RDK Series Autolink Electronic Sectionaliser
RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK electronic sectionaliser: 12-40.5kV, 200-315A, lightning impulse 110-185kV, 1s short-time 10kA, making peak 16kA. For overhead distribution network fault-section isolation.
RDK pole‑mounted electronic sectionaliser needs no external auxiliary supply, counts upstream recloser‑tripping times for fault isolation with visible open gap after tripping, manual closing via insulated stick and maintenance‑free. It complies with relevant IEC/ANSI sectionaliser standards with configurable counting parameters.
Three-phase electronic pole mounted sectionaliser for 12kV 40.5kV systems, enabling fast fault isolation and enhanced overhead grid reliability.
Pole-mounted vacuum automatic sectionalizer for 12kV and 24kV lines, enabling smart fault isolation to improve grid reliability.
Rockwill voltage-time type intelligent sectionalizer complete set for 12kV distribution automation. Fault isolation, power restoration, remote monitoring via GPRS/fiber.
No se requiere ninguna fuente de alimentación auxiliar externa. Obtiene energía del transformador de corriente integrado y completa la lógica de detección y conteo de corriente de falla mediante el microcontrolador interno.
Una vez eliminada la falla permanente, los operadores pueden realizar el cierre manual mediante una pértiga de maniobra aislada. No se requiere el reemplazo de piezas de repuesto. Se restablecerá automáticamente si la falla es temporal y no se alcanza el umbral de recuento.
Deben cumplirse simultáneamente tres condiciones: la corriente de falla supera el ajuste de arranque; se alcanza el número de recuentos preajustado (1 a 4 veces); la línea pierde tensión y la corriente residual es inferior a 300 mA.