Plug-and-Play CT Module Rapid Replacement Solution: Revolutionizing Efficient Maintenance for GIS Current Transformers
A cikin yankin da tushen karkashin kwakwalwa da abubuwan da take sauran wani lokaci na gida, haka na iya shafi abubuwan da suka faruwar da lafiya ko kuma abubuwan da ke sauran. Idan an sami tasirin wani gasar da ake amfani da ita a tsakanin karkashin kwakwalwa (CTs) na GIS, yana bukatar maimaito don kula da jiki da kuma kula da gasar. Wannan bayanai ya amfani da takarda mai sauƙi a yi ɗaukan CT module ta hanyar plug-and-play don inganta waɗannan matsalolin, wanda ya ƙara tsari a ɗaukar waɗannan matsaloli a kan maimaiton system GIS.
Muhimman Tushen Fanni
- Sauƙi Ƙarfafin A Kula Da Jiki - Maimaito Da Sauta Na Bellows Na Metal
- Matsayin gasar CT modular yana iya ba da alama a kan gasar; kula da jiki ba buƙace maimaito da gasar na main body GIS.
- Takarda na bellows na metal yana ba da aikin da zai duba da sauti a tsakanin -40°C zuwa 105°C.
- Amfani da ayyuka mai sauƙi na hydraulic don kula da alamomin gasar da ba ya sauransu; duk fannin kula da jiki/kula da jiki zai ɗauka <120 minutes (vs. ~72h don tushen masu zamani).
- Amfani Da Plug-and-Play - Takarda EEPROM Mai Sauƙi
- Chip AT24C512 na industrial grade an fi sanya a kan windings na CT ta hanyar kula da parametorin maimaito (linear compensation ±0.1%, phase compensation angle <2 arcminutes).
- Yana haɗa da unitun measurement/control na GIS daga baya, wanda ya ƙara tsari a kan tushen verification na current ratio/phase error.
- Yana taimaka 30,000 read/write cycles tare da tsari na data retention period da ya fi 25 years.
- Kula Da Jiki A Cikin Yankin - System Calibration Portable
- Tester na handheld injection yana ba da current da ya ƙara tsari 0.5~5000A adjustable (Class 0.05 accuracy), wanda ya tabbatar da IEC 61869-2 testing requirements.
- Yana ƙara tsari automatic parametoren da ake amfani da su a kan reference values na EEPROM; kula da jiki zai ɗauka <30 minutes.
- Bluetooth transmission of reports to operation & maintenance (O&M) platforms for generation of digital maintenance records (ISO 55001 compliant).
Value of Application Scenario
Scenario
|
Traditional Solution Pain Point
|
Value of This Solution
|
Nuclear Power Plant
|
Shutdown/refueling outage losses > $2 million/day
|
Saves > $1.8 million per maintenance event
|
Data Center
|
Power outage causing IDC service level agreement (SLA) breaches
|
Enables Tier IV continuous power supply
|
Urban Power Grid
|
Load transfer increases systemic risk
|
Avoids chain-fault risks in 500kV power grids
|
Core Advantages
- 90% Faster Fault Recovery: Reduced from an average of 72 hours to under 7 hours (including testing).
- Zero Planned Outages: GIS main body remains energized during operation, eliminating load loss.
- 60% Lower O&M Costs: Reduced need for lifting equipment/specialized personnel.
- Traceable Maintenance: Generates digital calibration reports for every maintenance action (ISO 55001 compliant).
Case Study: At a nuclear power base implementing this solution, the GIS average annual fault downtime dropped from 87 hours to 0.8 hours.