Hemînê Pêşvera Têkiliyê û Pirametreyên Pêwistinê ji bo Transformerên Cariya GIS ya UHV IEE-Business

Oliver Watts
Oliver Watts
qalab: Baxbûna û Testkirina
China

UHV GIS-daxwaniya, transformatorên dixwazê yên elektrikî hewce ne ji bo pêşkirina cihazên hesabkirina energiya. Deyaxbûnê wan taybetmendiyên bazarên energiya werin çalak kirin, lê hekma bi seran berdest û taybetandîna rêzikariya çalak bikin da ku JJG1021-2007 hewce ye. Li ser yekê, anamên dema, regulyatorên voltajê û boosterekên dixwaza bikin. Ji ber ku di GIS-de de encapment e, test circuits bikin bi ser grounding knives, bushings û return conductors; rastî circuits wirin cablek û taybetandîne.

Soraniyên wek test current mezin, circuits dereng, û impedance mezin hene, lê kompensasyona reaktîf (ji alîya inductive reactance mezin di primary circuits de) hewce ye ku kapasitasyon ên cihazên bike. Peywandekirina parêmetrên primary circuit taybetandîne. Metodên heyî nayên jî ne ji bo primary circuits, lê belgeya ya: UHV GIS current transformer primary circuit structures/features select verification circuits; metodên intelligent çêbikin taybetandîna measurement intelligence/automation.

1 Primary Circuit Selection for UHV GIS Current Transformers
1.1 Structure & Features

GIS substation primary equipment (excluding transformers) integre bikin bi eight components (e.g., CB, DS). Encapsulated in metal shells, GIS offers: miniaturization (via SF6), less space); high reliability (sealed live parts resist environment/earthquakes); safety (no electric shock/fire risks); superior performance (shields EM/static, no interference); short installation (factory assembly cuts on - site time); easy maintenance & long inspection (good structure, advanced arc extinction).

1.2 Circuit Selection

Circuit breakers sit mid - GIS pipelines, with current transformers on both sides. Disconnectors are outside, plus grounding switches for protection. Pipelines use (SF6), and transformers have epoxy resin semi - casting. Due to enclosure, use exposed grounding switches/bushings + return conductors. Four options exist: grounding switches at breaker ends, GIS pipeline shells, large - current conductors, or adjacent GIS busbars as return. After solving reactive compensation, adjacent GIS busbars (safe, simple, operable) are chosen for on - site verification.

2 Research on GIS Primary Circuit Intelligent Measurement Systems
2.1 Parameter Measurement Method Analysis

GIS primary circuits have equivalent resistance R and inductive reactance (ZL). Conventional methods (measure R, apply AC, calculate complex impedance Z then (ZL) need many devices, complex ops, and heavy calculations. This paper develops intelligent systems. Key tasks: system design (component matching, process planning); determine signal collection (points, methods, circuits for voltage/current); find voltage - current phase difference calculation; select line parameter methods (from amplitude/phase difference, get equivalent resistance/inductive reactance); overcome harmonics/interference for accuracy.

2.2 Overall Design of the Intelligent Measurement System

The intelligent measurement system centers around a microcontroller - based computer system, equipped with buttons, a display, a printer, and other peripherals. The voltage and current signals are captured by the signal acquisition system, then processed through a filter, multiplexer switch, automatic signal gain amplifier, and analog - to - digital (A/D) converter before reaching the microcontroller for signal processing. The hardware principle is illustrated in Figure 1.

System Components

  • Signal Acquisition System: Captures voltage and current signals from the circuit.

  • Filter: Eliminates interference signals.

  • Multiplexer Switch: Enables voltage and current signals to share one A/D converter, reducing hardware costs.

  • Automatic Signal Gain Amplifier: Adjusts amplification automatically based on signal strength to ensure stable output.

  • A/D Converter: Transforms analog signals into digital format for microcontroller processing.

  • Display: Utilizes a direct - read digital screen for easy data viewing.

  • Buttons: Simplifies system operation with user - friendly controls.

  • Printer: Outputs measurement results on demand.

Operational Process

The acquired signals are processed and transmitted to the microcontroller, which runs pre - installed signal processing programs. The system analyzes the data via dedicated software, computes the results, and displays them on the screen.

2.3 Design of the Signal Acquisition Circuit

Given that measuring primary circuit parameters doesn’t require high currents, the system uses a regulated power supply with a 200A output. After passing through a current booster, the induced current on the line side is significantly lower than the GIS rated current, minimizing the need for large - capacity equipment. This setup keeps the current within the safe operating range of the GIS enclosure and grounding switches.

Circuit Options

The signal acquisition circuit can adopt any of the three test circuits discussed earlier (excluding the grounding - switch - based circuit, which doesn’t cover the entire GIS line). Using multiple methods simultaneously can enhance measurement accuracy. During testing, voltage and current transformers are installed to convert high primary - side values into manageable secondary - side signals for the acquisition system.

Circuit Design for Adjacent GIS Busbar Return Conductor

When using an adjacent GIS high - current busbar as the return conductor:

  • Connect a voltage transformer in parallel on the current - booster line side.

  • Install a current transformer in series between the current - booster line side and a GIS inlet bushing.

  • Feed the secondary - side voltage and current signals into the acquisition system.

The designed signal acquisition circuit is shown in Figure 2. The collected voltage and current data correspond to the total values of the circuit.

2.4 Selection of Calculation Method for Voltage and Current Phase Difference

This measurement system uses the zero - crossing phase angle method to measure the phase difference between voltage and current. The so - called zero - crossing phase angle method is to shape the fundamental wave components of the collected voltage and current signals into square waves, obtain their respective zero - crossing pulses through a differential circuit, measure the time difference between the two pulses, and then calculate the phase difference between the voltage and current.

Assume that the time of the rising edge of the voltage square wave is τ1 and the time of the rising edge of the current square wave is τ2. Then, the calculation formula for the phase difference φ between the two signals is as follows:

Among them: T is the period of voltage and current. Since the frequency of voltage and current is 50 Hz, its period is 0.02 s. The calculation formula for the phase difference of voltage and current can be simplified as:

2.5 Calculation Method for Line Parameters

These calculation processes have been programmed into the microcontroller's memory. Specialized signal - processing software is used to automatically handle the data, and the results are displayed on the device's monitor. For the convenience of analysis, the voltage and current mentioned below are by default considered to have been converted to the voltage and current of the primary side.

Assume that the amplitude of the total line voltage collected by the signal acquisition system is U, and the amplitude of the line current is I. Then, the total line resistance R1 and inductance L1 can be obtained from the following formulas

If the resistivity of the connecting conductor between the busbars of the GIS outgoing line bushing is measured as ρ, the effective cross - sectional area is s, and the length of the conductor is measured as l, then the impedance calculation formula for this connecting conductor is as follows

Neglecting other connecting conductors, the equivalent resistance R and equivalent inductance L of the primary circuit of the GIS pipeline can be obtained from the following formulas.

Error Control & Optimization

Each measurement method should be repeated 3 times at different intervals to reduce errors. If feasible, use all 3 methods simultaneously and compare results:

  • Consistent results: Average the values.

  • One outlier: Check for loose connections or wiring errors; discard the outlier if issues persist.

  • Inconsistent results: Recheck for interference. Modify the circuit if necessary; revise theoretical parameters if discrepancies remain.

To mitigate interference and harmonics:

  • Install hardware filters in the signal acquisition circuit.

  • Apply FFT software to extract fundamental wave components for calculation.

3. Conclusion

UHV GIS integrates primary equipment in sealed metal tanks, offering immunity to environmental factors, high reliability, and minimal footprint. For current transformer verification, using adjacent GIS busbars as return conductors simplifies wiring and ensures safety, making it ideal for primary detection circuits.

This study introduces an intelligent measurement system for GIS primary circuits, enabling precise measurement of equivalent resistance and inductance. The system's user - friendly interface, high accuracy, and robust anti - interference capabilities advance automation in GIS verification. Further field testing is recommended for validation and refinement.

Bexşişek bidin û nuşkarê wê bikevin!​
Pêşniyariyek
بەخێربێی بە دەستکاری ئامرازی گۆڕەژەکان دەتوانرێت بەدوای هیچ یانەی چاودێری کار بکەیت
بەخێربێی بە دەستکاری ئامرازی گۆڕەژەکان دەتوانرێت بەدوای هیچ یانەی چاودێری کار بکەیت
Transformers li bûyerên elektrîkî ne ku ji aliyê berdewam da jorîn da ku werzanin da ku werzanin biguherînin. Li ser sisteman da ku werzanin da ku werzanin hêsan û daxwazandin, transformers li pir amarên destpêkirin da ku werzanin bikin da ku bi taybetmendiyeyekî zêdetir werzanin bikin. Mînak, cihanên endustriyeyî derbarê werzanin 10 kV digerin, ku di navbera vê reyisî de hatine were guherandina werzanin ya wêjirin. Yawêt, ema yê sah la bixebitin da ku hêsan dikarin da ku hêsan dikarin.1. Rêbaza
Oliver Watts
10/20/2025
Davçan Çerçevekaniyan ji bo Gihazkirina Banka Pêşbazûeyan
Davçan Çerçevekaniyan ji bo Gihazkirina Banka Pêşbazûeyan
Guhêrbarîna Nîrvanê ve Têkiliyekarina Kapasitorên di Sisteman deGuhêrbarîna nîrvanê yekemîn rêzik e ku dibeke xweşdanekirinê ya berhemên werzebûnê, kêm kirina zêdetirên şebêkeyan û serhildana stabîlîtîya sisteman.Barkirên Bêserdar di Sisteman de (Cûrekan Impedans): Ters Induktiv reaktans Kapasitiv reaktansDerêjê Tirandazî yên Daxistin da KapasitoreDi operasyonan sisteman de, kapasitoran têkil in hêsan dikeve ku faktorê guherbarî biguhezine. Di dema derêjê têkiliyê de, derêjê tirandazî mezin dibi
Oliver Watts
10/18/2025
Vacuum Circuit Breaker Withstand Voltage Test Guide

گایدی کۆتایەبکاری ڤولتەژ بەرز بۆ کێشەوەرە ئاسکەری خالاڵ
Vacuum Circuit Breaker Withstand Voltage Test Guide گایدی کۆتایەبکاری ڤولتەژ بەرز بۆ کێشەوەرە ئاسکەری خالاڵ
Standardên Testê Deyvandina Gerêzgirî ya Bresîyarên VakûmBingeha sereke yên testê deyvandina gerêzgirî ya bresîyarên vakûm û dibe ku bi rêjeya standardekê yên endamên elektrîkî têne xwestin çi karûbar ên wekhevîna malperê ve girîng bikin da ku digelkirin an flashoveran di seroperdan de nabe. Prosesa testê divê bi rêjiya hêviyê li ser standardekên endamên elektrîkî hatine saz kirin da ku ew amana malperê û agahîbûna berdest bide.Objektên TestêObjektên testê têne gihandin kanîna herêmî, kanîna kon
Garca
10/18/2025
چۆن دەکەیت پڕاشک لە بڕیارەکانی کوپلە بێهێڵدا بەسەرکەوتوویی بەستەر بدەیت
چۆن دەکەیت پڕاشک لە بڕیارەکانی کوپلە بێهێڵدا بەسەرکەوتوویی بەستەر بدەیت
Testi Integritetê Vacûmî ya Breskerên Dîmender: Yek Pêşkevahyê Nîqaşî yên PerformansaTesti integritetê vacûmî yek rêzik metod ê ye ji bo rengkirina performansa vacûmî ya breskerên dîmender. Ev test dikevekî îmkan dide ku hewceyên isolasyon û xebitandina têkiliyê ya bresker de were rengkirin.Pêştest, bizivîsin ku breskerê bi rastî neşîn kirin û bi rastî girdaye. Metodên mafîrî yên pêwistîna vacûmî jêmên metodê ya paqijeyên berdîn û metodê ya çalakirina kontrola meqnêtî da. Metodê ya paqijeyên ber