RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK pole‑mounted electronic sectionaliser needs no external auxiliary supply, counts upstream recloser‑tripping times for fault isolation with visible open gap after tripping, manual closing via insulated stick and maintenance‑free. It complies with relevant IEC/ANSI sectionaliser standards with configurable counting parameters.
Three-phase electronic pole mounted sectionaliser for 12kV 40.5kV systems, enabling fast fault isolation and enhanced overhead grid reliability.
Pole-mounted vacuum automatic sectionalizer for 12kV and 24kV lines, enabling smart fault isolation to improve grid reliability.
Rockwill voltage-time type intelligent sectionalizer complete set for 12kV distribution automation. Fault isolation, power restoration, remote monitoring via GPRS/fiber.
Non è richiesta alcuna fonte di alimentazione ausiliaria esterna. Preleva energia dal trasformatore di corrente integrato e completa la logica di rilevamento e conteggio della corrente di guasto tramite il microcontrollore interno.
Dopo l'eliminazione del guasto permanente, gli operatori possono richiuderlo manualmente mediante un'asta di manovra isolata. Non è richiesta la sostituzione di pezzi di ricambio. Si riarmierà automaticamente se il guasto è temporaneo e non viene raggiunta la soglia di conteggio.
Devono essere soddisfatte contemporaneamente tre condizioni: la corrente di guasto supera la soglia di intervento; viene raggiunto il numero di conteggi preimpostato (1-4 volte); la linea perde tensione e la corrente residua è inferiore a 300 mA.