Insulation Dielectric Test of Transformer

Encyclopedia
Encyclopedia
Field: Encyclopedia
0
China

Dielectric Test Definition


The dielectric test of a transformer checks the insulation’s ability to handle voltage without breaking down.


Separate Source Voltage Withstand Test of Transformer


This dielectric test checks the main insulation’s ability to withstand voltage between the winding and the earth.


Procedure


  • All three line terminals of the winding to be tested are connected together.



  • Other winding terminals not under test and the transformer tank should be connected to the earth.



  • Then a single-phase power frequency voltage of shape approximately sinusoidal is applied for 60 seconds to the terminals of the winding under test.



  • The test shall be performed on all the windings one by one.


  • The test is successful if the insulation does not break down during the test.

 

750ffe8af9fa2b8ac85537cdc5a2db18.jpeg

 

In this transformer testing, the peak value of voltage is measured, that is why the capacitor voltage divider with digital peak voltmeter is employed as shown in the diagram above. The peal value multiplied by 0.707 (1/√2) is the test voltage.


The values of test voltage for different fully insulated winding are furnished below in the table.


a3b510e758c200156aaccb1913125fc5.jpeg


Induced Voltage Test of Transformer


19d86833ccd9abc79b3a28c9c1e10767.jpeg

 

The induced voltage test of transformer is intended to check the inter turn and line end insulation as well as main insulation to earth and between windings-

 


  • Keep the primary winding of transformer open circuited.



  • Apply three phase voltage to the secondary winding. The applied voltage should be twice of rated voltage of secondary winding in magnitude and frequency.



  • The test should last for 60 seconds.



  • The test shall start with a voltage lower than 1/3 the full test voltage, and it shall be quickly increased up to desired value.



The test is successful if no break down occurs at full test voltage during test.

Give a tip and encourage the author!
Recommended
What Are Combined Transformer Standards? Key Specs & Tests
What Are Combined Transformer Standards? Key Specs & Tests
Combined Instrument Transformers: Technical Requirements and Testing Standards Explained with DataA combined instrument transformer integrates a voltage transformer (VT) and a current transformer (CT) into a single unit. Its design and performance are governed by comprehensive standards covering technical specifications, testing procedures, and operational reliability.1. Technical RequirementsRated Voltage:The primary rated voltages include 3kV, 6kV, 10kV, and 35kV, among others. The secondary v
Edwiin
10/23/2025
How to Choose & Maintain Electric Motors: 6 Key Steps
How to Choose & Maintain Electric Motors: 6 Key Steps
"Selecting a High-Quality Motor" – Remember the Six Key Steps Inspect (Look): Check the motor’s appearanceThe motor’s surface should have a smooth, even paint finish. The nameplate must be properly installed with complete and clear markings, including: model number, serial number, rated power, rated current, rated voltage, allowable temperature rise, connection method, speed, noise level, frequency, protection rating, weight, standard code, duty type, insulation class, manufacturing date, and ma
Felix Spark
10/21/2025
 What Is the Working Principle of a Power Plant Boiler?
What Is the Working Principle of a Power Plant Boiler?
The working principle of a power plant boiler is to utilize the thermal energy released from fuel combustion to heat feedwater, producing a sufficient quantity of superheated steam that meets specified parameters and quality requirements. The amount of steam produced is known as the boiler's evaporation capacity, typically measured in tons per hour (t/h). Steam parameters primarily refer to pressure and temperature, expressed in megapascals (MPa) and degrees Celsius (°C), respectively. Steam qua
Edwiin
10/10/2025
What is the principle of live-line washing for substations?
What is the principle of live-line washing for substations?
Why Do Electrical Equipment Need a "Bath"?Due to atmospheric pollution, contaminants accumulate on insulating porcelain insulators and posts. During rain, this can lead to pollution flashover, which in severe cases may cause insulation breakdown, resulting in short circuits or grounding faults. Therefore, the insulating parts of substation equipment must be periodically washed with water to prevent flashover and avoid insulation degradation that could lead to equipment failure.Which Equipment Is