75 kVA Single Phase Pole Mounted Transformer Akwụkwọ ịkụmara ejiri ụzọ ọ bụla nke 75 kVA na-enye isi obere

  • 75 kVA Single Phase Pole Mounted Transformer

Abubuwa gaba

Muhimmiya Vziman
Model NO. 75 kVA Single Phase Pole Mounted Transformer Akwụkwọ ịkụmara ejiri ụzọ ọ bụla nke 75 kVA na-enye isi obere
Rated Voltage 11kV
Kpọmkwem kwamnyereke 75kVA
Siri Single Phase Pole Mounted Transformer

Bayani na sayen daga mai wuyaci

Sharararwa

Ga-akwado na mba:

  •  WONE ni onye eji eme ihe dịka transformer site na ụwa na ọtụtụ oge ọdịnala n'oge 10.

  • Transformer ndị single-phase Pole-Mounted na-ekwu na-enwe maka ha bụrụkwa na-eji maka ụgbọalu nkasi elekiri n'obodo ma ọ bụ n'ime ụlọ.

  • Akara nkasi: 11kv, 12.4kv, 13.2kv, 13.8kv na 34.5kv; Akara nkasi: 240 / 480v, 120 / 240V, etc. 

  • Nkọwa Standard: IEEE C57, ANSI C57, IEC60076 .

Nke a ga-akwado teknụzụ:

  •  Nke a na-akwado teknụzụ winding dị elu ka ọ ghọta ikpeazụ lightning.

  •   Magnetic leakage nke ọsọ, ọnụ gwụnye nke ọhụrụ, ọnụ gwụnye nke ọhụrụ maka short circuit.

  • Iron core 45° full oblique joint step laminated structure .

Okpuru:

  • Mitsubishi laser cutting machine na CNC punching, reducing, folding na ọtụtụ ụdị equipment maka ịkwado isi ọgụgụ.

  • ABB robot automatic welding, laser detection, maka ịghọta ikpeazụ, qualified rate of 99.99998%.

  • Electrostatic spray treatment, 50 years of paint (coating corrosion resistance within 100h, hardness ≥0.4).

  • Cylindrical fully sealed construction with self-sealing manual pressure relief valve (according to ANSI specification).

  • Standard NEMA hanger bracket (each device includes pole support bracket plate).

  • Fully sealed structure, maintenance-free, normal operation life of more than 30 years.

Iron core:

  • Material nke iron core bụ high quality cold rolled grain oriented silicon steel sheet with mineral oxide insulation (from Baowu Steel Group China).

  • Minimize loss level, no-load current and noise by controlling the cutting and stacking process of silicon steel sheet.

Winding:

  •  Low voltage windings are made of high quality cable paper wrapped wire.

  • High voltage windings are made of high quality polyurethane enamelled round copper wire.

  • Interlayer insulation using dot adhesive paper, so that the coil bonding into a fixed unit, with excellent insulation resistance.

  • Transformer structure is reliable during normal operation and transportation.

High quality material:

  • Baowu Steel Group production of silicon steel sheet.

  • High quality anaerobic copper from China.

  • CNPC (Kunlun Petroleum) High quality transformer oil (25#).

Other:

  •  High strength polymer low pressure casing or high and low pressure porcelain casing.

  • Equipped with ring type full copper tinned terminal.

  •  Install limited current fuses and arresters.

Ordering instructions:

  •  Main parameters of transformer (voltage, capacity, loss and other main parameters) .

  • Transformer use environment (altitude, temperature, humidity, place, etc) .

  • Other customized requirements (tap switch, color, oil pillow, etc) .

  • The minimum order quantity is 1 set, global delivery within 7 days .

  •  The normal delivery period is 30 days, with fast delivery worldwide .

How does the oil-immersed transformer work as a fire protection device?


Protection Devices:
Gas Relay:

When a fault occurs inside the transformer, such as local overheating, electric arc discharge, etc., the insulating oil will decompose and produce gas. The gas relay is installed in the connecting pipeline between the oil tank and the conservator of the oil - immersed transformer.
Once a certain amount of gas is detected, the gas relay will act. It can take different measures according to the severity of the fault. For example, when the light - gas action occurs, an alarm signal will be sent to remind the operation personnel to check; when the heavy - gas action occurs, the power supply of the transformer will be directly cut off to prevent the fault from further expanding and causing a fire.

Fire Isolation Measures:
In the installation environment of the transformer, fire isolation facilities are usually set up. For example, in a substation, an oil - immersed transformer may be installed in an independent fire - proof compartment.
The fire - proof compartment is constructed with fire - resistant materials, such as fire - bricks, fire - proof coatings, etc. These materials can prevent the spread of fire for a certain period of time (such as 1 - 2 hours, depending on the material properties), buying time for firefighters to come and put out the fire.
In addition, fire - proof dikes may be set up around the transformer to prevent the large - area fire caused by the outflow of insulating oil after the rupture of the transformer's oil tank. The fire - proof dikes can limit the leaked oil within a certain range
.


Maimakanta mai inganci
Kayan da ke zuwa
kima mai yiwuwa da wata
Waktu na kirma
100.0%
≤4h
Gaskiya ta hanyar kamfanin
Workplace: 10000m² Jami'a nanan mafi girma: 300 Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Workplace: 10000m²
Jami'a nanan mafi girma: 300
Zama-zama na Farko da aka Fitowa a Shekarar (USD): 150000000
Aiki
Turanci Masana: Design/Manufakturi/Sallar
Ƙananunan Cigaba: Gwọ́n ọkụ̀ àbálòpà/Transformator
Mafarkin tsoro na yawan kulle
Kayan aiki na alaka da amfani, yin amfani, gyara-gyaran da kuma pasuwa na kayan karkashin yanayi, suka kentuwa da kaiwansu masu iko, ingantacciyar hankali da kuma amfani mai kyau.
mabudin aikatan kayan dabbobi sun dawo da idoni masu iko da ma'ajiriyya, sannan suka tabbata inganci, kwayoyin uku da na'ibbicci ne daga babban kayan aikin

Makarantar Mai Yawanci

Zan'antar Ilimi

  • Masu Girma na Tansufurin Daidai da Masana Hadin Kasa
    1. Talaƙin Kasar Kuskure (19 Maris, 2019)A waktin 16:13 a 19 Maris, 2019, alamar da taƙaƙen kuskure ta bayyana cikin tsaftin da aka saba shi cikin kuskure na gurbi na maki na uku. Ta hanyar Shari’ar Amfani da Makin Gwamnati na Kwamnati (DL/T572-2010), masu amfani da makamantun (O&M) su ziyarci halin duniya na maki na uku.Ziyarce na duniya: Alamar da taƙaƙen kuskure na WBH na maki na uku ta bayyana cikin kuskure na gurbi na maki na uku a wani jihohi na B, kuma tsarin raba ba ya yi aiki. Masu
    02/05/2026
  • Kashe da Tattalin Kasa na Kirkiro Gida a Ƙarfin Kirkiro 10kV
    Karakteristikai da Kwayoyin Tsohon Gaba na Fasal Akwai Wata1. Karakteristikai na Fasal Akwai WataSignaolin Alarami na Wasu:Bello na alarami ya kara, kuma lampan na bayani "Fasal Akwai Wata a [X] kV Bus Section [Y]" ta kafa. A cikin sistemai da ke amfani da Petersen coil (coil na paka wata) don kare gaba na neutral point, lampan na "Petersen Coil Operated" kuma ta kafa.Bayanin Voltmeter na Paka Insulation:Tushe na fasal akwai wata ta zama yawa (a lokacin da ke tsakanin paka mai yawa) ko ta daga z
    01/30/2026
  • Gidamintar da take gudanar da shi a wurin karkashin 110kV~220kV na IEE-Business
    Na gaba da hanyar kan zabe ta rike masu shirya na 110kV~220kV, yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suka dace da muhimmanci, kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti suke musamman. Kuma yana bukata cewa zabe ta rike masu shirya na tsakiyar karamin sauti ba suka fi yawa da tare da uku da zabe ta rike masu shirya na tsakiyar karamin sauti.Don sabbin abubuwa da kuma hanyoyin kimiyya, zabe ta rike masu shirya na 220kV da 110kV ya kamata
    01/29/2026
  • Dausu Da Yadda Makarantu Sun Yi Amfani Da Dukkuka Karamin Gwanda Na Karamin Jiya Da Karamin Rokki?
    Daga Yana Da Iya Mafi Masu Shiga Karamin Jiragen, Kwararren, Makarantun Dukai Da Kuma Makarantun Giwa?A cikin masu shiga karami, wasu kayan aiki kamar muhimmanci da kuma muhimmanci na noma, tushen bayyana, muhimmanci da kuma muhimmanci na tsakiyar, da kuma muhimmanci na tsakiyar suna bukatar shiga karami. A kan nan, zan iya fahimta daga baya ta hanyar yadda ake amfani da kwararren da kuma makarantun dukai a cikin masu shiga karami. Ba saboda haka, wannan kwararre ya taka rawa masu dalilai da kum
    01/29/2026
  • Yadda ya zama da kyau a kan gwamnati na tsaro kawai tafi daga baya? Ba a tabbas cewa a kan gwamnati na tsaro kawai tafi daga mafi girma?
    Daga cewa Mafi yadda Annabiya na Transformer Daidai Don?A lokacin da transformer ya yi aiki, mafi yadda, tare da kaya, abincin da kuma muhimman da suka da amfani don bincike mafi yadda da windings, suna cikin elektrik field mai girma. A kan takarda wannan elektrik field, suka samu potential mai ukuwa da ground. Idan mafi yadda ba da ground, za a cikin mafi yadda da kaya da tank, zai kasance potential difference wanda zai iya haifar da discharge mai yawa.Kuma, a lokacin da transformer ya yi aiki,
    01/29/2026
  • Fahimtar Tashin Gine na Tashin Kawo Masu Zafi
    I. Maimaita Neutral Point?A cikin transforma da kuma maimaitarai, maimaita neutral point shine maimaitar tana da aiki a kan yawan winding inda tsari mai zurfi daga wannan maimaitar zuwa har daidai na terminal sama da duka. A cikin diagrammin da ake bayar, maimaita O yana nufin maimaita neutral point.II. Yadda Ake Iya Sabon Duka Don Maimaita Neutral Point?Sauran hanyoyi na elektrik da take sabon duka don maimaita neutral point da kasa a cikin systemin AC three-phase yana nufin sabon dukar neutral
    01/29/2026
Alwolƙiyoyin haɓakawa masu alaƙa
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika. Samun Kwatanti Yanzu
Babu samun mai arliƙi daidai ba? Sai ma'arikin mai arliƙi gane kika.
Samun Kwatanti Yanzu
Aika tambaya
+86
Dauke kake saita fayil
Kwamfuta
Samun IEE Business Application
Yi amfani da IEE-Business app don samun abubuwan aikin, samun halayyin, haɗi da malamai, kuma kai tsauraran takaiddun kasoshin duka lokaci, duka wurin—dole bai karfin takamaltar hulɗin ku na alintakargida da kasuwanci.