Cable voltage leakage (also known as insulation failure or leakage current) is a serious electrical issue that can not only damage equipment but also cause fires and personal injuries. Handling cable voltage leakage requires a series of measures, from detection to repair, to ensure the safety and reliable operation of the electrical system. Here are the steps and methods for handling cable voltage leakage:

1. Power Off and Safety Measures

Power Off: First, ensure that the power is disconnected to avoid the risk of electric shock. Use the appropriate circuit breaker or switch to cut off the power.

Personal Protective Equipment (PPE): Wear appropriate personal protective equipment, such as insulating gloves, insulating shoes, and a safety helmet.

2. Detect the Leakage Point

Megohmmeter Test: Use a megohmmeter (also known as an insulation resistance tester) to measure the insulation resistance of the cable. The insulation resistance should be significantly higher than the specified minimum value. If the insulation resistance is low, it indicates a potential insulation fault.

Thermal Imaging Camera: Use a thermal imaging camera to check the temperature of the cables and connection points. Abnormally hot areas may indicate leakage points.

Voltage Detector: Use a non-contact voltage detector to check the cables and connection points to confirm the presence of voltage.

3. Locate the Faulty Point

Visual Inspection: Carefully inspect the appearance of the cable for obvious damage, wear, or cracks.

Physical Inspection: Touch the cables and connection points to check for signs of overheating.

Segment Testing: Divide the cable into several sections and test the insulation resistance of each section separately to narrow down the faulty area.

4. Repair the Leakage Point

Replace the Cable: If the cable is severely damaged, the safest method is to replace the entire cable.

Repair Insulation: For minor insulation damage, you can use insulating tape or insulating sleeves to repair the insulation. Ensure that the repaired insulation meets the original insulation level.

Reconnect: Check all connection points to ensure they are secure and have good contact. Use appropriate terminals and connectors to ensure reliable and safe connections.

5. Preventive Measures

Regular Maintenance: Regularly inspect and maintain the electrical system to identify and address potential insulation issues promptly.

Environmental Protection: Ensure that cables are protected from moisture, high temperatures, chemical corrosion, and other harsh environments. Use appropriate cable protection conduits or sleeves.

Load Management: Distribute electrical loads reasonably to avoid overloading the cables.

6. Re-test and Restore Power

Re-test: After repairs are completed, re-test the cable using a megohmmeter and voltage detector to ensure that the insulation resistance has returned to normal and there is no voltage leakage.

Restore Power: Once everything is confirmed to be normal, gradually restore power and continue monitoring the system's operation.

7. Documentation

Record the Repair Process: Document the inspection and repair process in detail, including the tools, materials, and test results used.

Maintenance Records: Update the maintenance records for the electrical system, noting the time of the fault, the cause, and the repair measures taken, for future reference.

Summary

Handling cable voltage leakage involves a series of steps, including power off and safety measures, detecting the leakage point, locating the faulty point, repairing the leakage point, taking preventive measures, re-testing, and restoring power. Ensure that each step is carried out strictly according to safety procedures to guarantee the safety and reliable operation of the electrical system. 

Kablê şerbeti (herdemên şerbetî ya da şerbetên hewlkerdış de e) pirsema elektrikî ye ku dikarin lêser ên bişkoja tayyar bike, wekhevala şêtina şerbetan û xwaşkirinên çendî bide. Pêşketina kablê şerbeti hewce dike yên pêşketinê, ji berdewamê şêtina herdemê hatine, ku amana wêne û karkeşeyekê kontrol bike. Ji li vir divê rêzik û rêzikên pêşketina kablê şerbeti bin:

1. Elektrîkê derbas bikin û tedbîrên amana

Elektrîkê derbas bikin: Yekem, piştgirî bike ku elektrîkê derbas kiribû yekê bi riska şokê elektrîkî. Bîstîna vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya......

Cable voltage leakage (also known as insulation failure or leakage current) is a serious electrical issue that can not only damage equipment but also cause fires and personal injuries. Handling cable voltage leakage requires a series of measures, from detection to repair, to ensure the safety and reliable operation of the electrical system. Here are the steps and methods for handling cable voltage leakage:

1. Power Off and Safety Measures

Power Off: First, ensure that the power is disconnected to avoid the risk of electric shock. Use the appropriate circuit breaker or switch to cut off the power.

Personal Protective Equipment (PPE): Wear appropriate personal protective equipment, such as insulating gloves, insulating shoes, and a safety helmet.

2. Detect the Leakage Point

Megohmmeter Test: Use a megohmmeter (also known as an insulation resistance tester) to measure the insulation resistance of the cable. The insulation resistance should be significantly higher than the specified minimum value. If the insulation resistance is low, it indicates a potential insulation fault.

Thermal Imaging Camera: Use a thermal imaging camera to check the temperature of the cables and connection points. Abnormally hot areas may indicate leakage points.

Voltage Detector: Use a non-contact voltage detector to check the cables and connection points to confirm the presence of voltage.

3. Locate the Faulty Point

Visual Inspection: Carefully inspect the appearance of the cable for obvious damage, wear, or cracks.

Physical Inspection: Touch the cables and connection points to check for signs of overheating.

Segment Testing: Divide the cable into several sections and test the insulation resistance of each section separately to narrow down the faulty area.

4. Repair the Leakage Point

Replace the Cable: If the cable is severely damaged, the safest method is to replace the entire cable.

Repair Insulation: For minor insulation damage, you can use insulating tape or insulating sleeves to repair the insulation. Ensure that the repaired insulation meets the original insulation level.

Reconnect: Check all connection points to ensure they are secure and have good contact. Use appropriate terminals and connectors to ensure reliable and safe connections.

5. Preventive Measures

Regular Maintenance: Regularly inspect and maintain the electrical system to identify and address potential insulation issues promptly.

Environmental Protection: Ensure that cables are protected from moisture, high temperatures, chemical corrosion, and other harsh environments. Use appropriate cable protection conduits or sleeves.

Load Management: Distribute electrical loads reasonably to avoid overloading the cables.

6. Re-test and Restore Power

Re-test: After repairs are completed, re-test the cable using a megohmmeter and voltage detector to ensure that the insulation resistance has returned to normal and there is no voltage leakage.

Restore Power: Once everything is confirmed to be normal, gradually restore power and continue monitoring the system's operation.

7. Documentation

Record the Repair Process: Document the inspection and repair process in detail, including the tools, materials, and test results used.

Maintenance Records: Update the maintenance records for the electrical system, noting the time of the fault, the cause, and the repair measures taken, for future reference.

Summary

Handling cable voltage leakage involves a series of steps, including power off and safety measures, detecting the leakage point, locating the faulty point, repairing the leakage point, taking preventive measures, re-testing, and restoring power. Ensure that each step is carried out strictly according to safety procedures to guarantee the safety and reliable operation of the electrical system. 

Kablê şerbeti (herdemên şerbetî ya da şerbetên hewlkerdış de e) pirsema elektrikî ye ku dikarin lêser ên bişkoja tayyar bike, wekhevala şêtina şerbetan û xwaşkirinên çendî bide. Pêşketina kablê şerbeti hewce dike yên pêşketinê, ji berdewamê şêtina herdemê hatine, ku amana wêne û karkeşeyekê kontrol bike. Ji li vir divê rêzik û rêzikên pêşketina kablê şerbeti bin:

1. Elektrîkê derbas bikin û tedbîrên amana

Elektrîkê derbas bikin: Yekem, piştgirî bike ku elektrîkê derbas kiribû yekê bi riska şokê elektrîkî. Bîstîna vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya vêjarkê ya......

Piştgirî bike ku elektrîkê derbas kiribû yekê bi riska şokê elektrîkî. Bîstîna vêjarkê ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya duhêma ya............

Piştgirî bike ku elektrîkê derbas kiribû yekê bi riska şokê elektrîkî. Bîstîna vêjarkê ya duhêma bikin.

Pêşvebirina Pêşvebirina (PPE): Pêşvebirina pêşvebirina piştgirî bike, wekhevala kafşên izolate, kafşên izolate û şapikê amana.

2. Herdemê şerbeti şêt bike

Testê Megohmmeter: Megohmmeter (herdemîn testê şerbetî) bikar bîne ji bo şêtina şerbetê kablê. Şerbetê şerbetî hedeşt dibe ji berdewamê minîmuman tayin kirin. Eger şerbetê şerbetî qalîb e, ew nîşan dide ku herdemîn şerbetî heye.

Kamera Termal: Kamera termal bikar bîne ji bo şêtina garmîya kablê û navberên. Navendên çendî garm dikarin nîşan bide ku herdemîn şerbetî ye.

Detektora Voltaj: Detektora voltaj bêkarber bîne ji bo şêtina kablê û navberên li virastina çewtînê voltaj.

3. Navendê çewtînê şêt bike

Şêtina Dîmender: Dîmender şêt bike ji bo şêtina navendên çewtînê zîdetir rastîn, serîn û çendî.

Şêtina Fîzikî: Kablê û navberên bibîne ji bo şêtina nîşaneyên çendî garm.

Testê Parçeyî: Kablê bibin de parçeyî û şerbetê şerbetî ya har parçe şêt bikin ji bo şêtina navendê çewtînê.

4. Çewtînê tevahî bike

Kablê Jînere: Eger kablê çendî çewtîn e, rêziktarîn rêzik e ku kablê yên re jînere.

Çewtînê Şerbetî: Ji bo çewtînê şerbetî kêmtir, tapeyên şerbetî û çemên şerbetî bikar bîne ji bo çewtînê şerbetî. Piştgirî bike ku şerbetê çewtînî şerbetê çewtînî tê gotine.

Navberên Jînere: Navberên jînere şêt bike ji bo şêtina navberên serkeftîn û çavkaniyê. Terminalên û navberên rêzik bikar bîne ji bo navberên serkeftîn û amana.

5. Tedbîrên Pêşkerd

Berkaryên Dîmare: Berkaryên dîmare kontrol bike û pêşkerd bike ji bo şêtina tedbîrên şerbetî çendî.

Parastina Çevreswar: Piştgirî bike ku kablê yên parastina şîn, garmîya bilind, şînîya kimîkî û dinên çendî. Conduitên û çemên kablê yên parastina bikar bîne.

Berkaryên Çendî: Berkatên elektrîkî çendî bikin ji bo şêtina çendî navberên kablê.

6. Testê Jînere û Elektrîkê Jînere

Testê Jînere: Ji bo pêşketina çewtînê, testê kablê yên megohmmeter û detektora voltaj bikin ji bo şêtina şerbetê şerbetî tê gotine û çewtînê voltaj.

Elektrîkê Jînere: Ji bo her tişt tê gotine, elektrîkê jînere û şêtina karkeşeyekê bikerin.

7. Dokumentasyon

Prosesê Çewtînê Nivîsandin: Prosesê şêtina û çewtînê nivîsandin, wekhevala alat, malîmat û encamenên testê bikar bîne.

Nivîsên Pêşkerd: Nivîsên pêşkerd yên sistemê elektrîkî nûve bikin, wekhevala dema çewtînê, sedeya çewtînê û tedbîrên çewtînê, ji bo referansa di demên dawî de.

Taybetmendî

Pêşketina kablê şerbeti hewce dike yên pêşketinê, ji berdewamê elektrîkê derbas bikin û tedbîrên amana, şêtina herdemê şerbeti, şêtina navendê çewtînê, çewtînê herdemê şerbeti, tedbîrên pêşkerd, testê jînere û elektrîkê jînere. Piştgirî bike ku har yan pêşketin ên bi tedbîrên amana pêşketin bikin ji bo amana wêne û karkeşeyekê sistemê elektrîkî. 

Bexşişek bidin û nuşkarê wê bikevin!​
Pêşniyariyek
Cîhanên Xalatên Pirçûnê ya THD ji bo Sistemanên Nîrgiriyê
Cîhanên Xalatên Pirçûnê ya THD ji bo Sistemanên Nîrgiriyê
Kesalahan Toleransi Distorsi Harmonis Total (THD): Analisis Komprehensif Berdasarkan Skenario Aplikasi, Akurasi Peralatan, dan Standar IndustriRentang kesalahan yang dapat diterima untuk Distorsi Harmonis Total (THD) harus dievaluasi berdasarkan konteks aplikasi spesifik, akurasi peralatan pengukuran, dan standar industri yang berlaku. Berikut adalah analisis mendalam dari indikator kinerja utama dalam sistem tenaga, peralatan industri, dan aplikasi pengukuran umum.1. Standar Kesalahan Harmonis
Edwiin
11/03/2025
Kanbarê Sîpana ji bo RMU-yan 24kV bi Şoreşdarên Eko: Bisîv û Yekînlav
Kanbarê Sîpana ji bo RMU-yan 24kV bi Şoreşdarên Eko: Bisîv û Yekînlav
Bingehên bêrdestkirî pêşkeftî bi serbiseyên hewlêr taybetand bêrdestkirina ji bo yekîneyên 24 kV ya dawiyên sîmoran e. Bi hevparastina performansa bêrdestkirî û qubûlkirina biçûk, bikarhêneriya bêrdestkirî pêşkeftî pêşkeftina testên bêrdestkirî digere ne ku di demê de çendiyên nînivîsa an nînivîs-zerdeştê biguhezine. Encapsulation of the pole can address the insulation of the vacuum interrupter and its connected conductors.Ji bo baranê 24 kV a dergeha, bi xwazdaya phase spacing li ser 110 mm, vu
Dyson
11/03/2025
Kîfê û Teknîk Vakûm SF6-yan di Yekîtiya Mîna Heybetan Modern de Bîneve Dabike
Kîfê û Teknîk Vakûm SF6-yan di Yekîtiya Mîna Heybetan Modern de Bîneve Dabike
Yekîneyên sînorê ya hîlber (RMUs) di destpêkirina dawî de hatîn bikar anîn, wekheviya zevî yên nesbendan yên parastî yên malî, çarçoveyên bînistin, binîyên karkirdî, raya, û yeta.Di destpêka nesbendan de, RMU têne 12 kV bişindînê ya navendî wergerandin, ku di navendekirina transestaran de ber 380 V bişindînê ya bicîh hatine sererast kirin. Cihazê ya switçê ya bişindînê ya bicîh enerjiya elektrîkê li ser rêzikên bikarhêzên din jêbirin. Ji bo transestarê ya 1250 kVA li ser komîna nesbendan, yekîne
James
11/03/2025
چی دەبێت THD؟ چۆن پلەی ئەمپێری و کامکاری بەدەست دێت
چی دەبێت THD؟ چۆن پلەی ئەمپێری و کامکاری بەدەست دێت
Endamê taybetînîn dîrokî taybetînîn, stabîlî û bexwestinîyên cîhazên berzandînî hînên ên pirî wan re. Bi pêşketina teknolojîya elektrônîkê taybetînîn, karûbarên nelinek da ku werdigirîna piçavên harmonîkî di cîhazên berzandînî de hatiye çendkirin.Pêşnûsana THDTotal Harmonic Distortion (THD) pêşnûsandin da ku rêzikî rms (root mean square) ya hemî komponentên harmonîk bi rêzikî rms ya komponenta fundamentalî di navenda signalî periodîk de. Ev çendekî belasî ye, yew ji sedde yên din. THD yekemîn we
Encyclopedia
11/01/2025
Pêşnîyar bişînin​
Daxistin
IEE-Business Zêdekirin Bîzînin Wekandin
Bi karanîna sepanê IEE-Business, li her der û her dem amûr bibînin, çareseriyan bistînin, bi pîsporan re têkiliyê ava bikin, û beşdarî hevkariya pîşesaziyê bibin — ev hemû ji pêşveçûna projeyên hêz û karsaziya we re piştgirîyeke tev e.​