
I. Konseptu a Gaba: Ganawar Da Duka + Data-Driven
Yana kula da modelin daidaito da inganci da takaice da "Detection-Evaluation-Warning-Optimization." Yana samun daidaito mai kyau a kan yawan daidaito da kuma takaice masu yawan riski, ta haifar da abubuwan da suka fito da rayuwa da 40%.
II. Ingantaccen Sistem na Takaice na Tabbaccewar Zanfara
- Sistem na Takaice na Uku
- Takaice na Farko (Masana/Ma'aduga):
- Yana bincika tsari na air termination systems (rods/straps/meshes).
- Yana tabbatar da hanyoyi da suka fito a kan infrared thermography.
- Takaice na Shekarar (Mafi Girma):
- Test na grounding system: Monitoring na soil resistivity na yawan yawa + 3D imaging na grounding impedance.
- Test na SPD (Surge Protective Device): Test na insulation resistance + verification na discharge counter.
- Takaice na Musamman (Ba Aiki/Ba Rayuwa):
- Yana bi shirya hanyoyin zanfara a kan lightning positioning systems.
- Yana yi targeted impulse grounding resistance tests.
- Ayoyinta na Takaice
- Drone aerial photography don bincike na air terminals.
- Smart grounding resistance tester (±2% accuracy).
- High-frequency current probes capturing SPD microsecond-level responses.
III. Model na Takaice na Yawan Riski
An gina LEAP-Risk™ Assessment Matrix (Lightning Exposure Assessment Program):
Risk Score = 0.3 × Historical Strike Frequency + 0.2 × Equipment Sensitivity
+ 0.4 × Protection Device Integrity + 0.1 × Electromagnetic Environment Complexity
Note: Outputs risk levels (Red/Orange/Yellow/Blue) to drive protection strategy adjustments.
IV. Yanayin Ruwa na Data
- Digital Twin Management Platform
- Integrates BIM models for visualized inspection results.
- Auto-generates Lightning Facility Health Report, including:
- Ground grid corrosion rate predictions,
- SPD remaining lifespan assessments,
- Air terminal protection angle deviation alerts.
- Risk Response Decision Support
| Risk Level | Protection Reinforcement Focus | Inspection Interval Compression Factor |
|------------|-------------------------------|----------------------------------------|
| Red | Install early streamer emission systems | 30 days/cycle |
| Orange | Upgrade to Class III SPD protection | 90 days/cycle |
| Yellow | Supplement equipotential bonding | 180 days/cycle |
Value na Solution
- Risk Visualization: ≥65% reduction in annual lightning disaster economic losses.
- Smart O&M: 50% lower manual inspection costs + 3x faster response speed.
- Precision Protection: Critical equipment lightning withstand capacity elevated to 200kA (IEC 62305 standard).
Case Study: A data center implementing this solution achieved 92% SPD failure prediction accuracy, reduced lightning-induced downtime incidents to zero, and obtained TÜV Rheinland Smart Lightning Protection Certification.