Ⅰ. Iyakar ƙasashen ƙasar Southeast da Taccirin Maɓallu
II. Taccirin Ƙasashen Kirkiro
|
Bambanta |
Bayani ta Bambanta |
Yadda ake Amfani a Wurare |
|
Sistem na Battari |
Aikin LiFePO4 mai ruwa (misali, Sungrow PowerTitan, Jinko G2 Blue Whale system) |
Tsarin jiki da yauwa mai ruwa (Jinko temp control ±2.5°C); >94% round-trip efficiency; >6,000-cycle lifespan. |
|
PCS & Taccirin Kirkiro |
Taimaka dual off-grid/grid-tied modes; Black start & VSG (Virtual Synchronous Generator) functionality. |
Maimaita cututtukan kirkiro; Cost-saving 0.4kV multi-point grid connection (<1000kW) ko 10kV step-up connection (>1000kW). |
|
Taccirin Ƙasashen Kirkiro |
Smart EMS platform integrating electricity price forecasting, load dispatch, and VPP (Virtual Power Plant) participation. |
Taimaka mekanisumun kasuwanci kamar Philippines' GEAP bidding, Singapore's Jurong Island electricity futures trading. |
III. Ɗalilai Mai Turanci & Hukuma
|
Abincin |
Naɗa Naɗa |
Amfani Da Amfani |
|
Investment Daga Farko |
High (tariffs + transportation) |
Local manufacturing setup |
|
O&M Cost |
Diesel gen. cost USD 0.25/kWh |
PV+storage LCOE USD 0.08-0.12/kWh |
|
Policy Benefits |
— |
Philippines CIT exemption first 10y, halved next 5y |
IV. Hanyar Amfani Da Amfani
V. Cooperation Ecosystem