Saboda ingancin lokaci da karkashin zinde ta hanyar gida, manajan da take kan 6kV na tafkin masu aiki 6 na wata jirgin ruwa na musamman suna da hadadi masu rausa kalmomi, abubuwan da ba su dace da kusan karfiyar kofin da suka fi sani, da kuma nasara cikakken al'amuran da suka shafi. Wannan hadadai sun yi rausa ga aiki mai zurfi na tafki, wanda yake da kyau zuwa fagen. Amma idan muna neman abubuwan da aka samu a nan bayan wasu muhimmin mutane suka rauni sauya da wuraren kamar yadda ake koyi waɗansu na madada, an yi takaitaccen kofin da ke da ilimi. An fito programin kontrollo na ilimi a kan ECMS da ke da shi, an sanya cikin maƙafofin da suka haifar da shiga/kwance, tattaunawa, da kuma tattalin arziki don in iya yi amfani da butuɗi ko kuma tattaunawa na darasi, inda yawancin mutane za su dogara daga gida da suka yi aiki domin in bincike damar aiki.
1. Ingantacce Mai Yawa Na Fagen Da Kofin Ilimi
Kofin ilimi yana iya tattauna parametolin elektriko na abubuwan da ke da shi tun daga duk biyu a kan kontrollo, tattaunawa, da kuma al'amurarin tattalin arziki. Ana amfani da maƙafofin da suka haifar da shiga/kwance, tattaunawa, da kuma kofin karfiyar kofin da suka haifar da shiga/kwance, don in iya yi aiki na ilimi. Wannan fagen ya kunshi biyu na abubuwan da su dace: "ilimin aiki" da "tattaunawa masu darasi". Ana samun al'amurarin tattalin arziki na harmoni da kuma tattaunawa masu ilimi na motori don in iya saukar da yanayin darasi na abubuwan da ke da shi. Idan akwai abubuwan da ba su dace kamar tattalin jiha na kabilon da suka haifar da shiga, kasa na maƙafofin, darashe na kofin, da kuma kadan masu ilimi na motori, ana yi tattaunawa da kuma tattalin arziki a nan bayan al'adun tattalin arziki, don in iya ba da taimaka ga damar aiki na abubuwan da ke da shi.
2. Tarihin Fagen Da Kofin Ilimi
(1) Gargajiya Ilimin Aiki
An fito programin kontrollo na ilimi a kan ECMS da ke da shi. Saboda MRC units na ABB na da shi a nan yana da kyau da hard wiring, don in iya rage costin haɗin kabilon da kuma abubuwan da ke da tattaunawa da kontrollo, an amfani da Wislink2000 industrial switch a kan ECMS don in iya tattalika da WDZ - 5200 series integrated protection devices na mafi girman sama a kan kofin tun daga RS485. Sannan an sanya protection devices zuwa MRC units tun daga hard wiring. A nan, an yi amfani da funktiyonin electric operation na circuit breakers/contactors da kuma earthing switches, wanda ya rage kontrollo linki da kuma ci gaban damar aiki.
(2) Tattaunawa Masu Darasi Da Zaman Lissafin Aiki Da Iya Bincike
A nan tattaunawa masu darasi, ana sanya cikin maƙafofin da suka haifar da tattaunawa na jiha na kabilon da suka haifar da shiga, da kuma tattaunawa na darasi na kofin, da kuma samun al'amurarin tattalin arziki na harmoni da kuma tattaunawa masu ilimi na motori. Tun daga MyRemoteCare system na ABB, ana tattauna yanayin darasi na abubuwan da ke da shi a nan lokacin, da kuma in iya tabbatar da tsawon karamin abubuwan da ke da shi. Tun hakan, lissafin aiki da iya bincike za su ci gaban da "preventive maintenance" zuwa "proactive predictive management", wanda yake rage tsawon karamin abubuwan da ke da shi, da kuma in iya ba da damar aiki mai zurfi na tafki.
3. Bayanan Functiyonin Ilimin Aiki
(1) Full Electric Drive Protection Mechanism
Kofin ya kasance da maƙafofin da suka haifar da shiga/kwance na ilimi. Idan akwai abubuwan da ba su dace kamar kasa, an yi tasiri a nan output current na motori, wanda yake jagoranci programin protection don in iya kwalbar power na motori, kwallaye electric operation, da kuma faɗinsa indicator light na rausa game da kuma in iya rage karamin kasa mai tsawo.
Don electric operation na circuit breaker/contactor handcart da kuma earthing switch, design ya kunshi:
(2) Programmed Operation Logic
4. Bayanan Functionin Tattaunawa Masu Darasi
(1) Real-time Diagnosis Based on Load Changes
To timely identify potential equipment defects and hidden hazards, issue early warnings, prevent problem escalation, and reduce the probability of unexpected power outages, wireless radio frequency technology is adopted to real-time collect and monitor parameters such as temperature rise of switch contacts/lead terminals and switch dynamic characteristic asynchrony. Meanwhile, the operation records collected by the online monitoring and diagnosis system during long-term operation provide reliable basis for equipment health assessment.
(2) Online Temperature Monitoring Scheme for Switchgear
(3) Video Remote Monitoring Logic
Video monitoring equipment is configured inside the switchgear to remotely transmit monitoring images, allowing users to real-time view equipment operation status through the host computer and ensure stable equipment operation.
(4) Principle of Online Harmonic Monitoring
When electrical equipment operates under abnormal or degraded conditions, it generates high-order harmonics of different frequencies. The equipment degradation degree is determined through the calculation process of "relative harmonic content → indicator value → standard value": first, the relative harmonic content of each order of current harmonics is divided by the total harmonic distortion of current harmonics of the predetermined order to obtain the indicator value; then, the harmonic function of each order formed by the indicator value is multiplied by the calculated value for each order's diagnosis derived from the relative harmonic content of each order to obtain the standard value; finally, the indicator value is compared with the standard value to determine the equipment degradation degree.
(5) Practice of Motor Insulation Online Monitoring
Insulation testing is required to determine the insulation status of high-voltage motors before power transmission and during daily standby, which is a key link in equipment operation and maintenance and an effective means to ensure system safety. For the regular insulation testing needs of open motors (such as circulating water pump motors and feed water pump motors) and long-term standby motors in the unit, insulation online monitoring devices have been equipped early. The DC high-voltage injection method is used for insulation measurement of cables or motor windings; when the line is powered off, the insulation monitoring device automatically starts insulation monitoring of the feeder circuit, real-timely displaying the insulation values of standby equipment to facilitate daily operation and maintenance.
5. Discussion on Improvement Directions
(1) Centralized Management of Control Power
Introduce line-controlled intelligent miniature circuit breakers accessible to DCS, ECMS, or NCS to achieve centralized control of control power. Cooperate with main equipment racking in/out and switching operations to complete full-process sequential control, deeply integrating into operation management and optimization.
(2) Improvement of Insulation Monitoring System
Add motor insulation online monitoring terminals (supporting residual current monitoring of motor circuits when the motor is powered on) to improve the full-process monitoring of insulation performance for standby and operating equipment:
(3) System Integration Optimization
Connect all operation processes of intelligent switches to the host DCS to replace independent ECMS, reducing investment costs, facilitating centralized DCS control and management of equipment, optimizing and centralizing inspection work, and reducing human resources.
6. Conclusion
6kV switchgear plays a key role in the plant power system, with operation monitoring, power switching, insulation testing, and maintenance being indispensable in daily operation and maintenance. For smart power plant construction, 6kV switchgear must focus on ensuring personnel safety, equipment reliable operation, labor intensity reduction, and condition-based maintenance, continuously optimizing the existing operation and maintenance mode to achieve safer, more efficient, and economical operation.