• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Free Expert Guides on Power Systems, Circuit Design & Electrical Troubleshooting

Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Distribution Equipment Transformer Testing, Inspection, and Maintenance
1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
12/25/2025
Consult
Tip
Consult
Tip
How to Test Insulation Resistance of Distribution Transformers
In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
12/25/2025
Consult
Tip
Consult
Tip
Why are five withstand voltage impulse tests required for distribution transformers or overhauled transformers before official commissioning?
Impulse Testing of New or Overhauled Transformers Before CommissioningDo you know why new or overhauled transformers must undergo impulse testing before official commissioning? This testing verifies whether the transformer's insulation strength can withstand the impact of full voltage or switching overvoltages.The principle behind impulse testing relates to what happens when an unloaded transformer is disconnected. The circuit breaker interrupts a small magnetizing current, potentially forcing c
12/24/2025
Consult
Tip
Consult
Tip
Commissioning Test Procedures for Oil-Immersed Power Transformers
Transformer Commissioning Tests Procedures1. Non-Porcelain Bushing Tests1.1 Insulation ResistanceSuspend the bushing vertically using a crane or support frame. Measure the insulation resistance between the terminal and the tap/flange using a 2500V insulation resistance meter. The measured values should not deviate significantly from factory values under similar environmental conditions. For capacitor-type bushings rated 66kV and above with voltage sampling small bushings, measure the insulation
12/23/2025
Consult
Tip
Consult
Tip
Purpose of Pre-Commissioning Impulse Testing for Power Transformers
No-Load Full-Voltage Switching Impulse Testing for Newly Commissioned TransformersFor newly commissioned transformers, besides conducting necessary tests according to handover test standards and protection/secondary system tests, no-load full-voltage switching impulse tests are typically performed before official energization.Why Perform Impulse Testing?1. Check for Insulation Weaknesses or Defects in the Transformer and Its CircuitWhen disconnecting a no-load transformer, switching overvoltages
12/23/2025
Consult
Tip
Consult
Tip
Power transformers Insulation Resistance & Dielectric Loss Analysis
1 IntroductionPower transformers are among the most critical equipment in power systems, and it is essential to maximize prevention and minimize the occurrence of transformer failures and accidents. Insulation failures of various types account for more than 85% of all transformer accidents. Therefore, to ensure safe transformer operation, regular insulation testing of transformers is necessary to detect insulation defects in advance and promptly address potential accident hazards. Throughout my
12/22/2025
Consult
Tip
Consult
Tip
Commissioning Test Procedures for Oil-Immersed Power Transformers
Transformer Testing Procedures and Requirements1. Non-Porcelain Bushing Tests1.1 Insulation ResistanceSuspend the bushing vertically using a crane or support frame. Measure the insulation resistance between the terminal and the tap/french using a 2500V megohmmeter. The measured values should not significantly deviate from factory values under similar environmental conditions. For capacitive-type bushings rated 66kV and above with tap bushings, measure the insulation resistance between the "small
12/17/2025
Consult
Tip
Consult
Tip
Research on Arcing and Interruption Characteristics of Eco-Friendly Gas-Insulated Ring Main Units
Eco-friendly gas-insulated ring main units (RMUs) are important power distribution equipment in electrical systems, featuring green, environmentally friendly, and high-reliability characteristics. During operation, arc formation and interruption characteristics significantly affect the safety of eco-friendly gas-insulated RMUs. Therefore, in-depth research on these aspects is of great significance for ensuring the safe and stable operation of power systems. This article aims to investigate the a
12/10/2025
Consult
Tip
Consult
Tip
Adjustment Test Operation and Precautions of High-Voltage Power Distribution Cabinets in Power Systems
1. Key Points for Debugging High-Voltage Power Distribution Cabinets in Power Systems1.1 Voltage ControlDuring the debugging of high-voltage power distribution cabinets, voltage and dielectric loss show an inverse relationship. Insufficient detection accuracy and large voltage errors will lead to increased dielectric loss, higher resistance, and leakage. Therefore, it is necessary to strictly control the resistance under low-voltage conditions, analyze current and resistance values, and avoid ex
11/26/2025
Consult
Tip
Consult
Tip
China's first ±550 kV DC GIS completes long-term energized test.
Recently, a ±550 kV DC GIS (Gas-Insulated Switchgear), jointly developed by a Chinese GIS manufacturer and multiple companies, successfully completed a 180-day outdoor long-term energized reliability test at the Xi’an High Voltage Apparatus Research Institute. This marks the first time in the industry that a next-generation ±550 kV DC GIS has passed such a long-term energized evaluation.The ±550 kV DC GIS had already undergone comprehensive performance verification tests at the Xi’an High Voltag
11/25/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.