GIS Voltage Transformer Whole Lifecycle Cost (LCC) Control Solution: Moving from High-Investment Pain Points to Long-Term Value Optimization

Rockwill
17yrs 700++ staff 108000m²+m² US$150,000,000+ China

Industry Pain Points and Challenges
Gas-insulated switchgear (GIS) voltage transformers (VTs) serve as core monitoring components in modern power grids due to their high reliability. However, their demanding high-voltage insulation structure presents significant challenges that cannot be ignored:

  • High Initial Investment:​ The procurement and installation costs of GIS-VT equipment impose substantial pressure on project budgets.
  • Hidden Cost Black Hole:​ Dedicated spare parts are expensive with long procurement lead times. Power outage losses and emergency repair costs caused by sudden failures often exceed expectations.
  • O&M Efficiency Bottleneck:​ Traditional GIS tank-opening maintenance procedures are complex and time-consuming. Unplanned downtime significantly impacts grid operating economy and reliability.

Innovative Solution: Building a Long-Term Value-Centric Assurance System
To systematically reduce the Whole Lifecycle Cost (LCC) of GIS voltage transformers, we introduce an LCC optimization solution integrating innovative services and product design:

  1. "Equipment-as-a-Service" (EaaS) - 20-Year Comprehensive Assurance Package:
    • Core Service:​ Moving beyond traditional buy/sell models, we offer long-term contractual services covering main equipment, built-in intelligent sensor systems, and critical spare parts (e.g., coil assemblies).
    • Proactive Health Management:​ Integrated remote expert diagnostic platform leverages sensor data for real-time monitoring of insulation gas condition, electrical characteristics, and mechanical performance, enabling predictive maintenance to accurately prevent failures.
    • Value Core:​ Converts high upfront investment and uncontrollable O&M costs into predictable, long-term, smoothed service expenditures, enabling clearer and more efficient financial planning.
  2. Standardized Modular Design - Breakthrough in Rapid Maintenance:
    • Core Component Standardization:​ Deeply decoupled design achieves high physical and electrical interface standardization and modularity for key components (e.g., core coil assemblies).
    • Revolutionary On-site Replacement:​ Under strict process guarantees, key modules can be replaced without requiring the complete dismantling of the GIS busbar enclosure. On-site maintenance time is strictly controlled within 4 hours.
    • Value Core:​ Dramatically compresses unplanned downtime, minimizes economic losses and social impact caused by grid outages, and significantly reduces capital tied up in spare parts inventory.

Expected Benefits: Quantifiable Long-Term Value Enhancement

  • LCC Reduction ≥ 18%:​ Significant comprehensive cost reduction achieved through servitization of equipment, maintenance efficiency improvements, and proactive fault prevention.
  • Investment Payback Period Shortened to ≤ 8 Years:​ Sharp reduction in O&M costs coupled with improved operational reliability substantially accelerates investment recovery, highlighting economic benefits.
  • Failure Loss Reduction ≥ 60%:​ Dual guarantees of predictive maintenance + rapid module replacement drastically reduce unplanned outage losses caused by voltage transformers.
  • Grid Availability Leap:​ Provides critical equipment support for building highly resilient and highly reliable smart grid infrastructure.
07/11/2025
Recommended
Application of New DC Circuit Breakers in Short-Circuit Fault Protection
I. Introduction​With the rapid advancement of modern information technology, intelligence has become a major trend in the development of industrial equipment. In the field of high-voltage switching, intelligent circuit breakers—as critical control components in power systems—form the foundation for automation and intelligence in power systems. This study focuses on an intelligent DC circuit breaker based on single-chip microcomputer (SCM) technology, emphasizing its practical applica
Application Solutions of DC Circuit Breakers in the New Energy Sector
I. Overview​With the rapid development of new energy power generation and electric vehicle (EV) charging facilities, DC systems have imposed higher requirements for safety protection equipment. Traditional AC circuit breakers cannot effectively interrupt DC fault currents, creating an urgent need for specialized DC circuit breaker solutions. This solution provides professional protection configurations for two major application scenarios: photovoltaic (PV) power generation systems and EV chargin
Low-Cost, Low-Loss DC Arc-Free Circuit Breaker Solution for Rail Transit
I. Solution Overview​This solution addresses the protection needs of DC systems (particularly rail transit traction power supply) against short-circuit faults by proposing a DC circuit breaker solution based on optimized mechanical breaker structure. It achieves arc-free interruption through capacitor voltage control, combining low on-state loss and high reliability, making it suitable for frequent operation scenarios.​II. Core Principle​Utilizes a fast mechanical switch topology combined with p
PEBS Circuit Breaker DC Safety Solution
Solution Overview​In modern renewable energy power systems, such as photovoltaic (PV) power generation and energy storage systems, fault protection on the DC side is a core element for ensuring safe, stable, and efficient operation. The Projoy PEBS series DC miniature circuit breakers are specifically designed for such applications, providing a comprehensive and efficient solution integrating arc control, overload protection, and short-circuit protection. This solution aims to deliver the highes
Seed Inquiry