Quid est probatio cable electrici potentiae

  1. Sequentes probationes sunt probatio typi cable electrici potentiae.

    Probationes physicae pro insulamento et vagina

    1. Fortitudo tensilis et elongatio ad fracturam

    2. Senectus in forno aere

    3. Senectus in bomba aerea

    4. Senectus in bomba oxygenii

    5. Hot set

    6. Resistentia oleo

    7. Resistentia lacerationis


    8. Resistentia insulantis

    9. Proba alta voltage (immersio aquae)

    10. Proba inflammabilitatis (solum pro SE-3, SE-4)

    11. Proba aborcionis aquae (pro insulamento)

    12. Proba persulphatis (pro cupro)

    13. Proba annealing (pro cupro)

    14. Proba tensilis (pro aluminio)

    15. Proba involucris (pro aluminio)

    16. Proba resistentiae conductoris (pro omnibus)

    17. Proba crassitudinis insulantis (pro omnibus)

    18. Mensura diametri totius (ubi specificatum)(pro omnibus)


  2. Proba acceptationis: Sequentes constituant probationem acceptationis:

    1. Proba annealing (pro cupro)

    2. Proba tensilis (pro aluminio )

    3. Proba involucris (pro aluminio )

    4. Proba resistentiae conductoris

    5. Proba crassitudinis insulantis et vaginae et diametri totius

    6. Fortitudo tensilis et elongatio ad fracturam insulantis et vaginae

    7. Proba hot set insulantis et vaginae

    8. Proba altae tensionis

    9. Proba resistentiae insulantis

  3. Proba cotidiana: Sequentes constituant probationem cotidianam.

    1. Proba resistentiae conductoris

    2. Proba altae tensionis

    3. Proba resistentiae insulantis

Proba Altae Tensionis (Immersio Aquae) :
Approximative 3 metri longum cor removetur ut exemplar ex cablo vel cordone perfecto. Exemplar tunc ita immittitur in balneum aquae ad temperaturam ambientem ut eius extrema protrudent saltem 200 mm supra superficiem aquae. Post 24 horas, alternans voltage requiritur inter
conductor et aquam. Hoc voltage elevatur secundum necessitatem intra 10 sec et manet constans hoc valore per 5 min. Si exemplar in hac proba deficiat, unum aliud exemplar potest subjici hanc probam.

Probatio super cablis completis (probatio acceptationis et cotidiana) :
Hanc probam oportet gerere inter conductores vel inter conductor et screen/armatura. Proba oportet geri ad voltage requiritur, proba oportet geri ad temperaturam ambientem et tempus applicationis oportet esse 5 min, nullum defectum insulantis contingat.

Proba Inflammabilitatis :
Tempus comburentis post removal flammae non debet excedere 60 sec et pars non affecta a margine inferiore clamps superioris debet esse saltem 50 mm.

Declaratio: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Donum da et auctorem hortare

Suggestus

Accidentia Transformatoris Principalis et Questiones Operationis Gas Luminis
1. Registri accidentis (XIX Martii, MMXIX)Hora XVI:XIIX die XIX Martii, MMXIX, monitorium background reportavit actionem gas levis transformatoris principis numeri III. Conformiter Codex Operationis Transformatorum Electricitatis (DL/T572-2010), personale operationis et maintenance (O&M) inspectavit statum in situ transformatoris principis numeri III.Confirmatio in situ: Panel non-electricus protectionis WBH transformatoris principis numeri III reportavit actionem gas levis phase B corpus tr
02/05/2026
Culpae et Tractatio Terrae Unipolaris in Lineis Distributionis 10kV
Characteristica et Instrumenta Detegendi Defectus Terrae Monofasiales1. Characteristica Defectuum Terrae MonofasialiumSigna Centralia Admonitionis:Campanula admonitionis sonat, et lucerna indicativa inscripta „Defectus Terrae in Sectione Omnibus [X] kV [Y]“ accenditur. In systematibus ubi punctum neutrum per bobinam Petersen (bobinam suppressionis arcus) ad terram connectitur, lucerna indicativa „Bobina Petersen Operatur“ etiam accenditur.Indicationes Voltmetri Monitoris Isolationis:Tensio phase
01/30/2026
Modus operationis terre iunctae puncti neutralis pro transformatoribus retis electricitatis 110kV~220kV
Dispositio modi operis terrae puncti neutralis pro transformatoribus rete electricitatis 110kV~220kV debet exigentias tolerationis insulationis puncti neutralis transformatorum complere, et simul conari ut impedimentum sequentiae nullae stationum transformationis fere immutatum maneat, dum certatur ne impedimentum sequentiae nullae compositum in quocumque puncto raptus circuiti systematis ultra ter impedimentum sequentiae positivae compositum excedat.Pro transformatoribus 220kV et 110kV in novis
01/29/2026
Cur Quare Substationes Lapidem Gravem Calculos et Rupem Fractam Utuntur
Cur Quare Substationes Utuntur Lapidibus, Gravibus, Piscinis et Saxis Tritis?In stationibus transformationis, instrumenta ut transformatores electricitatis et distributionis, lineae transmissionis, transformatores tensionis, transformatores currentis et commutatores disiunctionis omnia terram exigunt. Praeter terram, nunc profundius explorabimus cur gravia et saxa trita in stationibus transformationis saepe utuntur. Quamquam videantur ordinaria, isti lapides partem criticam iuxtaque functionalem
01/29/2026
Inquiry
+86
Click to upload file
Descarica
Obtine Applicatio Commerciale IEE-Business
Utiliza app IEE-Business ad inveniendum apparatus obtinendumque solutiones coniungendum cum peritis et participandum in collaboratione industriale ubique et semper propter totam supportionem tuorum projectorum electricitatis et negotiorum