• 550kV Class oil-immersed transformer
  • 550kV Class oil-immersed transformer
550kV Class oil-immersed transformer
discuss personally
Model
SFS10-334000/500
SF10-480000/550
SF10-250000/500
SF10-240000/500
Basic info
Brand ROCKWILL
Model NO. 550kV Class oil-immersed transformer
Rated capacity 334000kVA
Primary voltage 500/√3kV
Secondary voltage 10.5kV
Methods of regulation On Load Voltage Regulating
Winding type Three Winding
Series SF/SFS Series
Product Detail

Overview

Premium Durability: Superior insulation and mechanical resilience allow for extended system life and overall system reliability.reducing the frequency of outages. 

Certified Quality: Oil-immersed power transformers are manufactured, tested and delivered in our accordance with all applicable standards (ANSI, IEEE) maintaining US compliance which simplifies service and retrofitting.

Energy Efficient: Designed to accommodate heavier base loading for extended periods of time with low energy loss and minimal partial discharge for optimized energy savings.

 

Operating condition

1.working temperature:-30℃~40℃

2.Relative humidity: <90% (25℃) 

3.No corrosive gas, no obvious dirt, etc.

4.Altitude: <1000m

 

Applications:

The  500kV power transformers that are critical for high-voltage transmission networks, efficiently stepping up or stepping down power for long-distance bulk electricity transfer. They are primarily used in major utility substations, interregional grid connections, and large-scale power generation plants, ensuring grid stability for high-demand loads.

 

If you need to know about more parameters , Please check the model selection manual.

Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High voltage
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
What aspects should be considered when selecting and installing 35kV combined transformers?
What aspects should be considered when selecting and installing 35kV combined transformers?
The installation quality of combined instrument transformers directly affects whether they can operate safely and stably. Therefore, during the installation process, several key aspects must not be overlooked — such as foundation construction, grounding, sealing checks, testing and commissioning, as well as secondary wiring. Below, I’ll explain these points in a more conversational way.1. Foundation Construction Must Be Solid, Especially in Plateau AreasAlthough a combined instrument
James
07/22/2025
Calculation Method for Distribution Network Grounding Resistance Value (Part 1)
Calculation Method for Distribution Network Grounding Resistance Value (Part 1)
Summary of Issues Related to Distribution Network Grounding Resistance Threshold and CalculationIn the operation of the distribution network, the insufficient ability to identify the grounding resistance is a key issue affecting fault judgment. To reasonably set the threshold, multiple factors need to be comprehensively considered.I. Difficulties and Directions in Balancing ThresholdsThe operating conditions of the grounding resistance are extremely complex. The grounding media may include tree
Leon
07/22/2025
What Tests Are Required for a Qualified Combined Instrument Transformer?
What Tests Are Required for a Qualified Combined Instrument Transformer?
Hi everyone, I’m Oliver, and I’ve been working in the instrument transformer industry for almost eight years now. From a complete newbie to someone who can now handle things independently, I’ve participated in dozens of combined instrument transformer inspections over the years.Today, I’d like to share with you: What tests must a qualified combined instrument transformer go through before leaving the factory or being put into operation? After all, it's a very critical pie
Oliver Watts
07/21/2025
What are the applications and trends of 35kV combined transformers?
What are the applications and trends of 35kV combined transformers?
Applications and Trends of 35kV Combined Instrument Transformers – From Echo’s PerspectiveHey everyone! My name is Echo, and I’ve been working in the field of instrument transformers for 12 years now. Today, I’d like to share some insights about the applications and future trends of 35kV combined instrument transformers. Hope this can give you a glimpse into this fascinating industry.Application Scenarios: More Than Just Metering ToolsFirst off, let's talk about applicati
Echo
07/21/2025
Development of Medium - Voltage Combined Electronic Transformers
Development of Medium - Voltage Combined Electronic Transformers
1 Measurement Principle of Combined Electronic Transformers1.1 Voltage Measurement PrincipleElectronic transformers measure voltage using the capacitive voltage division method. Since the voltage across a capacitor cannot change abruptly, the secondary voltage obtained directly through capacitive voltage division has poor transient response and low measurement accuracy. To improve the measurement accuracy, a precision sampling resistor is connected in parallel across the low-voltage capacitor. I
Dyson
07/21/2025
What are the fault diagnosis and handling technologies for 35kV combined transformers?
What are the fault diagnosis and handling technologies for 35kV combined transformers?
For fault diagnosis and handling of 35kV combined transformers, the following technical means can be adopted:Insulation Fault DiagnosisUse equipment such as high-voltage test transformers, power frequency withstand voltage testers, and partial discharge detection systems to conduct a comprehensive assessment of the insulation performance of combined transformers. When the insulation resistance is found to be lower than 1000MΩ or the dielectric loss factor tanδ exceeds 0.5%, an applic
Felix Spark
07/21/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!