RDK Series Autolink Electronic Sectionaliser
RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK pole‑mounted electronic sectionaliser needs no external auxiliary supply, counts upstream recloser‑tripping times for fault isolation with visible open gap after tripping, manual closing via insulated stick and maintenance‑free. It complies with relevant IEC/ANSI sectionaliser standards with configurable counting parameters.
Three-phase electronic pole mounted sectionaliser for 12kV 40.5kV systems, enabling fast fault isolation and enhanced overhead grid reliability.
Pole-mounted vacuum automatic sectionalizer for 12kV and 24kV lines, enabling smart fault isolation to improve grid reliability.
Rockwill voltage-time type intelligent sectionalizer complete set for 12kV distribution automation. Fault isolation, power restoration, remote monitoring via GPRS/fiber.
لا يلزم مصدر طاقة مساعد خارجي. فهو يحصل على الطاقة من محول تيار مدمج، وينفذ منطق اكتشاف تيار العطل والعد بواسطة متحكم دقيق داخلي.
بعد إزالة العطل الدائم، يمكن للمشغلين إغلاقه يدويًا باستخدام قضيب تشغيل معزول. لا يلزم استبدال أي قطع غيار. وسيعاد ضبطه تلقائيًا إذا كان العطل مؤقتًا ولم يصل إلى عتبة العد.
يجب استيفاء ثلاثة شروط في وقت واحد: أن يتجاوز تيار العطل إعداد الالتقاط؛ وأن يتم الوصول إلى مرات العد المحددة مسبقاً (1-4 مرات)؛ وأن يفقد الخط الجهد ويكون التيار المتبقي أقل من 300 مللي أمبير.