• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


End-to-End Power Project Solutions for the Global Energy Market

IEE Business provides end-to-end power project solutions for the global market — from financing and procurement to engineering, construction, and commissioning. We support utilities, developers, and industries with integrated services across renewable, thermal, and grid infrastructure projects, ensuring efficiency, compliance, and timely delivery worldwide.

Dynamic Reactive Power Compensation Solution for Electric Furnace Transformers

Dynamic Reactive Power Compensation Solution for Electric Furnace Transformers​Electric furnaces (particularly arc furnaces and submerged arc furnaces) exhibit significant ​shock load characteristics​ during smelting processes, causing ​severe power factor fluctuations (typically between 0.6 and 0.8)​. This not only leads to grid voltage fluctuations, flicker, and harmonic pollution but also increases line losses and reduces grid power supply efficiency.To address this challenge, this solution e
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/09/2025
Chat now
Send inquiry

Electric Furnace Transformer Protection Solution

Ⅰ. Background Introduction​Electric furnace transformers are common equipment in industrial production processes, used to convert electrical energy into thermal energy for heating, melting, or sintering materials. However, during operation, electric furnace transformers may encounter various problems such as voltage fluctuations, over-current, and short circuits. These issues can lead to equipment damage, production interruptions, and even safety accidents. Therefore, to ensure the safe operatio
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/09/2025
Chat now
Send inquiry

Harmonic Suppression Furnace Transformer Solution

​Problem Analysis​Modern electric furnaces (especially arc furnaces, medium-frequency furnaces, and power-frequency induction furnaces) generate substantial higher-order harmonic currents that inject into the grid during operation due to their nonlinear load characteristics (e.g., violent fluctuations of electric arcs, rectification/inversion processes). These harmonics cause:​Grid Pollution: Distorted grid voltage waveforms (increased THD), affecting the normal operation of other sensitive equi
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/09/2025
Chat now
Send inquiry

Core Equipment in the Smart Energy Era: Power Electronic Transformer Solution for Power Generation

I. Background and DemandWith the rapid increase in renewable energy adoption, traditional electromagnetic transformers struggle to meet modern grids’ demands for flexibility, efficiency, and intelligence. The volatility and intermittency of wind and solar power pose severe challenges to grid stability, necessitating an innovative energy conversion hub capable of dynamic regulation and high-quality power output.II. Solution OverviewThis solution employs all-solid-state Power Electronic
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Smart Upgrade and Efficient Maintenance Solution for Transmission Transformers

1. Background and ChallengesSome transmission transformers in current power grid systems face significant challenges. On one hand, aging equipment with extended operational lifespans exhibits gradual degradation in technical performance, reliability, and safety. On the other hand, traditional manual inspections and periodic maintenance are inefficient, lagging in detecting potential faults. Maintenance efforts are plagued by high costs, operational difficulties, and challenges in fault localizat
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Integrated Optimization Solution for Power Plant Electrical Systems

Ⅰ. Core ObjectivesEnhance power generation efficiency, ensure power supply reliability, reduce full life-cycle operational costs, and achieve intelligent regulation of power systems.Ⅱ. Core Subsystem Optimization SolutionsDedicated Solution for Power TransformersPain Point Analysis: Transformers serve as the critical hub for power transmission, accounting for 3%~5% of total plant energy losses. Failure-induced downtime leads to complete plant power outages.1. Transformer Selection & Technolo
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Smart Management and Maintenance Solution for Power Generation Transformers

Ⅰ. Background and Pain PointsAs power generation enterprises scale up and grid intelligence advances, traditional periodic maintenance models struggle to meet the O&M demands of large power transformers:• Delayed Fault Response: Sudden insulation aging or overheating cannot be detected in real time• High Maintenance Costs: Over-maintenance wastes resources, while insufficient maintenance causes unplanned downtime• Fragmented Data Analysis: Isolated data from DGA (D
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Comprehensive Performance Enhancement Solution for Transmission Transformers: Optimizing Cooling and Reducing Magnetic Circuit Losses

1. Background and ChallengesWith the continuous growth of power loads and increasingly stringent requirements for stable grid operation, transmission transformers face severe challenges regarding operational efficiency, temperature rise control, and long-term reliability. Excessive operating temperatures accelerate the aging of insulation materials, shorten equipment lifespan, and increase failure risks. High magnetic circuit losses (primarily iron loss and copper loss) reduce energy utilization
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Power Transformer Solution: Dual Enhancement Strategy Based on Insulation Material Optimization and Oil Quality Management

Ⅰ. Core Challenges and Objectives Challenges: During long-term operation, transmission transformers face two core issues: insulation material aging (leading to reduced insulation strength and diminished heat resistance) and transformer oil degradation (increased moisture content, impurity accumulation, rising acid number, etc.), which threaten equipment safety and service life. Objectives: Through material upgrades and management reinforcement, significantly enhance the stability of insulation p
18yrs 500-1000 employees 108000m²+m² US$150,000,000+ China
Chat now
Send inquiry
08/05/2025
Chat now
Send inquiry

Lightning Protection Grounding System Construction Scheme

I. Project Background and ObjectivesWith the increasing deployment of intelligent equipment in buildings, the risk of lightning damage has surged significantly. This scheme aims to establish a scientific and reliable lightning protection grounding system, ensuring effective protection for buildings and internal facilities during lightning strikes. It minimizes the risks of equipment damage and personal injury caused by lightning, providing a solid guarantee for the safe operation of facilities.I
3yrs 1000+m² US$300,000,000+ China
Chat now
Send inquiry
08/01/2025
Chat now
Send inquiry
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.