• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Din Rail Electricity Meter Single Phase Company with LCD Display

  • Din Rail Electricity Meter Single Phase Company with LCD Display
  • Din Rail Electricity Meter Single Phase Company with LCD Display
  • Din Rail Electricity Meter Single Phase Company with LCD Display

Key attributes

Brand Wone
Model NO. Din Rail Electricity Meter Single Phase Company with LCD Display
Rated voltage 230V
Rated normal current 5(50)A
Series DDS353

Product descriptions from the supplier

Description

Description

The DDS353 Series Digital Power Meter works directly connected to a maximum load 50A AC circuit.

This meter has been MID B&D Certified by SGS UK, proving both it’s accuracy and quality.

This certification allows this model to be used for any sub-billing applications.

Specifications

Main
Range DDS353
Product or Componet Type Energy meter
Country of origin China
Complementary
Phase Single Phase
Type of measurement

KWh Total=Forward energy only

Metering type

Measurement

Device Application

Solar Power

Energy Charge

Accuracy class Class 1.0S
Rated Current 0,25-5(30)A,0,25-5(32)A,0,25-5(40)A,

0,25-5(45)A,0,25-5(50)A

Rated Voltage

230V

Network Frequency 50-60Hz
Technology Type Electronic
Display Type LCD display
Sampling rate ------
Maximum value measured 99999.99kWh
Tariff input -----------
Communication port protocol Modbus-RTU
Communication port support  RS485
Local signalling

------

Number of inputs -------
Number of Outputs --------------
Output voltage 230V
Mounting Mode Clip-on
Mounting Support DIN rail
Connections - terminals

-------

Standards

EN50470-1/3



Environment
IP degree of protection

IP40 front panel: conforming to IEC 60529

 IP20 body: conforming to IEC 60529

Relative humidity 5…95 % 97 °F (36 °C)
Ambient air temperature for operation -12…158 °F (-25…70 °C) - IEC
Ambient Air Temperature for Storage -30…185 °F (-40…85 °C)
Operating altitude < 9842.52 ft (3000 m)
Dimensions 116mm*18mm*63mm
Packing Units
Unit Type of Package 1 PCE
Number of Units in Package 1 1
Package 1 Height 50cm
Package 1 Width 60cm
Package 1 Length 70cm
Package 1 Weight 1.000kg



Dimensions

dds353meterdimensions-1.jpg



Diagram for installation

dds353diagramforinstallation-21.jpg

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 65666m²m² Total staff: 300+ Highest Annual Export(usD): 50000000
Workplace: 65666m²m²
Total staff: 300+
Highest Annual Export(usD): 50000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: Wire cable/High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Integrated Electrical Equipment/Production equipment/Generator/Electrical fittings
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding Electrodes
    Impact of DC Bias in Transformers at Renewable Energy Stations Near UHVDC Grounding ElectrodesWhen the grounding electrode of an Ultra-High-Voltage Direct Current (UHVDC) transmission system is located close to a renewable energy power station, the return current flowing through the earth can cause a rise in ground potential around the electrode area. This ground potential rise leads to a shift in the neutral-point potential of nearby power transformers, inducing DC bias (or DC offset) in their
    01/15/2026
  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.