Analysis of an Accident involving the arc extinguishing chamber of a ZW32-12 Vacuum Circuit Breaker

Felix Spark
04/21/2025

The ZW32 - 12 vacuum circuit breaker is widely used in the power distribution network. However, the performance of ZW32 - 12 vacuum circuit breakers produced by different manufacturers varies. Some ZW32 - 12 vacuum circuit breakers have relatively low overall performance, with potential operation failures that may lead to power outages in some areas [1]. The outdoor ZW32 - 12 type vacuum circuit breaker has superior performance, long electrical and mechanical service life, and is miniaturized and lightweight.
 
But in actual operation, it may also encounter operation problems due to leakage, short - circuit, or overload. Only by continuously summarizing operation experience and adopting scientific and effective preventive measures can the operation failures of ZW32 - 12 vacuum circuit breakers be reduced or avoided. Scientific analysis of common faults of ZW32 - 12 vacuum circuit breakers and taking certain preventive measures are effective ways to reduce the operation failures of vacuum circuit breakers.
 
The day of the accident was a thunderstorm. During operation, it was found that phase B of the faulty switch lost ground, causing the faulty circuit breaker to trip, and all users at the rear end of the faulty switch experienced a short - term power outage. At that time, only emergency measures could be taken, that is, tripping the vacuum circuit breaker at the previous level of the faulty circuit breaker, disconnecting all the wiring on the power supply side and load side of the faulty circuit breaker, and bridging a bypass switch across both ends of the faulty circuit breaker, thus restoring the normal power supply of the entire line in a short time.
 
The faulty switch was removed from the pole. It was found that the insulation resistance to ground for both closing and opening of phase B on the load side of the faulty switch was zero, while the insulation resistance to ground of the power supply side was non - zero when opening (after removing the incoming and outgoing lines of the circuit breaker, each phase was tested with a megger). Based on the described phenomena, it can be considered that there was a grounding phenomenon in the phase B line on the load side of the switch, and the power supply side line of phase B was normal. This fault was related to the grounding of the load - side line.
 
Through disassembling and inspecting the switch, it was found that the outer part of the arc - extinguishing chamber of the phase B insulating cylinder had a discoloration phenomenon. After disassembling the phase B insulating support, it was found that the arc - extinguishing chamber was burned out. The conditions of the disassembled parts of the arc - extinguishing chamber are as follows: the moving and stationary contacts of the arc - extinguishing chamber were intact, with no obvious burn marks on the surface, but the surface was black and had a relatively thick deposit of soot. There was one burn mark at each end of the shielding cylinder, with a relative position difference of about 180° in the circumferential direction.
 
There were burn marks at the stationary - end grading shield corresponding to the burn mark position at the stationary end of the shielding cylinder, and burn marks at the moving - end bellows and bellows protection cover corresponding to the burn mark position at the moving end. The ceramic shell was burned at the corresponding positions of these two burn marks. The inner wall of the shielding cylinder was black, and the outer wall away from the burn marks was normal in color. There were no abnormal marks on the outer surface of the remaining ceramic shell. The guide sleeve softened and flowed downward. The flowing was severe at the part corresponding to the burn mark at the moving end, and there was an approximate boiling phenomenon. The solidified guide sleeve fixed the moving conductive rod in the open position.

Re - presentation and Analysis of the Accident Phenomena

Judging from the surface state of the moving and stationary contacts of the arc - extinguishing chamber, it shows that the contacts did not experience arc burning in an atmospheric environment, and the contacts should be in an open state; the inner wall surface of the shielding cylinder is black, which is formed by the action of the arc and a small amount of air. The outer side of the shielding cylinder away from the burn marks has no discoloration because it is not affected by the arc, indicating that the arc is a local ablation; the gaps on both sides between the stationary - end grading ring of the arc - extinguishing chamber and the stationary end of the shielding cylinder are severely burned, indicating that arc burning occurred there; the gaps on both sides between the moving end of the shielding cylinder and the protection cover behind the moving - end contact of the arc - extinguishing chamber are severely burned, indicating that arc burning occurred there.
 
The guide sleeve has melting and flowing marks, and the flowing is severe and has a boiling phenomenon at the same position as the burn mark at the moving end, indicating that the high temperature of the arc had a great impact on this area and lasted for a certain period; the solidified guide sleeve fixed the moving conductive rod in the open position, indicating that the switch performed an opening operation during the fault and that the switch was in the open state after the fault; the contact surface has a soot deposit, indicating that its temperature was low during the arc duration and there was no arc burning on its surface in the later stage of the accident development. It also shows that the switch was in the open state in the later stage of the fault. The accident process should be as follows:
Before the fault occurred, the vacuum interrupter had leaked air for some reason. Although there was still a certain degree of vacuum, it no longer met the operating conditions of the vacuum interrupter. When the accident occurred, the circuit breaker was in the closing operating state, and the contacts of the interrupter were closed. When the phase B line on the load side of the switch was grounded, the switch tripped automatically.
 
The interrupters of phases A and C were in good condition and successfully completed the breaking operation. The phase B interrupter, with a vacuum degree that did not meet the operating conditions, still managed to extinguish the arc between the contacts successfully because in a three - phase neutral - ungrounded system, when two phases are broken, the third phase must also be broken.
 
This also confirms that the contact surface was intact, with no obvious ablation even at the edges and corners. The arc combustion was not completely confined between the two contacts and had a certain degree of diffusion, resulting in the blackening of the inner wall of the shielding cylinder.Since the inside of the interrupter was in a low - vacuum state, the vacuum insulation ability was extremely low. This led to the breakdown and arcing between the shielding cylinder and the moving - end bellows protection cover under the recovery voltage, and the arc could not be controlled.
 
The shielding cylinder heated up severely, and its potential changed, causing a breakdown (breakdown at the weakest point) with the stationary - end shielding cover and generating an arc. The arc transferred from the moving end to the stationary end, forming a current path from the power supply to the ground and sustaining the arc combustion until the upper - level switch of this switch tripped and the arc extinguished.There was still a certain degree of vacuum in the vacuum interrupter, but it no longer met the operating conditions due to gas leakage for some reason before the fault occurred.
 
When the accident happened, the circuit breaker was in the closed - circuit operating state, with the contacts of the interrupter closed. When the phase B line on the load side of the switch was grounded, the switch tripped automatically. The interrupters of phases A and C were in good condition and successfully completed the breaking operation.For the phase B interrupter, although the vacuum degree did not meet the operating conditions, the arc between the contacts was still successfully extinguished.
 
This is because in a three - phase neutral - ungrounded system, when two phases are broken, the third phase will inevitably be broken as well. This also confirms that the contact surface was intact, with no obvious ablation even at the edges and corners. The arc combustion was not completely confined between the two contacts and spread to some extent, causing the inner wall of the shielding cylinder to turn black.As the interior of the interrupter was in a low - vacuum state, its vacuum insulation capacity was extremely low. This led to breakdown and arcing between the shielding cylinder and the moving - end bellows protection cover under the recovery voltage, and the arc could not be controlled.
 
The shielding cylinder heated up severely, and its potential changed, resulting in breakdown (at the weakest point) with the stationary - end shielding cover and generating an arc. The arc transferred from the moving end to the stationary end, forming a current path from the power source to the ground and sustaining the arc combustion until the upstream switch of this switch tripped and the arc was extinguished.
Felix Spark

Hey there! I'm an electrical engineer specializing in Failure and Maintenance. I've dedicated my career to ensuring the seamless operation of electrical systems. I excel at diagnosing complex electrical failures, from malfunctioning industrial motors to glitchy power distribution networks. Using state - of - the - art diagnostic tools and my in - depth knowledge, I pinpoint issues quickly. On this platform, I'm eager to share my insights, exchange ideas, and collaborate with fellow experts. Let's work together to enhance the reliability of electrical setups.

Analysis of the Impact of Immersion on the Performance of Low-Voltage Current Transformers
Analysis of the Impact of Immersion on the Performance of Low-Voltage Current Transformers
1 IntroductionLow - voltage current transformers for metering, with a through - core type epoxy resin structure, are widely used in distribution transformer areas and for small - to - medium - sized industrial and commercial electricity consumption. As a range expander for electric energy metering, their performance directly relates to electricity consumption safety and the accuracy of users' trade calculations. Studying long - term immersion's impact on these transformers is practically signifi
Felix Spark
07/17/2025
What are the common faults that occur when low-voltage current transformers are combined with other power equipment?
What are the common faults that occur when low-voltage current transformers are combined with other power equipment?
Low-voltage current transformers, as indispensable measurement and protection devices in power systems, often encounter various faults when used in combination with other power equipment due to environmental factors, equipment linkage issues, and improper installation and maintenance. These faults not only affect the normal operation of power equipment but may also endanger personal safety. Therefore, it is necessary to gain an in-depth understanding of fault types, judgment methods, and prevent
Felix Spark
07/17/2025
What are the common faults of low-voltage voltage transformers?
What are the common faults of low-voltage voltage transformers?
1. Open - Circuit Fault on the Secondary SideOpen - circuit in the secondary side is a typical fault of low - voltage voltage transformers, showing abnormal voltmeter readings (zero/fluctuation), faulty power meters, buzzing noises, and core overheating. When open - circuited, the secondary voltage spikes (no secondary current to balance the primary EMF), causing core saturation, flux distortion, and potential overheating/damage.Causes include loose terminals, poor contact, or human error. In lo
Oliver Watts
07/16/2025
Fault Analysis of Single - Phase Grounding of Three - Phase 4PT Voltage Transformer
Fault Analysis of Single - Phase Grounding of Three - Phase 4PT Voltage Transformer
In 10 kV and 35 kV ungrounded systems, single - phase grounding faults cause minimal current, so protection rarely trips. Per regulations, operation is limited to 2 hours; prolonged undetected faults may worsen, even damaging switches. While the State Grid promotes small - current grounding line selection devices in 110 kV and 220 kV substations, their accuracy remains low, requiring monitoring/operation staff to analyze remote measurements. For ungrounded systems with three - phase 4PT voltage
Felix Spark
07/15/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!