Oliver Watts
qalab: Baxbûna û Testkirina
China

Rêbazerin da Testandina Transformator û Dibistanên Wekheviyên

1. Testandina Bushingên Bêt-porselên

1.1 Pirûzhatiya Isolasyon

Bushinga bi kranê an rêzikên serberast bikin. Pirûzhatiyan îro e hesab bikin di nav terminala û tap/french de bi karîna megohmmetra 2500V. Nermarên hatine hatine neke çend bike ji nermarên fabrika li ser şertên mihenan. Ji bo bushingên kapasitiv ên bi daxwazên 66kV û derbas û bi bushingên tap, pirûzhatiyan îro e hesab bikin di nav "bushinga biçûk" û flange de bi karîna megohmmetra 2500V. Ev nermar neke bibe piçeyên 1000MΩ.

1.2 Pêşkirina Hesabkirina Zeviya Elektrik

Tan delta (factor of dissipation) û nermarên kapasitiv ya isolasyonê sereke bi tap bikin bi rêzikên positive wiring method, bi pêşniyarên cihazê. Jixwe test voltage 10kV hilbijêrin. Rêzikên high-voltage test leads bi tapeyên isolasyon lêve bikin, her du dikare were lêve kirin ji xebit û zemin, bi amanî yên wekheviyên taybet. Nermarên tan delta û kapasitiv hatine neke çend bike ji nermarên fabrika û divê parastên handover standards.

2. Îmara da Tap-Changer-a Li Ser Carga û Testandina Wê

Îmara da sequence-ê a tam da tap-changer contacts bikin, nermarên transition resistance value û switching time e hesab bikin. Nermarên transition resistance values, three-phase synchronization deviation, switching time values, û forward-reverse switching time deviation hatine parastên dibistanên teknîkî yên malperê.

3. Hesabkirina Direkt Current Resistance yê Windings bi Bushings

Hesabkirina DC resistance yê high-voltage winding di hewlên tap position û low-voltage side bikin. Ji bo transformatorên bi neutral points, destnîşan hesabkirina single-phase DC resistance bikin. Nermarên ambient temperature di dema hesabkirinê re tevahînin ji bo conversion û comparison bi nermarên fabrika. Deviation between lines or phases divê parastên handover standards.

4. Check Voltage Ratio yê All Tap Positions

Rêzikên turns ratio tester connect bikin bi high and low voltage sides yê three-phase transformer. Check the voltage ratio yê all tap positions. Ji bo data nameplate yê malperê, neke çend bike, û ratios divê parastên expected patterns. Di tap position rated de, allowable error ±0.5%. Ji bo three-winding transformers, perform ratio tests separately for high-medium, medium-low windings.

Power transformer.jpg

5. Check Three-Phase Connection Group û Polarity of Single-Phase Transformer Leads

Neticeyên îmara hatine parastên dibistanên design, markings nameplate, û symbols di casing yê transformer de.

6. Sampling û Testing yê Insulating Oil

Sampling yê oil tenha di dema ku transformator bi oil full bikin û allowed to stand for the specified time bikin. Ji bo collecting oil samples, containers bi rastî seal bikin û ji bo testing bi department relevant send bikin.

7. Hesabkirina Insulation Resistance, Absorption Ratio or Polarization Index

Hemû testandina insulation-related tenha di dema ku insulating oil passed testing û weather conditions with acceptable humidity bikin. Ji bo transformers requiring polarization index measurement, verify that the megohmmeter short-circuit current is not less than 2mA. Record the test ambient temperature to enable conversion to the same temperature as factory tests for comparison. The results should not be less than 70% of factory values. Test items should include: high-(medium+low+ground), medium-(high+low+ground), low-(medium+high+ground), total-ground, core-(clamping+ground), and clamping-(core+ground). For example, for high-(medium+low+ground), short-circuit the three phases of the high-voltage side and the corresponding neutral point (if available), ground all other parts, connect the high-voltage terminal of the megohmmeter to the high-voltage side, and the ground terminal to ground for testing.

8. Hesabkirina tan delta (Dissipation Factor) yê Windings bi Bushings

Use the reverse wiring method for testing, following the instrument's specified connections. Test items should be conducted sequentially: high-(medium+low+ground), medium-(high+low+ground), low-(medium+high+ground), total-ground. During testing, suspend the high-voltage test leads of the tan delta tester with insulating tape, keeping them away from the transformer housing. Record the ambient temperature during testing. When converted to the same temperature as factory tests for comparison, the values should not exceed 1.3 times the factory values. If measurements significantly deviate from factory values, clean the bushings or use conductor shielding on the bushings to reduce surface leakage current. Measurements should preferably be conducted during weather with relatively low humidity.

9. Hesabkirina Direct Current Leakage Current yê Windings bi Bushings

Preferably read the leakage current at the high-voltage end. Test items should include: high-(medium+low+ground), medium-(high+low+ground), low-(medium+high+ground). Measurements should be taken during weather with low humidity, with ambient temperature recorded. Leakage current values must not exceed handover standard specifications.

10. Testandina Elektrik

10.1 Testi Deformasyonê Winding

Ji bo transformatoran bi derengên 35kV û dawiyê, metoda impedansê serdast-bendekê taybetmend dihat. Ji bo transformatoran bi derengên 66kV û ber, metoda analîzê pêşketinê daqiq ê taybet dihat ji bîrkarîna xirabehatên bendek.

10.2 Testi AC Dayaşandina Vêran

Testên dayaşandina vêran AC bikin lê terminalên transformator bi karînîna dayaşandinê ya gavê û werger û yê dibarand. Ji kerema xwe testi dayaşandina vêran bi karînîna rizgareya seri dikare were taybet kirin ji bo herkirina piştgiriya karanîna malperên test. Nokta nîtral a transformatoran bi derengên 110kV û ber pirsa testên dayaşandina vêran AC bikin. Qiymêtan dayaşandina vêran hewce ye ku bigihin standarden handover.

10.3 Testi Bendek Dibarand Di demê Derê Ji Bîrkarîna Môceranda Parçeyê

Ji bo transformatoran bi derengên 220kV û ber, divê testên dibarand di demê derê ji bîrkarîna môceranda parçeyê bikin di demê nûvekirina şertor. Ji bo transformatoran 110kV, testên môceranda parçeyê taybet dihen ji kerema xwe jî heke îsul be. Ev testan çewtên îsulê navendî yên transformatorên ku ne bibin şikakandin.

10.4 Testi Serderkirina Dar Dema Derengê

Bi rêyên taybetî yên plana destpêkê.

10.5 Verifikasyona Faz

Verifikasyonê sequensyayê fazê ya transformator bikin, ku divê wek sequensyayê fazê ya gridê be.

Bexşişek bidin û nuşkarê wê bikevin!​
Pêşniyariyek
Pêşnîyar bişînin​
Daxistin
IEE-Business Zêdekirin Bîzînin Wekandin
Bi karanîna sepanê IEE-Business, li her der û her dem amûr bibînin, çareseriyan bistînin, bi pîsporan re têkiliyê ava bikin, û beşdarî hevkariya pîşesaziyê bibin — ev hemû ji pêşveçûna projeyên hêz û karsaziya we re piştgirîyeke tev e.​