• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


40.5kV wind power special load switch

  • 40.5kV wind power special load switch

Key attributes

Brand Wone
Model NO. NFZ77-40.5D wind power special load switch
Rated voltage 40.5kV
Rated normal current 1250A
Rated frequency 50(Hz)
shut-off current 50kA
Series NFZ77

Product descriptions from the supplier

Description

Description:

It is mainly composed of a frame, an isolation switch (the current limiting fuse of the combined electrical appliance is installed on the isolation switch), a vacuum interrupter, a grounding switch, a spring operating mechanism, etc.It is suitable for three-phase AC 35kV, 50Hz power system, or used with complete sets of power distribution equipment, ring network switchgear, combined substation, etc.

Industry applications:

It is widely used in wind power generation, urban grid construction and renovation projects, industrial and mining enterprises, high-rise buildings and public facilities, etc., and can be used for power distribution, control and protection of ring network power supply units or terminal equipment.

Features:

  • State-of-the-art vacuum interrupter.

  • Compact structure and small size. 

  • Long electrical life and frequent operation.

  • Strong closing and breaking ability, safe and reliable.

  • Easy to operate and maintain.

  • Flexible spring-actuated mechanism

  • It uses an electric motor (with manual) spring energy storage.

  • It has the ability of remote control.

  • There are two methods: electromagnet electric synthesis and interpretation.

  • It can be equipped with over-current protection function.

  • Powerful all-in-one features

  • It integrates circuit breaker, disconnector and grounding switch.

  • Visible isolation fractures and grounding knives with closing capability.

  • Reliable mis-proof mechanical interlocks.

  • The ability to interrupt the rated current (NFZR77-40.5D/T63-31.5 interruptable short-circuit current) and prevent the equipment from running out of phase.

Technical parameters:

image.png

image.png

Product show:

image.png


Product show:

20140829094947.jpg


Why choose us:

  • We have a professional service team

  • We have good after-sales

  • We can guarantee the quality of our products

What is a wind load switch?

A wind power load switch is a specialized switching device used in wind power generation systems. It is primarily used to control and protect the connection lines between wind turbines and the power grid. The switch can connect and disconnect a certain load current under normal conditions and can promptly cut off the circuit when faults such as overloads or short circuits occur, thereby protecting the wind power generation equipment and the power grid.

Operating Principle:

When the wind turbine is generating electricity normally and supplying power to the grid, the wind power load switch is in the closed position, allowing current to flow through the contact system between the generator and the grid. When maintenance or inspection of the wind turbine is required, or when a fault occurs in the grid (such as an overload or short circuit), the operating mechanism drives the contacts apart. At this point, the arc extinguishing system activates, quickly quenching the arc generated by the separation of the contacts, thus interrupting the circuit and providing protection for the electrical system. Once the fault is resolved, the wind power load switch can be reclosed to re-establish the connection between the wind turbine and the grid.



Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 65666m²m² Total staff: 300+ Highest Annual Export(usD): 50000000
Workplace: 65666m²m²
Total staff: 300+
Highest Annual Export(usD): 50000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: Wire cable/High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Integrated Electrical Equipment/Production equipment/Generator/Electrical fittings
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Neutral point grounding operation mode for 110kV~220kV power grid transformers
    The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
    01/29/2026
  • Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
    Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
    01/29/2026
  • Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
    Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
    01/29/2026
  • Understanding Transformer Neutral Grounding
    I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
    01/29/2026
  • What’s the Difference Between Rectifier Transformers and Power Transformers?
    What is a Rectifier Transformer?"Power conversion" is a general term encompassing rectification, inversion, and frequency conversion, with rectification being the most widely used among them. Rectifier equipment converts input AC power into DC output through rectification and filtering. A rectifier transformer serves as the power supply transformer for such rectifier equipment. In industrial applications, most DC power supplies are obtained by combining a rectifier transformer with rectifier equ
    01/29/2026
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.