• 2MW High Voltage Dummy Load for Generator
  • 2MW High Voltage Dummy Load for Generator
2MW High Voltage Dummy Load for Generator
discuss personally
Model
LB-400/2000
LB-6/2000
LB-380/2000
LB-10.5/2000
Basic info
Brand Wone
Model NO. 2MW High Voltage Dummy Load for Generator
Rated voltage 400V
Power 2000KW
Series LB
Product Detail

Description

The machine has its own cooling system, when temperature of the machine is too high that it unload automatically. The equipment used to test the output power and loading capacity of High Voltage Generator. The load bank power input adopts sectional type, with remote control, easy to operation.Load bank using energy consumption method, air forced cooling, air dispersion, so that machine noise reduces greatly.

Parameter

image.png

image.png

System Constitution

image.png


 Test function

  • Load bank testing: User could load any power within rated power, can test stable state three-phase voltage, current, active power, reactive power, apparent power, power factor, frequency, running time of generating set.

  •  Control Mode: local, remote or intelligent control(software) for choosing.

  • Local Control: local control panel with several power steps, load or unload by switch on-off and read parameter values from measuring meter.

  • Remote Control:through the switch in the remote control box, control the load over a long distance.

  •  Intelligent Control: through data processing software, realize all the test functions, display, record and manage the testing data, and generate curves, graphs and tables can be printed.

  • Control Mode Interlock: with control mode switch, no matter chooses which mode, operation of other mode is invalid, avoid the clash.

  • One-key load/unload: Whether load/unload by local control panel or by PC software control, user can pre-set the user can pre-set the power then press the master load button..

Software function

  •  Communication Mode: using photoelectric isolated RS485 communication serial port connect to PC, and with great anti-interference performance to make system control stable. Through converts like USB or RS232 realize communication protocol conversion.

  •  Load Mode: manual load or automatic load

  •  Manual Load: input power and power factor, and load according to the preset value.

  •  Automatic Load: set several load stages and duration, then complete the process according this stages automatically. 0%- 25%,- 50%,- 75%, -100%

  •  Real-time Monitor: through software display main parameter value, such as voltage, current, power, power factor, frequency and time.

  •  Security monitoring and control: monitor working state of the load bank by watching software light, when abnormally stop and protect, it can show the reason.

  •  Data Collection Interval: the minimum data resolving time is 2s.



Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Ensuring Reliability: A Deep Dive into Transformer Maintenance
Ensuring Reliability: A Deep Dive into Transformer Maintenance
IntroductionElectric transformers are the backbone of modern power distribution systems, silently enabling the reliable delivery of electricity to homes, businesses, and industries. As these critical assets age and the demand for uninterrupted power grows, the importance of diligent transformer maintenance has never been greater. This essay explores the essential role of transformer maintenance, highlighting the value of proactive care, the impact of advanced diagnostic technologies, and the tra
Vziman
09/03/2025
How does a transformer work?
How does a transformer work?
Transformer Operation PrincipleA transformer is an electrical device that operates on the principle of electromagnetic induction to transfer electrical energy from one circuit to another. It enables the adjustment of voltage levels within an alternating current (AC) system, either stepping up (increasing) or stepping down (decreasing) voltage while maintaining the same frequency.Working Principle:Basic ComponentsA transformer consists of two coils, known as windings—the "primary winding" connect
Rockwell
09/03/2025
Constant testing of high-voltage cable lines
Constant testing of high-voltage cable lines
1. Definition of High-Voltage Cable Line Constant TestingHigh-voltage cable line constant testing refers to the systematic measurement, using specialized instruments, of electrical parameters such as resistance, inductance, capacitance, and conductance before a cable line is commissioned or after major maintenance. The aim is to obtain fundamental data characterizing the electromagnetic properties of the cable, serving as a critical testing phase that provides accurate parameter support for powe
Oliver Watts
09/03/2025
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
Technical Analysis of 220 kV High-Voltage Cable Construction in Winter
1.Work Environment Requirements and Safeguard MeasuresBased on technical requirements for cable equipment storage, laying, transportation, laying, transposition, testing, and cable terminations, the project owner and construction units have conducted extensive trials and implemented protective measures regarding ambient temperature, humidity, bending radius, traction control, and route optimization. These measures ensure high-voltage cable quality and on-site safety under harsh winter conditions
James
09/03/2025
Withstand voltage test of high-voltage cables
Withstand voltage test of high-voltage cables
Withstand voltage test is an insulation test, but it is a destructive test that can reveal insulation defects difficult to detect in non-destructive testing.The test cycle for high-voltage cables is three years, and it must be conducted after non-destructive tests. In other words, the withstand voltage test is performed only after all non-destructive tests have been passed.Most high-voltage cables used today are cross-linked polyethylene (XLPE) cables, which can have large cross-sections and cov
Oliver Watts
09/03/2025
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
I. Introduction to Cable Grounding Loop CurrentCables rated 110 kV and above use a single-core structure. The alternating magnetic field generated by the operating current induces a voltage on the metallic sheath. If the sheath forms a closed circuit through the earth, a grounding loop current will flow on the metallic sheath. Excessive grounding loop current (loop current exceeding 50 A, more than 20% of the load current, or a ratio of maximum-to-minimum phase current greater than 3) not only a
Felix Spark
09/03/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!