• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Solar Power Equipment Box-type Transformer(Prefabricated Substation) Aiki na IEE-Business na Kwalbari Solar na Kyautar Tansformar na Bokisi (Substation na Tsarin Gargajiya)

  • Solar Power Equipment Box-type Transformer(Prefabricated Substation)

Abubuwa gaba

Muhimmiya Vziman
Model NO. Solar Power Equipment Box-type Transformer(Prefabricated Substation) Aiki na IEE-Business na Kwalbari Solar na Kyautar Tansformar na Bokisi (Substation na Tsarin Gargajiya)
Rated Voltage 33kV
Kpamshi 500kVA-1600kVA
Siri Compact Substation

Bayani na sayen daga mai wuyaci

Sharararwa

Gwọ́n nǹkà:

  • Àbọ̀ tẹ́lẹ̀fọn ìjìyà Solar Power na Transformer Box tí ó ṣe àmúrẹ̀ ẹ̀ka 0.27kV 0.315kV 0.69kv nínú inverter photovoltaic tí ó ń pè ní ọ̀nà tó jẹ́ gùn èmi sí grid lọ́wọ́lọ́wọ́.

  •  High-voltage switchgear, transformer body and protective fuse are centrally placed in the oil tank. High-voltage/low-voltage pre-installed substation is set up together with low-voltage switchgear and corresponding auxiliary equipment.

  •  Ó jẹ́ ọ̀kan tí ó máa ń lò fún solar power generation kekere ati ọ̀dọ̀.

  •  Execution standard: IEC61850 series, GB/T17467, etc.

Ètò ìṣẹ̀:

Technology tó dára:

  •  Standard anti-corrosion and salt spray environmental plan to meet the stringent environmental requirements of the site.

  •  Compact structure, small footprint, easy installation.

  •  Fully enclosed, fully insulated structure, safe and reliable operation.

  •  Easy to operate, maintenance-free, low equipment cost.

Enclosure:

  •  Adopt cold rolled high quality hot dip galvanized sheet.

  •  The surface is treated by electrostatic spray, and the paint can not be taken off for 50 years.

  •  Laser numerical control equipment cutting, drilling, bending, to ensure the processing accuracy.

  •  Product structure is divided into three parts: high voltage chamber, low voltage chamber and transformer.

  •  The cabinet is mainly pre-installed with: lightning arrester, load switch, transformer tap switch, protection fuse, oil level thermometer, oil level gauge, pressure relief valve, amount of oil discharge valve and other accessories.

  •  The low-voltage side is equipped with main circuit breaker, overvoltage protector, and can be designed and installed in complete sets of automatic measurement and intelligent control system.

  •  The transformer is a low loss oil-immersed transformer produced by WONE You Electric.

Functional units:

  •  Fully sealed structure, using the transformer insulating oil as the insulating medium and heat dissipation medium, overall has the advantages of compact structure, good heat dissipation performance.

  •  The high-voltage indoor door should be equipped with electromagnetic lock and live display. When the high-voltage side is live, the high-voltage chamber door cannot be opened.

  • The external door of the box transformer should be equipped with mechanical lock to meet the five requirements of high-pressure products and ensure personal safety.

 Components:

  •  Choose high-quality brand components such as Chint, Shanghai People Electric, Changshu Electric, etc.

  •  Schneider, ABB high-quality partners.

Supplementary material:

  •  High quality tin - plated busbar copper bar, with insulation sleeve.

  •  Hanhe cable is selected for secondary wiring.

 Processing and assembly:

  • Assembly workers have been trained for at least 6 months.

  • Secondary wiring is fully automatic equipment cutting to ensure reliable wiring.

  • Use power tools to ensure proper torque for bolting reinforcement.

  • The copper wire bus is NC punched and bent.

  • All kinds of experimental tests before leaving the factory to ensure normal operation.

Àwọn ìpinnu nǹkà:

  • Voltage:0.69kV/33kV  0.69kV/11kV.

Conditions of use:

  •  Altitude: ≦2000m.

  • Ambient temperature range: -45℃ -- +45℃.

  • Outdoor wind speed: ≤35m/s.

  • Relative humidity: daily mean ≤95%, monthly mean ≤90%.

  • Installation location: Install in the place without fire, explosion risk, serious pollution, chemical corrosion and violent vibration.

  • If the above normal operating conditions are exceeded, customers can contact our company for customized solutions.

  • The above is suitable for 50/60Hz photovoltaic power generation system, the rated capacity of the transformer is 500~ 1600kVA.

Ordering instructions:

When ordering, the customer shall provide the following information:

  • Main loop scheme diagram and secondary loop system diagram.

  • Electrical schematic diagram of auxiliary circuit and wiring terminal layout.

  •  Equipment layout drawing, combination drawing, floor plan drawing.

  • Brand, model, specification and quantity of main electrical components of the equipment.

  • Incoming and outgoing line method and cable specifications.

  • Device surface color.

  • Other special requirements can be negotiated with the manufacturer.

Maimakanta mai inganci
Kayan da ke zuwa
kima mai yiwuwa da wata
Waktu na kirma
100.0%
≤4h
Gaskiya ta hanyar kamfanin
Workplace: 10000m² Jami'a nanan mafi girma: 300 Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Workplace: 10000m²
Jami'a nanan mafi girma: 300
Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Aiki
Turanci Masana: Design/Manufakturi/Sallar
Ƙananunan Cigaba: Gwọ́n ọkụ̀ àbálòpà/Transformator
Mafarkin tsoro na yawan kulle
Kayan aiki na alaka da amfani, yin amfani, gyara-gyaran da kuma pasuwa na kayan karkashin yanayi, suka kentuwa da kaiwansu masu iko, ingantacciyar hankali da kuma amfani mai kyau.
mabudin aikatan kayan dabbobi sun dawo da idoni masu iko da ma'ajiriyya, sannan suka tabbata inganci, kwayoyin uku da na'ibbicci ne daga babban kayan aikin

Makarantar Mai Yawanci

Zan'antar Ilimi

  • Masu Girma na Tansufurin Daidai da Masana Hadin Kasa
    1. Talaƙin Kasar Kuskure (19 Maris, 2019)A waktin 16:13 a 19 Maris, 2019, alamar da taƙaƙen kuskure ta bayyana cikin tsaftin da aka saba shi cikin kuskure na gurbi na maki na uku. Ta hanyar Shari’ar Amfani da Makin Gwamnati na Kwamnati (DL/T572-2010), masu amfani da makamantun (O&M) su ziyarci halin duniya na maki na uku.Ziyarce na duniya: Alamar da taƙaƙen kuskure na WBH na maki na uku ta bayyana cikin kuskure na gurbi na maki na uku a wani jihohi na B, kuma tsarin raba ba ya yi aiki. Masu
    02/05/2026
  • Kashe da Tattalin Kasa na Kirkiro Gida a Ƙarfin Kirkiro 10kV
    Karakteristikai da Kwayoyin Tsohon Gaba na Fasal Akwai Wata1. Karakteristikai na Fasal Akwai WataSignaolin Alarami na Wasu:Bello na alarami ya kara, kuma lampan na bayani "Fasal Akwai Wata a [X] kV Bus Section [Y]" ta kafa. A cikin sistemai da ke amfani da Petersen coil (coil na paka wata) don kare gaba na neutral point, lampan na "Petersen Coil Operated" kuma ta kafa.Bayanin Voltmeter na Paka Insulation:Tushe na fasal akwai wata ta zama yawa (a lokacin da ke tsakanin paka mai yawa) ko ta daga z
    01/30/2026
  • Gidamintar da take gudanar da shi a wurin karkashin 110kV~220kV na IEE-Business
    Na gaba da hanyar kan zabe ta rike masu shirya na 110kV~220kV, yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suka dace da muhimmanci, kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suke musamman. Kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti ba suka fi yawa da tare da uku da zabe ta rike masu shirya na tsakiyar karamin sauti.Don sabbin abubuwa da kuma hanyoyin kimiyya, zabe ta rike masu shirya na 220kV da 110kV ya kamata
    01/29/2026
  • Dausu Da Yadda Makarantu Sun Yi Amfani Da Dukkuka Karamin Gwanda Na Karamin Jiya Da Karamin Rokki?
    Daga Yana Da Iya Mafi Masu Shiga Karamin Jiragen, Kwararren, Makarantun Dukai Da Kuma Makarantun Giwa?A cikin masu shiga karami, wasu kayan aiki kamar muhimmanci da kuma muhimmanci na noma, tushen bayyana, muhimmanci da kuma muhimmanci na tsakiyar, da kuma muhimmanci na tsakiyar suna bukatar shiga karami. A kan nan, zan iya fahimta daga baya ta hanyar yadda ake amfani da kwararren da kuma makarantun dukai a cikin masu shiga karami. Ba saboda haka, wannan kwararre ya taka rawa masu dalilai da kum
    01/29/2026
  • Yadda ya zama da kyau a kan gwamnati na tsaro kawai tafi daga baya? Ba a tabbas cewa a kan gwamnati na tsaro kawai tafi daga mafi girma?
    Daga cewa Mafi yadda Annabiya na Transformer Daidai Don?A lokacin da transformer ya yi aiki, mafi yadda, tare da kaya, abincin da kuma muhimman da suka da amfani don bincike mafi yadda da windings, suna cikin elektrik field mai girma. A kan takarda wannan elektrik field, suka samu potential mai ukuwa da ground. Idan mafi yadda ba da ground, za a cikin mafi yadda da kaya da tank, zai kasance potential difference wanda zai iya haifar da discharge mai yawa.Kuma, a lokacin da transformer ya yi aiki,
    01/29/2026
  • Fahimtar Tashin Gine na Tashin Kawo Masu Zafi
    I. Maimaita Neutral Point?A cikin transforma da kuma maimaitarai, maimaita neutral point shine maimaitar tana da aiki a kan yawan winding inda tsari mai zurfi daga wannan maimaitar zuwa har daidai na terminal sama da duka. A cikin diagrammin da ake bayar, maimaita O yana nufin maimaita neutral point.II. Yadda Ake Iya Sabon Duka Don Maimaita Neutral Point?Sauran hanyoyi na elektrik da take sabon duka don maimaita neutral point da kasa a cikin systemin AC three-phase yana nufin sabon dukar neutral
    01/29/2026

Halayyar Bubuwa

  • Analisis na Labarai da Dalilai don Turbin Masu Faduwar Zane Don Turbin Mai Sani a Jami'a
    1. Zuruwa na Tarihin Karkashin Da Farkon Iya​1.1 Daban-daban na Zuruwa Wanda Ke Farkon Iya​Transforma da zama a tsaye da kuma transforma da zama a uku ke da daban-daban da suka faruwar da zuruwa. Transforma da zama a tsaye suna amfani da zuruwa na E ko ​zuruwa mai kasa, hakan da transforma da zama a uku suna amfani da zurwa na uku ko gurbin zuwa. Wannan farkon zuwa yana taka muhimmanci ga iya:Zuruwa mai kasa a cikin transforma da zama a tsaye ke hada hanyar tattalin mafi girma, ​na kusan kamar h
    06/19/2025
  • Integirin Sọlusi na Transformers ọnụ nke Nsogbu site na Ụdị Ekwupụta Na-akwado: Ihe Mmemme Nke Teknụziri na Ụzọ Ọhụrụ dị ka Anya bụ Ịtụle Anya
    1. Background and Challenges​Distributed integration of renewable energy sources (photovoltaics (PV), wind power, energy storage) imposes new demands on distribution transformers:​Volatility Handling:​​Renewable energy output is weather-dependent, requiring transformers to possess high overload capacity and dynamic regulation capabilities.​Harmonic Suppression:​​Power electronic devices (inverters, charging piles) introduce harmonics, leading to increased losses and equipment aging.​Multi-Scenar
    06/19/2025
  • Akwụkwọ Nsogbu Nke Isiokwu Ugbu A Site Asia: Egwuregwu, Ọdịnala & Nkasi Isiokwu
    1. Daidokunin da na Nauyin Kirkiro na Taurari a Masarautar Asia​1.1 ​Daidokunin Daɗiyan Tsarin Kirkiro​Kirkiro mai yawa a cikin masarautar Asia: Ana amfani da 220V/230V tsohon-kirkiro kan, amma a wurareen al'adu ana buƙata 380V uku-kirkiro, kuma akwai tsarin kirkiro da ba su dace-ba kamar 415V a wuraren.Yawan kirkiro (HV): Yawancin da ke 6.6kV / 11kV / 22kV (wasu ƙasashin kamar Indonesia sun amfani da 20kV).Tsarin kirkiro ta hanyar (LV): Daidai 230V ko 240V (tsohon-kirkiro biyu-ko biyar).1.2 ​Na
    06/19/2025
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika. Samun Kwatanti Yanzu
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika.
Samun Kwatanti Yanzu
Aika tambaya
+86
Dauke kake saita fayil
Kwamfuta
Samun IEE Business Application
Yi amfani da IEE-Business app don samun abubuwan aikin, samun halayyin, haɗi da malamai, kuma kai tsauraran takaiddun kasoshin duka lokaci, duka wurin—dole bai karfin takamaltar hulɗin ku na alintakargida da kasuwanci.