| Muhimmiya | RW Energy |
| Model NO. | Kontrola Nokta Iyakata na Kisan Gwamnati na IEE-Business |
| Rated Voltage | 230V ±20% |
| Rated Frequency | 50/60Hz |
| Kadansan kusaƙa | ≤5W |
| Siri | RWK-38 |
Tambayar
RWK-381 line sectionalizing load break switch controller shine kuma na switch da ya kamata aiki da switch mai gaba. Ba zan iya kasa rike shi ba, an kasa shi ne idan yanayin ko kawo shi taifi.
RWK-381 line sectionalizing load break switch controller yana amfani da IT operation mode. Idan yanayi yadda, kontrola zai tattauna shekaru da aka yi. Idan shekaru yana haɗa da ma'aikatar, kontrola zai kasa bayan yanayin ko kawo shi taifi.
Kofin kontrola itace da harshe mai zurfi, tsari ita da painting, anticorrosion, za a iya amfani da shi a wurare.
Yana da circuit da ke kafofin: Yana iya ƙara AC220V charging power supply daga waje. Idan ba a baka power supply daga waje, za a iya samun karshen/kashe da kowane abubuwa na kontrola da battery. Kuma, ana saftoci da anti-over discharge circuit don sarrafa battery idan ba a baka power supply daga waje zuwa lokacin.
Binciken abubuwan da suka fiye
1. Abubuwan da suka fiye:
1) Section function,
2) 50 Instantaneous/Definite-Time Overcurrent (P.OC),
3) 51 Phase Time-Overcurrent (P.OC2/P.OC3),
4) 49 Overload
5) 50N Residual Ground Instantaneous/Definite-Time Overcurrent(G.OC),
6) 51N Residual Ground Instantaneous/Definite-Time Overcurrent (G.OC2 /G. OC3) ,
7) 50SEF Sensitive Earth Fault (SEF),
8) 51C Cold Load,
9) TRSOTF Switch-Onto-Fault (SOTF)
10) 27 Under Voltage (L.Under volt) ,
11) 59 Over Voltage (L.Over volt),
2. Abubuwan da suke mulki:
1) 74T/CCS Trip & Close Circuit Supervision,
2) 60VTS VT Supervision .
3. Abubuwan da suke mulki:
1) 60VTS Lockout ,
2) circuit-breaker control.
4. Abubuwan da suke mulki:
1) Primary/Secondary Phases and Earth Currents,
2) Direction,
3) Primary/Secondary Line and Phase Voltages,
4) Apparent Power and Power Factor,
5) Real and Reactive Power,
6) Positive Phase Sequence Voltage,
7) Negative Phase Sequence Voltage & Current,
8) Zero Phase Sequence Voltage,
9) Earth Current With 3RD Harmonics,
10) Frequency,
11) Binary Input/Output status,
12) Trip circuit healthy/failure,
13) Time and date,
14) Event records
15) Counters,
16) Wear.
5. Abubuwan da suke mulki:
a. Communication interface: RS485X1,RJ45X1
b. Communication protocol: IEC60870-5-101; IEC60870-5-104; DNP3.0; Modbus-RTU
c. PC software: RWK381HB-V2.1.3,The address of the information body can be edited and queried by PC software,
d. SCADA system: SCADA systems that support the four protocols shown in "b.”.
6. Abubuwan da suke mulki:
1) Event Records,
2) Fault Records,
3) Measurands.
7. remote signaling remote measuring, remote controlling function can be customized address.
Technology parameters

Device structure


About customization
The following optional functions are available: cabinet heating defrosting device, battery upgrade to lithium battery or other storage equipment, GPRS communication module,1~2 signal indicators,1~4 protection pressure plates, the second voltage transformer, custom aviation socket signal definition.
For detailed customization, please contact the salesman.
Q: What is line sectionalizing load break switch?
A:line sectionalizing load break switch is an important device used in power lines. Its main function is to segment the line according to certain rules. The advantage of this is that when a certain segment of the line fails, the segment switch can isolate the faulty segment from the normally functioning line.
Q: How does it determine the segments?
A: The segmentation is usually determined according to the load distribution, geographical layout and power supply reliability requirements of the line. For example, in the area where the load is more concentrated, a separate segment may be divided; Or by geographical area, such as a block or an industrial area.
Q: What is the significance of line sectionalizing load break switch for power system?
A: It can improve the reliability and flexibility of the power system. When a fault occurs, it can quickly isolate the fault, reduce the scope of power outage, so that power maintenance personnel can be more targeted to troubleshoot the fault, and other unaffected segments can continue to supply power normally, ensuring that
Wasu na iya haɗa zuwa SCADA System da DMS, kuma za a iya haɗa terminal zuwa server ta hanyar yadda ake ƙunshi shi a tushen gwamnati. Wannan terminal ya kunshi CDMA (3G)/LTE (4G)/ NR (5G), ETH, fiber optic da wasu hanyoyi don haɗa zuwa network. Kuna iya tambaya muka kai tsaye, kuma zan iya ba ku ƙarfin wani amsa don automashin tushen kungiyar gwamnati.
A: AC SUPPLY: Jikin AC DA YANKE
BATTERY FAIL: BATARI AN RARA
count1/2/3: Nauyin Sectionalizer da yawa/biye/tatu
RESET: Ƙara Sectionalizer
CYCLE: Sectionalizer tana yi aiki a cikin yanke
LOCK: Kofin Sectionalizer
COMMU: Tashar tana yi aiki a cikin yanke
A/B/C: Wani A/B/C ya zama
OCR: Wani over current fault
EF: Wani earth fault
OVR/UVR: Kirkiya/Jirgin kirkiri
Waɗannan zabe na ƙarin hanyar tushen bayanai, wadanda ba su shafi ɗaya da ɗaya. Wata ɗaya shine RS485, kuma wata biyu shine ETH, wadanda zai iya kunna a gaba-gaba. Hanyar kunna yana cewa:
A nan, channel 1 ya faru, kuma channel 2 ya faru da hakan da channel 1. A nan, channel 2 ta bukatar cewa a kunne network ports. Ƙarin da za su zama:
Haɗa da computer da Ethernet cable kuma haɗe 192.168.0.7 via WEB (IP address of the computer must be 192.168.0.XXX network segment, otherwise it cannot be accessed). Idan an samu cewa background, zabi "Local IP Config" button don kunna DHCP mode, static address, subnet mask, and gateway address; Zabi "Serial Port" button in the background, saka output port of the communication protocol in "Local Port number", and saka network port working mode (TCP Server/TCP Client) in "Local Port number". Idan an kunni TCP Client, fill in the TCP server address below. A nan, all communication settings have been configured
NOTE: 1. An rufe product to default settings before delivery to meet most usage scenarios. It is not recommended to make modifications or only modify controllable items (such as modifying communication protocols, configuring communication functions on/off, etc.) when it can be used normally
Aa, wannan aiki tana da ma'adinarren software na farko (kawai a cikin bersion na windows-X86), wanda zai iya a fadada zuwa terminal karkashin port na serial ko network, wanda ke taimaka wa a kan kayan aiki da shirya, da kuma a kan kayan siffar addini don signaling, telemetry, da control daga hanyar masu yawan, tafiya bayanan abubuwan da suka faru, kafin koyar amfani na electricity meters, da kuma kula abubuwan mazaunin magana, da kuma muhimmanci a yi ayyuka na control daga hanyar masu yawan.