Electronic Current Transformer (ECT) Solution: ​​Economically Driven Retrofit Solusyon sa Electronic Current Transformer (ECT): ​​Pagpapabago na Pinagbibigyan ng Ekonomiya

I. Mga Punto ng Sakit: Mga Hamon sa Pagsasabog ng Tradisyunal na Substation
Ang mga tradisyunal na electromagnetic current transformers (CTs) ay nagbibigay ng maraming isyu sa mga lumang substation:

  • Mataas na Gastos sa Pagsasabog:​ Ang pagpapalit ng mga tradisyunal na CTs ay nangangailangan ng malaking power outages, civil construction, at updates sa mga protection panels, cabling, at grounding systems. Ang kabuuang gastos ay lumalampas sa 50%.
  • Mababa ang Katugmaan:​ Ang mga bagong device ay may interface mismatches sa mga legacy secondary systems (e.g., relays, meters), kaya kailangan ng karagdagang conversion devices.
  • Pagpapahintulot sa Espasyo:​ May limitadong espasyo ang mga lumang substation. Ang mga tradisyunal na CTs ay malaki at matibay, kaya mahirap i-hoist at maaaring mag-require ng paglalawak ng foundation.
  • Mahabang Commissioning:​ Ang mga pagsasabog ay kasama ang multi-system integration testing. Ang maikling outage windows ay nagdudulot ng pagkaantala sa grid restoration.

II. Solusyon: ECT (Electronic Current Transformer) Economical Retrofit
Matutugunan ang isang upgrade path ng "minimizing retrofit cost, maximizing compatibility with existing systems" sa pamamagitan ng teknolohiya ng ECT:

​**▶ Pangunahing Ekonomiko na Bentahe: Malaking Pagbawas sa Comprehensive Retrofit Cost**​

Cost Item

Conventional CT Retrofit

ECT Retrofit Solution

Cost Savings

Equipment Installation

Crane/Civil Works/Foundation Reinforcement

Direct Stud Mounting

​**↓ 40% construction cost**​

Cabling

Multi-strand Copper Cables + Extensive Wiring

Fiber Optic / Digital Signal Lines

​**↓ 60% cable cost**​

Secondary Equipment Interface Retrofit

Protection Panels & Meter Replacement Required

Compatible with Traditional Analog Output

​**↓ 80% secondary retrofit cost**​

Outage Duration

≥7 Days (Full Substation Shutdown)

≤3 Days (Partial Outage)

​**↓ 50% outage loss**​

​**▶ Compatibility Design: Seamless Integration with Existing Infrastructure**​

  1. Hybrid Interface Output:
    Ang ECTs ay may built-in ​Analog Output (4-20mA/0-5V) + Digital Output (IEC 61850-9-2), compatible sa tatlong scenario:
    • Legacy Protection Devices:​ Konektado diretso sa umiiral na current input terminals.
    • Digital Protection Systems:​ Ipadala ang GOOSE messages via Merging Units (MUs).
    • Metering Systems:​ Simultaneous output ng analog signals para sa meter sampling.
  2. Plug-and-Play Installation:
    • No Crane Required:​ Ang bigat ng ECT <15kg (vs. ~150kg para sa conventional CTs), pinapayagan ang manual installation.
    • Compact Size:​ Diameter ≤200mm, fits original CT mounting brackets.
    • Flexible Rogowski Coil:​ Maaaring ilagay sa umiiral na primary conductors, walang busbar disassembly.
  3. Adaptive Power Supply Scheme:
    • Laser Power Supply:​ Energy delivered via fiber optics embedded in insulators, eliminating separate power supplies.
    • Busbar Power Harvesting:​ Inductive power harvesting uses primary current for self-supply, suitable for passive environments.

III. Value Realization: Rapid Return on Retrofit Investment

Retrofit Phase

Core Value of ECT Solution

Economic Impact

Pre-construction & Construction

Shortens Schedule by 70%

Reduces Outage Loss ≥ ¥2 million

Commissioning

Plug-and-play, no calibration for legacy protection

Commissioning Costs ​**↓60%​**​

Operation & Maintenance

No magnetic saturation, wideband measurement (0.1Hz~5kHz)

Maintenance Frequency Reduced by ​90%

Long-term Expansion

Pre-installed digital interfaces support future smart substation upgrades

Avoids secondary retrofit investment

IV. Representative Case Study: 110kV Gudu Substation Retrofit

  • Original Configuration:​ Electromagnetic CTs (Commissioned 1985)
  • Retrofit Solution:
    Ininstall ang 12 ECTs (Class ±0.5S) upang palitan ang mga tradisyunal na CTs. Output signals:
    → 4-20mA fed into existing relay protection devices.
    → IEC 61850-9-2LE fed into newly installed smart control cabinets.
  • Economic Results:
    • Total Investment Reduced by 42%​ (Primarily saved on cabling, civil works, commissioning).
    • Outage Time Reduced​ from originally planned 7 days to ​2.5 days.
    • Compatibility Verified:​ Conventional differential protection operating time maintained at ​15ms, with ​no failure to trip / maloperation.

V. Bakit Pipiliin ang ECT Economical Retrofit?

  1. Controlled Cost:​ Retrofit budget reduced by ​30%-50%, ​ROI < 3 years.
  2. Risk Mitigation:​ Maintains existing protection logic, avoiding system reconfiguration risks.
  3. Smooth Evolution:​ Compatible with today's analog systems, supporting tomorrow's digital grid.
  4. Emergency Replacement:​ Faulty CT replacement completed in as little as ​48 hours.
07/24/2025
Inirerekomenda
Engineering
Ang PINGALAX 80kW DC Charging Station: Matatag na Mabilis na Pagcharge para sa Lumalaking Network ng Malaysia
Ang PINGALAX 80kW DC Charging Station: Maasamang Fast Charging para sa Lumalaking Network ng MalaysiaSa paglaki ng merkado ng electric vehicle (EV) ng Malaysia, ang pangangailangan ay lumilipat mula sa basic AC charging patungo sa maasamang, mid-range DC fast charging solutions. Ang PINGALAX 80kW DC Charging Station ay inihanda upang punin ang mahalagang gap na ito, nagbibigay ng optimal na blend ng bilis, grid compatibility, at operational stability na mahalaga para sa nationwide Charging Stati
Engineering
Integradong Solusyon sa Hybrid na Pwersa ng Hangin at Araw para sa mga Malalayong Isla
AbstractInihaharap ng propusisyong ito ang isang inobatibong integradong solusyon sa enerhiya na malalim na pinagsasama ang paggawa ng enerhiya mula sa hangin, solar, pump hydro storage, at teknolohiya ng desalinasyon ng tubig dagat. Layunin nito na sistemang tugunan ang mga pangunahing hamon na hinaharap ng mga malayong isla, kabilang ang mahirap na saklaw ng grid, mataas na gastos ng paggawa ng enerhiya mula sa diesel, limitasyon ng tradisyonal na pananakop ng baterya, at kakulangan ng sariwan
Engineering
Isang Intelligent na Sistemang Hidrido ng Hangin-Solar na may Fuzzy-PID Control para sa Enhanced na Battery Management at MPPT
PangkalahatanAng propuesta na ito ay nagpapakilala ng isang wind-solar hybrid power generation system batay sa advanced control technology, na may layuning maipatupad nang epektibo at ekonomiko ang mga pangangailangan ng enerhiya sa mga malalayong lugar at espesyal na aplikasyon. Ang pinakamahalaga sa sistema ay ang intelligent control system na nakasentro sa ATmega16 microprocessor. Ang sistema na ito ay gumagawa ng Maximum Power Point Tracking (MPPT) para sa parehong wind at solar energy at gu
Engineering
Muraangkop na Solusyon ng Hybrid na Hangin-Solar: Buck-Boost Converter & Smart Charging Bawas ang Cost ng Sistema
AbstractInihahandog ng solusyong ito ang isang bagong high-efficiency na wind-solar hybrid power generation system. Tumutugon ito sa mga pangunahing kahinaan ng umiiral na teknolohiya—kabilang ang mababang paggamit ng enerhiya, maikling buhay ng bateria, at mahinang istabilidad ng sistema—sa pamamagitan ng paggamit ng fully digitally controlled buck-boost DC/DC converters, interleaved parallel technology, at intelligent three-stage charging algorithm. Dahil dito, nagiging posible ang Maximum Pow
Inquiry
+86
I-click para i-upload ang file

IEE Business will not sell or share your personal information.

I-download
Kumuha ng IEE-Business Application
Gamit ang app na IEE-Business upang makahanap ng kagamitan makuha ang mga solusyon makipag-ugnayan sa mga eksperto at sumama sa industriyal na pakikipagtulungan kahit kailan at saanman buong pagsuporta sa pag-unlad ng iyong mga proyekto at negosyo sa enerhiya