
1. Zan'ar da Hukuma da amsa mai Tsari
Daga cikin muhimmanci na tsohon kammal, suna da zan'ar da hukuma a yadda ake amfani da suka tsari. Amsa mai tsari shi ne amsa mai kyau.
1.1 Kyaukkyaukan Kirkiyya
- Zan'ar:Kamfanon da take da kirkiyya a wurin da ke gaba
 
- Amsa Mai Tsari:
- Tsarin Kirkiyya na Kudin:Bayyana abokan kirkiyya masu (shiga-radiators) mafi girma, ba ake iya faɗa a kan kamfanon; ya kyau karfiyar kirkiyya ta 40%.
 
- Amfani da Material na Tsarin Dukkana (PCM):Shiga jihohin PCM (melting point 45°C) a kofin jihohin bayyana; ya kyau dukkana tsarin kirkiyya.
 
- Nau'in Nau'in:Abar asali (natural ventilation at 40°C → forced ventilation at 50°C → air conditioning cooling at 60°C).
 
 
1.2 Tafara da Kudin Yawan Makarantar
- Zan'ar:Kawo da yawan makarantar da kudin yawan makarantar a wurin da ke gaba.
 
- Amsa Mai Tsari:
- Kyaukkyaukan 3D:Yadda ake amfani da Z-shaped busbar, ya kyau karfiyar yawan makarantar ta 30%.
 
- Tsarin Sliding-out:Kammal da rail systems, ake iya fitar da unit daban-daban don kula.
 
 
1.3 Kyaukkyaukan Amfani da Tattalin Arzikin
- Zan'ar:Amfani da prefabrication ya haifar da tattalin arzikin.
 
- Amsa Mai Tsari:
- Tsarin Modular:Basic Type (essential functions) / Enhanced Type (+smart monitoring) / Advanced Type (+capacity & voltage regulation).
 
- Innovation na Model na Arziki:EPC + Energy Performance Contracting, amortizing equipment premium through energy savings.
 
- Tsarin Standard:Bayyana library na 12 standard solutions don hakkin tattalin arzikin.
 
 
1.4 Kyaukkyaukan Electromagnetic Interference (EMI)
- Zan'ar:Zan'ar da electromagnetic compatibility (EMC) a wurin da ke gaba.
 
- Amsa Mai Tsari:
- Tsarin Layered Shielding:Kammal da composite structure of μ-alloy (low-frequency shielding) + copper mesh (high-frequency shielding).
 
- Nau'in Active Cancellation:Real-time monitoring and generation of counter electromagnetic fields, achieving field strength suppression of 20dB.
 
- Kyaukkyaukan Topology:Dyn11 connection combined with star-delta windings, suppressing 3rd harmonic by over 90%.
 
 
2. Takardun Iya Amfani da Tattalin Arzikin
Takarda da za a yi don amfani da tattalin arzikin ya buƙata nau'in ilimi da ake koyar da aiki.
2.1 Phase na Planning
- Analysis na Load Characteristic:Amfani da data na smart meter don 8760-hour load simulation to identify peak/valley characteristics (e.g., a food plant found load <40% Sn for 30% of operating time).
 
- Selection na Scenario-based:
 
| 
 Scenario Type 
 | 
 Recommended Model 
 | 
 Technical Focus 
 | 
| 
 Commercial Center 
 | 
 American Compact Type 
 | 
 Low noise, landscape integration 
 | 
| 
 Industrial Zone 
 | 
 European Robust Type 
 | 
 High protection, large capacity 
 | 
| 
 Renewable Plants 
 | 
 Smart Capacity Reg. 
 | 
 Fluctuation adaptation, harmonic sup. 
 | 
| 
 Rural Grid 
 | 
 Simple Economic Type 
 | 
 Capacity reg., pollution flashover prot. 
 | 
- Optimization na Location:Apply Voronoi algorithm to delineate supply zones, ensuring distance from load center to substation ≤500m.
 
2.2 Phase na Design
- Configuration na Modular:Example - Hospital Project:
- Base Unit: 2×800kVA transformers (N+1 redundancy)
 
- Expansion Module: 125kW emergency power interface
 
- Smart Kit: Power quality monitoring + fault pre-warning
 
 
- Application na Digital Twin:Conduct electromagnetic field simulation (ANSYS Maxwell), thermal analysis (Fluent), and structural verification (Static Structural) on a BIM platform to predict design flaws.
 
- Optimization na Connection System:Adopt closed-loop operation (normally open-loop), reducing short-circuit current by 40%.
 
2.3 Phase na Installation
- Innovation na Foundation:Precast concrete base (3-day curing) vs. traditional cast-in-place (28-day curing).
 
- Process na Commissioning:Factory pre-commissioning (90% function verification) → On-site joint commissioning (48 hours).
 
2.4 Phase na Operation & Maintenance (O&M)
- System na Intelligent O&M:
- Layer na Real-time Monitoring:SCADA + IoT platform (5-minute data refresh).
 
- Layer na Analysis & Alert:Lifespan prediction based on equipment degradation models (error <5%).
 
- Layer na Decision Support:Maintenance strategy optimization (reducing O&M costs by 35%).
 
 
- Strategy na Condition-Based Maintenance (CBM):Transition from "time-based maintenance" to "data-driven maintenance"; reduced failure rate by 70% in a water plant case.
 
- Management na Lifecycle:Conduct comprehensive performance assessment every 5 years over a 20-year lifespan, implementing energy efficiency upgrades as appropriate.