• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Terminal Unit sa Feeder

  • Feeder Terminal Unit
  • Feeder Terminal Unit

Mga mahalagang katangian

Brand RW Energy
Numero sa Modelo Terminal Unit sa Feeder
Naka nga boltahang rated 230V ±20%
Nasodnong peryedyo 50/60Hz
Konsumo sa Electrikidad ≤5W
Serye RWK-55

Mga deskripsyon sa produkto gikan sa supplier

Deskripsyon

Deskripsyon

Ang RWK-55 overhead line protection switch intelligent controller mao ang medium voltage overhead line grid monitoring unit, mahimong pagbutangan sa RCW(RVB) type vacuum circuit breaker aron makamit ang automatic monitoring, fault analysis ug event records.

Naghatag kini og safety power grid para sa cutting line fault ug automatic recovery operation ug power automation.

 Ang serye sa RWK-55 katugasan sa pila ka 35kV outdoor switchgear gamiton, kasinabi na: vacuum circuit breakers, oil circuit breakers ug gas circuit breakers. Ang RWK-55 intelligent controller nagpuyo sa line protection, control, measurement ug monitoring sa voltage ug current signals integrated automation ug control devices sa labas.

Ang RWK mao ang automatic management unit para sa single way/multi ways/ring network/two power sourcing, gihatagan sa tanang voltage ug current signals ug tanang functions. Ang RWK-55 column switch intelligent controller nagsuporta: Wireless (GSM/GPRS/CDMA), Ethernet mode, WIFI, optical fiber, power line carrier, RS232/485, RJ45 ug uban pang mga anyo sa communication, ug mahimo nga mag-access sa uban pang station premises equipment (kasama ang TTU, FTU, DTU, etc.).

Pangunahing Paila

1. Protection relay functions:

1) 49 Thermal Overload,

2) 50 Tres-sekwensya sa Overcurrent (Ph.OC) ,

3) 50G/N/SEF Sensitive Earth Fault (SEF),

4) 27/59 Under/Over Voltage (Ph.OV/Ph.UV),

5) 51C Cold load pickup (Cold load).

2. Supervision functions: 

1) 60CTS CT Supervision,

2) 60VTS VT Supervision,

3. Control functions:

1) 86 Lockout,

2) 79 Auto reclose,.

3) circuit-breaker control,

4. Monitoring Functions:

1) Primary currents for Phases and Zero sequence current,

2) Primary PT Voltage,

3) Frequency,

4) Binary Input/Output status,

5) Trip circuit healthy/failure,

6) Time and date, 

7) Fault records,

8) Event records.

5. Communication functions:

a.  Communication interface: RS485X1,RJ45X1

b. Communication protocol: IEC60870-5-101; IEC60870-5-104; DNP3.0;  Modbus-RTU

c. PC software: RWK381HB-V2.1.3,The address of the information body can be edited and queried by PC software,

d. SCADA system: SCADA systems that support the four protocols shown in "b.”.

6. Data Storage functions:

1) Event Records,

2) Fault Records,

3) Measurands.

7. remote signaling remote measuring, remote controlling function can be customized address.

Teknolohiya parametros

paramete.png

Device structure

RWK-55-尺寸Model.png

控制器的应用方案.png


About customization

Ang sumala nga optional functions available: Power supply rated at 110V/60Hz,3 Voltage transform, 1 Zero phase sequence voltage sensor, cabinet heating defrosting device, 1 battery measurement, 1 battery activation management, GPRS communication module,1~2 signal indicators,1~4 protection pressure plates, the second voltage transformer, custom aviation socket signal definition.

Para sa detalyado nga customization, palihog kontakta ang salesman.

 

Q: Ano ang gibuhat sa line protection switch controller?

A: Kini gamiton sa proteksyon sa seguridad sa line. Kon ang line adunay overload, short circuit o uban pang abnormal conditions, ang line protection switch controller mahimong maayo nga matubag kini nga problema, ug maka-cut off sa circuit, aron maprotektahan ang line gikan sa dako nga current, aron maputli ang sunog ug uban pang dangerous situations. Q: Asa kini natubag sa anomalya sa line?

A: Adunay sophisticated current detection device sa sulod. Kon ang current sa line mogawas sa set nga safe value, sama sa overload o short circuit, ang detection device mahimong masentrihan ang pagbag-o sa current ug maisulat ang controller action.

Q: Handa ba ang line protection switch controller?

A: Sa general, kon qualified product, handa kini. Ang electronic components mahimong maayo nga screened, ug ang housing adunay maayo nga protection ug makapag-adapt sa uban pang environmental conditions, pero regular nga i-check ug maintain aron siguro nga makapagtumong sa maayo.


Libreria sa Dokumentasyon Resources
Restricted
RWK-55 Feeder Automatic Unit Installation drawing
Drawing
English
Consulting
Consulting
Restricted
RWK-55 Feeder Automatic Unit used manual
Operation manual
English
Consulting
Consulting
Restricted
RWK-55 Feeder Automatic Unit electrical drawing
Drawing
English
Consulting
Consulting
Public.
IEC60870-5-7 Communication protocol standard
Other
English
Sertipikasyon
FAQ
Q: Pwede ba ang device nga mao kini molink sa SCADA System o DMS?
A:

Kini nga device makakonekta sa SCADA System ug DMS, ug mahimo nimo mokonekta ang terminal sa server batas sa imong lokal nga network conditions. Kini nga terminal nagsuporta sa CDMA (3G)/LTE (4G)/ NR (5G), ETH, fiber optic ug uban pang paagi aron makapasok sa network. Mahimo sad nimo mokontak kanamo direkta, ug mihatag kami og solusyon alang sa distribution network automation.

Q: Tagaas kini og mga detalye bahin sa OC1, OC2, ug OC3?
A:

Ang Three-Section Overcurrent Protection mao ang usa ka koordinadong sistema sa pagprotekta nga gi gamit sa mga sistema sa kuryente aron mopilde ug isulay ang mga kasayahan (e.g., short circuits) samtang sigurado ang pagpili sa pag trip. Kini gisakop og tulo ka yugto uban ang ilang kaugalingon nga operasyon batas sa magnitude sa kuryente ug delay sa panahon:

  1. Instantaneous Overcurrent Protection (Section I)

Pungtaron: Nag responde agad sa dako nga overcurrents nga mas taas sa high-set threshold (e.g., 5–10 times the rated current).

Layun: Agad nga mopilde sa mga close-in faults (near the protection device) aron maprevent ang pagkasira sa equipment.

Dakong Pungtaron: Walay intentional time delay (operates in milliseconds).

  1. Time-Delayed Overcurrent Protection (Section II)

Pungtaron: Nagsiguro human sa predefined short delay (e.g., 0.1–0.5 seconds) para sa moderate overcurrents (e.g., 2–5 times the rated current).

Layun: Mga handle sa faults nga mas layo gikan sa protection device, naghatag og oportunidad sa downstream breakers nga mopilde sa localized faults unang (selectivity).

Koordination: Gigamit ang time-graded scheme—mas taas nga fault currents (closer faults) trip mas rapido, samtang mas bata nga currents (remote faults) trip mas dili matag.

  1. Backup Overcurrent Protection (Section III)

Pungtaron: Nagsiguro human sa longer time delay (e.g., several seconds) para sa low-magnitude overcurrents (e.g., 1.2–2 times the rated current).

Layun: Nag serbisyo isip backup para sa primary protection (Sections I/II) ug nagsilbi sa overloads o persistent faults.

Pungtaron: Mahimo mogamit ang inverse-time curve (trip time decreases as current increases).

Prinsipyong Koordination

Ang tulo ka yugto nagtrabaho hierarchically:

Section I mopilde sa severe faults agad.

Section II naghandle sa moderate faults ngadto sa short delays, nag prioridad sa system selectivity.

Section III naghatag og backup protection, nag ensure sa reliability kon ang upstream protections mag fail.

Kini nga layered approach minimizes ang scope sa outage, balanse ang speed ug selectivity, ug nag enhance sa grid stability.

Q: Unsaon ang pag-configure sa communication function niining protective device?
A:

Unsaon ang pag-configure sa communication function niining protective device?
Niini nga protective device, gisupportan ang 2-channel serial communication, RS232 o RS485 bus, ug independente kada usa. Mahimo silang i-configure separately. Ania ang paraan sa pag-configure:
1. Pagsulayi sa settings page: EDIT → Para;
2. Pag-configure sa communication function on/off: Scroll down ug pangita og Comm1 Status set to 1, nga nagpahibalo nga ania, ug 0 nga nagpahibalo nga wala. Ang default setting mao ang ania;
3. Pag-set sa communication baud rate: configure according to the baud rate of RTU o protocol converter, with a default value of 9600;
4. Pag-set sa communication protocol: Adunay apat ka protocols nga mahimo molihok, corresponding to setting 1 as IEC-60870-101, setting 2 as IEC-60870-104, and setting 3 as DNP3.0, set 4 to ModBus RTU, default to IEC-60870-101;
5. Pag-set sa communication balance (only valid for multiple IEC-60870-101): Set 1 to IEC-60870-101 protocol balance mode and 0 to unbalanced mode;
6. Pag-set sa communication source address: set value to 1-65535, default value to 1;
7. Pag-set sa report target address: Set value to 0-65535, default value to 1;
8. Pag-set sa active upload: 0 does not actively upload, 1 actively uploads, default value is 1;
9. Pag-save sa settings: Humanudto sa pag-complete sa settings, ipindot ang "Enter" key, ipasabot ang password 0099 (some models are 0077), ipindot ang "Enter" key usab, ug ang screen will prompt "Save successful" to indicate that the settings have been saved.
Kini nga point, ang channel 1 adunay na ang iyang setup, ug ang channel 2 i-setup sa sama nga paraan sa channel 1.

Pangitaan ang imong supplier
Tindahan Online
Porsiyento sa maong pagdala nga on-time
Panahon sa pagtubag
100.0%
≤4h
Panahon sa Kompanya
Lugar sa Trabaho: 30000m² Kabulto nga mga empleyado: Pinakataas nga Annual Export (usD): 100000000
Lugar sa Trabaho: 30000m²
Kabulto nga mga empleyado:
Pinakataas nga Annual Export (usD): 100000000
Servisyo
Uri sa Negosyo: Disenyo/Manufacture/Sales
Pangunahon nga Kategoriya: robot/Bag-ong Energy/Pagsusi sa mga aparato/High Voltage Electrical Equipment/Mga Bataas nga Elektrisidad/Mga Instrumento ug Meters
Lifetime Warranty Manager
Mga serbisyo sa pagdumala sa tibuok kinabuhi alang sa pagpamalit, paggamit, pagmentenar, ug pagkahuman sa pagbaligya sa kagamitan, aron masiguro ang luwas nga operasyon sa mga elektrikal nga kagamitan, padayon nga kontrol, ug dili mag-ukon-ukon nga konsumo sa kuryente
Ang taghatag sa kagamitan nakapasar sa platform qualification certification ug technical evaluation, nga naghimo sa compliance, professionalism, ug reliability gikan sa gigikanan.

Mga Produktong Nakarrelasyon

Kaalamang May Kaugnayan

  • Mga Sayop ug Paghunahuna Sa Pag-atas Sa Iisa Ka Fasa Sa 10kV Distribution Lines
    Mga Kinaiya ug mga Kaugalingong Detektor sa Single-Phase Ground Fault1. Mga Kinaiya sa Single-Phase Ground FaultMga Signal sa Central Alarm:Nagring ang warning bell, ug naglitaw ang indicator lamp nga gilabel “Ground Fault on [X] kV Bus Section [Y]”. Sa mga sistema nga may Petersen coil (arc suppression coil) nga naka-ground sa neutral point, ang “Petersen Coil Operated” nga indicator usab motindog.Mga Indikasyon sa Insulation Monitoring Voltmeter:Ang voltage sa nahisalaan nga phase mokubos (kon
    01/30/2026
  • Neutral nga punto sa grounding operation mode alang sa 110kV~220kV power grid transformers
    Ang pag-arrange sa mga modo ng operasyon ng grounding ng neutral point para sa 110kV~220kV power grid transformers dapat matugunan ang mga requirement ng insulation withstand sa mga neutral points ng transformer, ug usahay mao usab ang pagpanalipod sa zero-sequence impedance sa mga substation nga walay dako nga kausaban, samtang sigurado nga ang zero-sequence comprehensive impedance sa anumang punto sa short-circuit sa sistema dili mogawas sa tulo ka beses sa positive-sequence comprehensive impe
    01/29/2026
  • Unsa ang Katuyohan sa Paggamit og Bato Gravel Pebbles ug Crushed Rock sa mga Substation?
    Asa Kini ang mga Substation Usa ka Bato, Gravel, Pebbles, ug Crushed Rock?Sa mga substation, ang mga equipment sama sa power ug distribution transformers, transmission lines, voltage transformers, current transformers, ug disconnect switches nimo kinahanglan og grounding. Padulong sa grounding, karon atong ibutangan ang kahibawo bahin kon asa kini nga gravel ug crushed stone gamiton sa mga substation. Bisag ordinaryohan ra sila, importante kaayo ang papel nila sa seguridad ug pagkabana-bana.Sa d
    01/29/2026
  • Asa kini ang usa ka Transformer Core Nangangailangan I-ground sa Tungod nga Punto Lamang? Usa ra ba ang Mas Handuraw ang Multi-Point Grounding?
    Asa karon ang Core sa Transformer Nangangailangan Moground?Sa panahon sa operasyon, ang core sa transformer, sama sa metal nga estruktura, bahin, ug komponente nga naghulagway sa core ug windings, tanan nahimutang sa matigas nga elektrisidad. Sa impluwensya niining elektrisidad, sila magkuha og relatyibong mataas nga potensyal labi na sa ground. Kon ang core wala moground, adunay potential difference kay sa pagitan sa core ug grounded clamping structures ug tank, mahimong makaresulta og intermit
    01/29/2026
  • Pagkabana sa Transformer Neutral Grounding
    I. Ano ang Neutral Point?Sa mga transformer ug generator, ang neutral point mao ang partikular nga punto sa winding diin ang absolute voltage tali kini nga punto ug bawg external terminal sama. Sa diagram sa ubos, ang punto O mao ang neutral point.II. Asa Nagkinahanglan ang Grounding sa Neutral Point?Ang elektrikal nga koneksyon pamaagi tali sa neutral point ug yuta sa usa ka three-phase AC power system gitawag og neutral grounding method. Kini nga grounding method direkta nakaapekto sa:Ang segu
    01/29/2026
  • Unsa ang Kalainan Tungod sa mga Rectifier Transformers ug Power Transformers
    Ano ang Rectifier Transformer?"Power conversion" usa ka pangngalan nga naglakip sa rectification, inversion, ug frequency conversion, diin ang rectification ang labing gamit. Ang mga kagamitan sa rectification mogamit og input na AC power isip DC output pinaagi sa rectification ug filtering. Ang rectifier transformer magsilbi isip power supply transformer alang sa mga kagamitan sa rectification. Sa industriya, ang daghang DC power supplies nakakuha gikan sa pagkombinasyon sa rectifier transforme
    01/29/2026

Mga Solusyon nga Relate

  • Solusyon sa mga sistema sa awtomatikong distribusyon
    Unsa ang mga kahadlok sa operasyon ug pagpanalipod sa overhead line?Kahadlok uno:Ang overhead lines sa distribution network adunay dako nga sakop, komplikado nga terreno, daghan nga radiation branches ug distributed power supply, resulta nianang "daghan nga mga line faults ug kahadlok sa pagtroubleshoot sa fault".Kahadlok Duha:Ang manual troubleshooting mahimong mapuslan ug makapoy. Sa wala pa, ang running current, voltage ug switching state sa line wala masayran real-time tungod sa kulang sa in
    04/22/2025
  • Integradong Smart Power Monitoring ug Energy Efficiency Management Solution
    OverviewAnia nga solusyon naglakip og usa ka maayo nga sistema sa pag-monitor sa kuryente (Power Management System, PMS) nga nakentro sa end-to-end na optimisasyon sa mga resources sa kuryente. Pinaagi sa pagbuhat og usa ka closed-loop management framework sa "monitoring-analysis-decision-execution," makatabang kini sa mga kompanya mula sa simpleng paggamit sa kuryente hangtod sa maayo nga pag-manage sa kuryente, sukad pa sa pag-achieve sa safe, maayo, low-carbon, ug ekonomikal nga paggamit sa
    09/28/2025
  • Isang Bagong Modular na Solusyon sa Paghahamon para sa mga Sistema ng Pagbuhat ng Kapangyarihan sa Photovoltaic at Imprastraktura ng Pagsimpan ng Enerhiya
    1. Pagpakilala ug Background sa Pananaliksik​​1.1 Kasamtangan nga Kahimtang sa Industriya sa Solar​Isip usa ka sa labi abundant nga renewable energy, ang pagpalambo ug paggamit sa solar energy naging sentral sa global nga transition sa energy. Sa katapusan nga mga tuig, gihatagan sa mga patakaran sa tibuok kalibutan, ang photovoltaic (PV) industry namihasik nga pagkamata. Ang estadistika nagpakita nga ang PV industry sa Tsina nakakita og 168-fold nga pagtaas sa "12th Five-Year Plan" period. Hang
    09/28/2025
Wala pa'y maayong supplier? Pahibalo ang verified suppliers nga mahan-ono ka. Pangita og Quotation Karon
Wala pa'y maayong supplier? Pahibalo ang verified suppliers nga mahan-ono ka.
Pangita og Quotation Karon
Inquiry
+86
I-klik aron i-upload ang file
Pangutana
Pangutana sa IEE-Business Application
Pangita og mga equipment gamit ang IEE-Business app asa asa ug kailan man sugad og pagkuha og solusyon pagsulay sa mga eksperto ug pagpadayon sa industriya nga pakisayran suportahan ang imong proyekto sa kuryente ug negosyo