for rapid global deployment. Contact us today to customize your energy storage and charging solutions!