Traditional Solution |
CIT Solution |
Savings |
|
CT+PT units |
2 devices |
1 CIT device |
Space ↓58% |
Cable joints |
6 points |
2 points |
Failure points ↓67% |
Core Technical Parameters
(Compliance with mainstream SE Asian grid standards)
Commercialization Strategy
Risk Mitigation Measures
Risk Type |
Countermeasures |
Lightning hazards |
Built-in multi-gap surge arrester (170kV impulse withstand) |
Installer skill gaps |
Multilingual 3D installation guide app (Thai/Vietnamese support) |
Policy volatility |
Deep partnerships with local entities (e.g., Indonesia PLN-certified firms) |