• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Trafo Mai Kafu (trafo mai kawar da abinci)

  • Mining Transformer(distribution transformer)

Abubuwa gaba

Muhimmiya Vziman
Model NO. Trafo Mai Kafu (trafo mai kawar da abinci)
Kpọmkwem kwamnyereke 1000kVA
Voltage Level 10KV
Siri Mining Transformer

Bayani na sayen daga mai wuyaci

Sharararwa

Overview ta product:

 Transforma general na mine:

  • A waka da ita a wurare da coal dust da kuma biogas a cikin mine, inda ba a nan yawan faruwa. Ana amfani da shi don haɗa masu zafi da kuma tsaƙa.

  • Transforma general na mine ya fi tsayi da takalma da kuma kadan. Tanki ya fi tsayi masu ƙwarewa da kuma zama mai tsayi a ƙwarewa pressures na 0.1 mpa bila da gida da gudanar. Masu inganta da kuma fuskantar zafi na high da low voltage na transforma na mine suna da cable junction boxes filled with insulating adhesive.

  • Transforma general na mine ana fito da no excitation voltage regulation, voltage regulation range is ±5%; The secondary coil leads to 6 terminals, which can use Y - connection or Delta - connection.

Transforma flameproof na mine:

  • A waka da ita a wurare da yawan faruwa a cikin mine. Wannan tunanin transforma yana cikin dry type, abin da ya fi tsayi shine kowane joint surface na box shell an yi ne a cikin flame-proof requirements, kuma yana iya ƙware pressure na 0.8 mpa.

  • Capacity na transforma dry-type na mine yana da 4000kVA (4MVA) da 2500kVA (2.5MVA), wanda aka sake yin don haɗa electric drill, tsaƙa, signal, da sauransu. Ingantattun da fuskantar su suna da cable through the outlet sleeve.

  •  High reliability of operation verification in more than 50 countries and regions around the world.

  • Our products are mainly exported to Iran, Kazakhstan, Uzbekistan, Kazakhstan, Pakistan, Indonesia, Chile and other countries and regions.


Leading technology:

  •  Large capacity, low loss, low noise (< 65dB) more energy saving

  •  Excellent performance index, actual measurement is better than GB and IEC standards

  •  The product has strong over-load capacity and over-voltage capacity, and can run safely for a long time under rated load

  •  Strong impact resistance and short circuit resistance

  •  With microcomputer protection device (measurement, control, protection, communication, etc.)

The shell:

  • Mitsubishi laser cutting machine and CNC punching, reducing, folding and other equipment to ensure the accuracy of processing.

  • ABB robot automatic welding, laser detection, to avoid leakage, qualified rate of 99.99998%.

  • Electrostatic spray treatment, 30 years of paint (coating corrosion resistance within 100h, hardness ≥0.4).

  • Use heat dissipation tubing (double row and three row tubing adopt insert mode) to achieve good heat dissipation effect.

  • Fully sealed structure, maintenance-free and maintenance-free, normal operation life of more than 30 years.

The iron core:

  • The core material is high quality cold rolled grain oriented silicon steel sheet with mineral oxide insulation (from Baowu Steel Group, China).

  • Minimize loss level, no-load current and noise by controlling the cutting and stacking process of silicon steel sheet.

  • The iron core is specially reinforced to ensure the transformer structure is firm during normal operation and transportation.

winding:

  • Low voltage winding is made of high quality copper foil, excellent insulation resistance.

  • The high voltage windings are usually made of insulated copper wire, using the patented technology of Hengfengyou Electric.

  • Very good resistance to radial stress caused by short circuit.

High quality material:

  • Baowu Steel Group production of silicon steel sheet.

  • China produces high quality anaerobic copper.

  • CNPC (Kunlun Petroleum) High quality transformer oil (25#).

Ordering instructions

  • Main parameters of transformer (voltage, capacity, loss and other main parameters).

  • Transformer operating environment (altitude, temperature, humidity, location, etc.).

  • Other customization requirements.

  • Normal delivery period is 30 days.

  • Worldwide fast delivery.

What safety precautions need to be paid attention to when using mine transformers underground?


Explosion-proof Safety:

Shell Inspection:

  • For flameproof mining transformers, it is necessary to regularly inspect the integrity of the flameproof shell. The flameproof joint surfaces should remain smooth and free from damage, and the flameproof clearance must meet the specified standards. For example, the flameproof clearance is generally required to be within a specified range, such as around 0.1 - 0.2 mm. Any clearance exceeding the standard may lead to the failure of the explosion-proof performance.

  • The bolts and other connecting parts on the shell should be complete and tightened to prevent loosening during the operation due to vibration or other reasons, which may affect the flameproof effect.

Preventing Internal Faults from Causing Explosions:

It is essential to ensure that the quality and installation of the electrical components inside the transformer meet the requirements to prevent faults such as short circuits and overloads from generating electric sparks or high temperatures. For example, the insulation of the windings should be in good condition to avoid inter-turn short circuits. Meanwhile, appropriate overload protection and short-circuit protection devices should be installed so that when overload or short-circuit situations occur, the power supply can be cut off in a timely manner to prevent the generation of energy sufficient to cause explosions inside the transformer.

Electrical Safety:

Grounding Safety:

  • Mining transformers must have reliable grounding. The grounding resistance should meet the specified requirements, and generally, the grounding resistance is required to be no greater than 2Ω. Good grounding can lead the current into the earth when leakage or other faults occur in the transformer, thus avoiding electric shocks to personnel.

  • The grounding devices should be regularly inspected to ensure that the grounding connections are firm and that the grounding electrodes are free from corrosion and other damage. For example, if the grounding electrodes are in a damp underground environment for a long time, they are prone to rust and corrosion, which will reduce the grounding performance and need to be replaced in a timely manner.

Preventing Electric Shocks:

  • The high-voltage and low-voltage terminals of the transformer should be enclosed or protected to prevent accidental contact by personnel. During maintenance and other operations, the power supply must be cut off first, and a warning sign saying "Someone is working, Do not switch on" should be hung.

  • Underground operators should be equipped with personal protective equipment such as insulating gloves and insulating boots, and they should receive relevant electrical safety training to be familiar with the operation and safety precautions of the transformer.




Maimakanta mai inganci
Kayan da ke zuwa
kima mai yiwuwa da wata
Waktu na kirma
100.0%
≤4h
Gaskiya ta hanyar kamfanin
Workplace: 10000m² Jami'a nanan mafi girma: 300 Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Workplace: 10000m²
Jami'a nanan mafi girma: 300
Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Aiki
Turanci Masana: Design/Manufakturi/Sallar
Ƙananunan Cigaba: Gwọ́n ọkụ̀ àbálòpà/Transformator
Mafarkin tsoro na yawan kulle
Kayan aiki na alaka da amfani, yin amfani, gyara-gyaran da kuma pasuwa na kayan karkashin yanayi, suka kentuwa da kaiwansu masu iko, ingantacciyar hankali da kuma amfani mai kyau.
mabudin aikatan kayan dabbobi sun dawo da idoni masu iko da ma'ajiriyya, sannan suka tabbata inganci, kwayoyin uku da na'ibbicci ne daga babban kayan aikin

Zan'antar Ilimi

  • Kashe da Tattalin Kasa na Kirkiro Gida a Ƙarfin Kirkiro 10kV
    Karakteristikai da Kwayoyin Tsohon Gaba na Fasal Akwai Wata1. Karakteristikai na Fasal Akwai WataSignaolin Alarami na Wasu:Bello na alarami ya kara, kuma lampan na bayani "Fasal Akwai Wata a [X] kV Bus Section [Y]" ta kafa. A cikin sistemai da ke amfani da Petersen coil (coil na paka wata) don kare gaba na neutral point, lampan na "Petersen Coil Operated" kuma ta kafa.Bayanin Voltmeter na Paka Insulation:Tushe na fasal akwai wata ta zama yawa (a lokacin da ke tsakanin paka mai yawa) ko ta daga z
    01/30/2026
  • Gidamintar da take gudanar da shi a wurin karkashin 110kV~220kV na IEE-Business
    Na gaba da hanyar kan zabe ta rike masu shirya na 110kV~220kV, yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suka dace da muhimmanci, kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suke musamman. Kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti ba suka fi yawa da tare da uku da zabe ta rike masu shirya na tsakiyar karamin sauti.Don sabbin abubuwa da kuma hanyoyin kimiyya, zabe ta rike masu shirya na 220kV da 110kV ya kamata
    01/29/2026
  • Dausu Da Yadda Makarantu Sun Yi Amfani Da Dukkuka Karamin Gwanda Na Karamin Jiya Da Karamin Rokki?
    Daga Yana Da Iya Mafi Masu Shiga Karamin Jiragen, Kwararren, Makarantun Dukai Da Kuma Makarantun Giwa?A cikin masu shiga karami, wasu kayan aiki kamar muhimmanci da kuma muhimmanci na noma, tushen bayyana, muhimmanci da kuma muhimmanci na tsakiyar, da kuma muhimmanci na tsakiyar suna bukatar shiga karami. A kan nan, zan iya fahimta daga baya ta hanyar yadda ake amfani da kwararren da kuma makarantun dukai a cikin masu shiga karami. Ba saboda haka, wannan kwararre ya taka rawa masu dalilai da kum
    01/29/2026
  • Yadda ya zama da kyau a kan gwamnati na tsaro kawai tafi daga baya? Ba a tabbas cewa a kan gwamnati na tsaro kawai tafi daga mafi girma?
    Daga cewa Mafi yadda Annabiya na Transformer Daidai Don?A lokacin da transformer ya yi aiki, mafi yadda, tare da kaya, abincin da kuma muhimman da suka da amfani don bincike mafi yadda da windings, suna cikin elektrik field mai girma. A kan takarda wannan elektrik field, suka samu potential mai ukuwa da ground. Idan mafi yadda ba da ground, za a cikin mafi yadda da kaya da tank, zai kasance potential difference wanda zai iya haifar da discharge mai yawa.Kuma, a lokacin da transformer ya yi aiki,
    01/29/2026
  • Fahimtar Tashin Gine na Tashin Kawo Masu Zafi
    I. Maimaita Neutral Point?A cikin transforma da kuma maimaitarai, maimaita neutral point shine maimaitar tana da aiki a kan yawan winding inda tsari mai zurfi daga wannan maimaitar zuwa har daidai na terminal sama da duka. A cikin diagrammin da ake bayar, maimaita O yana nufin maimaita neutral point.II. Yadda Ake Iya Sabon Duka Don Maimaita Neutral Point?Sauran hanyoyi na elektrik da take sabon duka don maimaita neutral point da kasa a cikin systemin AC three-phase yana nufin sabon dukar neutral
    01/29/2026
  • Me kuke so kuɗi a wasu Rectifier Transformers da Power Transformers?
    Mai shi ne mai Transformer na Rectifier?"Power conversion" yana hanyar hukuma mai girma da take aiki a cikin rectification, inversion, da kuma frequency conversion, tare da rectification ce mafi yawan amfani a cikinsu. Aikin rectifier ta aiki wajen gudanar da AC power na input zuwa DC output tun daga rectification da filtering. Transformer na rectifier yana aiki a matsayin transformer na power don aikin rectifier kamar haka. A cikin amfani na takamakawa, akwai karin DC power supplies suka samun
    01/29/2026

Halayyar Bubuwa

  • Analisis na Labarai da Dalilai don Turbin Masu Faduwar Zane Don Turbin Mai Sani a Jami'a
    1. Zuruwa na Tarihin Karkashin Da Farkon Iya​1.1 Daban-daban na Zuruwa Wanda Ke Farkon Iya​Transforma da zama a tsaye da kuma transforma da zama a uku ke da daban-daban da suka faruwar da zuruwa. Transforma da zama a tsaye suna amfani da zuruwa na E ko ​zuruwa mai kasa, hakan da transforma da zama a uku suna amfani da zurwa na uku ko gurbin zuwa. Wannan farkon zuwa yana taka muhimmanci ga iya:Zuruwa mai kasa a cikin transforma da zama a tsaye ke hada hanyar tattalin mafi girma, ​na kusan kamar h
    06/19/2025
  • Integirin Sọlusi na Transformers ọnụ nke Nsogbu site na Ụdị Ekwupụta Na-akwado: Ihe Mmemme Nke Teknụziri na Ụzọ Ọhụrụ dị ka Anya bụ Ịtụle Anya
    1. Background and Challenges​Distributed integration of renewable energy sources (photovoltaics (PV), wind power, energy storage) imposes new demands on distribution transformers:​Volatility Handling:​​Renewable energy output is weather-dependent, requiring transformers to possess high overload capacity and dynamic regulation capabilities.​Harmonic Suppression:​​Power electronic devices (inverters, charging piles) introduce harmonics, leading to increased losses and equipment aging.​Multi-Scenar
    06/19/2025
  • Akwụkwọ Nsogbu Nke Isiokwu Ugbu A Site Asia: Egwuregwu, Ọdịnala & Nkasi Isiokwu
    1. Daidokunin da na Nauyin Kirkiro na Taurari a Masarautar Asia​1.1 ​Daidokunin Daɗiyan Tsarin Kirkiro​Kirkiro mai yawa a cikin masarautar Asia: Ana amfani da 220V/230V tsohon-kirkiro kan, amma a wurareen al'adu ana buƙata 380V uku-kirkiro, kuma akwai tsarin kirkiro da ba su dace-ba kamar 415V a wuraren.Yawan kirkiro (HV): Yawancin da ke 6.6kV / 11kV / 22kV (wasu ƙasashin kamar Indonesia sun amfani da 20kV).Tsarin kirkiro ta hanyar (LV): Daidai 230V ko 240V (tsohon-kirkiro biyu-ko biyar).1.2 ​Na
    06/19/2025
Alwolƙiyoyin haɓakawa masu alaƙa
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika. Samun Kwatanti Yanzu
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika.
Samun Kwatanti Yanzu
Aika tambaya
+86
Dauke kake saita fayil
Kwamfuta
Samun IEE Business Application
Yi amfani da IEE-Business app don samun abubuwan aikin, samun halayyin, haɗi da malamai, kuma kai tsauraran takaiddun kasoshin duka lokaci, duka wurin—dole bai karfin takamaltar hulɗin ku na alintakargida da kasuwanci.