• 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
  • 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
  • 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
  • 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
  • 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
discuss personally
Model
WZ08-160kW-2EJ-20INGYNN
WZ08-160kW-2EU-20INGYNN
WZ08-160kW-2CE-20INGYNN
WZ08-160kW-2E-20INGYNN
WZ08-160kW-2C-20INGYNN
Basic info
Brand RW Energy
Model NO. 160kW 180kW 200kW 240kW 320KW GBT CCS1 CHAdeMO CCS2 Connector Double Gun Fast DC EV Charging Station
Rated Output Rating 160kW
Output Voltage DC 200-1000V
Power Conversion Efficiency ≥95%
Connector Options GBT+CCS2
Cable Length 5m
Input Voltage 380V
Series DC EV Chargers
Product Detail

Description:

This series of DC fast chargers offers 160kW, 180kW, 200kW, 240kW, and 320kW power options with GBT, CCS1, CHAdeMO, CCS2 connectors, supporting dual-gun simultaneous charging to meet the high-efficiency energy replenishment needs of global EVs. Compatible with domestic GB/T vehicles, European/American CCS models, and Japanese CHAdeMO standards, it enables plug-and-charge convenience for all major EV brands.

Key Features:

  • Full Power Range Coverage: Five power configurations from 160kW to 320kW, suitable for light buses, passenger cars, and electric trucks. The 320kW model charges vehicles from 10% to 80% in just 30 minutes.

  • Dual-Gun Parallel Charging: Two independent charging guns support simultaneous operation, with each gun delivering up to 320kW, significantly enhancing station throughput and reducing user wait times.

  • Universal Compatibility: Integrates four major charging standards (GBT/CCS1/CHAdeMO/CCS2), compatible with over 99% of global EVs, including Tesla, BYD, Volkswagen, Nissan, etc.

  • Intelligent Power Management: Dynamic power allocation system optimizes current distribution between guns, ensuring stable output even during simultaneous charging.

  • Efficient Cooling & Safety: Liquid-cooled thermal management with smart temperature control enables operation in -30°C to 55°C environments. Equipped with overvoltage/overcurrent protection, leakage monitoring, and fireproof design.

  • Flexible Deployment: Wall-mounted or floor-standing installation options, adaptable to highway rest areas, commercial parking lots, and logistics parks. Seamless integration with third-party management platforms.

Specifications:

Project  Technical Parameter
 Power

160kW/180kW/200kW

/240kW/320kW

 Model WZ08/09/10/11/12
Connector  GBT/CCS2/CHAdeMO/CCS1
Max Power 240kW
 Emergency Stop Button Yes
Communication Protocol OCPP1.6 
Input Voltage 380V(-25%,+25%)AC
Frequency、Output Voltage 50Hz、50V~1000VDC
Protection Grade IP54
Power distribution Average power distribution
Power factor >0.99
Peak efficiency 95.5%
 Overall efficiency 94%
auxiliary powersupply 12V
humidness <95%
Soft startup time 3 - 8S
Output voltage error <±0.5%
Output current error >30A ,<±1%;<30A ,<±0.3A
Voltage accuracy <0.5%
Steady flow accuracy <1%
 Voltage ripple <1%
 Current sharing <5%
 Load adjustment rate <1%
 Emc GB/T19826 - 2014:5.4
Starting mode Swipe card/small program scan code
Insulation resistance >10MΩ
 Withstand voltage AC2500V
 Display screen 7"touch screen
 Installation mode Floor
Operating temperature -35°C~+55°C
Charging gun length 5m/7m/8m
 Altitude <2000m 
Outer dimension WZ08:700mm600mm1900mm 
Harmonic distortion <5%

How to fast charge a car at a fast DC EV charging station with dual charging guns?

When two electric vehicles are connected to two charging guns of a charging pile, the charging pile establishes a communication connection with the Battery Management System (BMS) of each vehicle through the communication lines inside the charging guns. It confirms the vehicle's identity information, battery status (such as State of Charge, SOC, battery temperature, etc.), and charging requirements. The charging pile needs to dynamically allocate the total output power according to the actual charging needs of both vehicles. This is typically achieved through an internal power management system that decides how to distribute power based on each vehicle's charging request and the current state of the power grid. For example, if one vehicle has a lower battery capacity and the other has a higher battery capacity, the charging pile may prioritize providing a greater charging power to the vehicle with the lower battery capacity. Power conversion then takes place.

Know your supplier
RW Energy
Zhejiang Rockwell Energy Technology Co., Ltd. is an international enterprise specializing in the research, development and manufacturing of recloser controllers, power quality management, power monitoring systems and other high-end power equipment. In today's critical period of global energy transition and power system upgrading, the company has gathered a group of top talents in the fields of power engineering, automation control, software development, etc., who carry the enthusiasm and persistence for the power business, and are committed to overcoming the complex problems in the power system, and promoting the intelligent development of the power industry with innovative technology. Mission: To make global electricity smarter, more reliable and more efficient with innovative technology. Vision: To be the leader in global power intelligence.
Main Categories
High Voltage Electrical Apparatus/New energy/Tester
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$100000000
Professional Experience
12 years
Workplace
30000m²
占位
占位
Related Products
Related Knowledges
Ensuring Reliability: A Deep Dive into Transformer Maintenance
Ensuring Reliability: A Deep Dive into Transformer Maintenance
IntroductionElectric transformers are the backbone of modern power distribution systems, silently enabling the reliable delivery of electricity to homes, businesses, and industries. As these critical assets age and the demand for uninterrupted power grows, the importance of diligent transformer maintenance has never been greater. This essay explores the essential role of transformer maintenance, highlighting the value of proactive care, the impact of advanced diagnostic technologies, and the tra
Vziman
09/03/2025
How does a transformer work?
How does a transformer work?
Transformer Operation PrincipleA transformer is an electrical device that operates on the principle of electromagnetic induction to transfer electrical energy from one circuit to another. It enables the adjustment of voltage levels within an alternating current (AC) system, either stepping up (increasing) or stepping down (decreasing) voltage while maintaining the same frequency.Working Principle:Basic ComponentsA transformer consists of two coils, known as windings—the "primary winding" connect
Rockwell
09/03/2025
Constant testing of high-voltage cable lines
Constant testing of high-voltage cable lines
1. Definition of High-Voltage Cable Line Constant TestingHigh-voltage cable line constant testing refers to the systematic measurement, using specialized instruments, of electrical parameters such as resistance, inductance, capacitance, and conductance before a cable line is commissioned or after major maintenance. The aim is to obtain fundamental data characterizing the electromagnetic properties of the cable, serving as a critical testing phase that provides accurate parameter support for powe
Oliver Watts
09/03/2025
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
1.Work Environment Requirements and Safeguard MeasuresBased on technical requirements for cable equipment storage, laying, transportation, laying, transposition, testing, and cable terminations, the project owner and construction units have conducted extensive trials and implemented protective measures regarding ambient temperature, humidity, bending radius, traction control, and route optimization. These measures ensure high-voltage cable quality and on-site safety under harsh winter conditions
James
09/03/2025
Withstand voltage test of high-voltage cables
Withstand voltage test of high-voltage cables
Withstand voltage test is an insulation test, but it is a destructive test that can reveal insulation defects difficult to detect in non-destructive testing.The test cycle for high-voltage cables is three years, and it must be conducted after non-destructive tests. In other words, the withstand voltage test is performed only after all non-destructive tests have been passed.Most high-voltage cables used today are cross-linked polyethylene (XLPE) cables, which can have large cross-sections and cov
Oliver Watts
09/03/2025
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
I. Introduction to Cable Grounding Loop CurrentCables rated 110 kV and above use a single-core structure. The alternating magnetic field generated by the operating current induces a voltage on the metallic sheath. If the sheath forms a closed circuit through the earth, a grounding loop current will flow on the metallic sheath. Excessive grounding loop current (loop current exceeding 50 A, more than 20% of the load current, or a ratio of maximum-to-minimum phase current greater than 3) not only a
Felix Spark
09/03/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!