Failure Analysis of Electric Vehicle AC Charging Piles

Felix Spark
Field: Failure and maintenance
China
As new energy electric vehicles become increasingly popular, the number of supporting public charging piles is growing year by year. Whether the measurement value of AC charging piles for electric vehicles is accurate is directly related to the vital interests of the vast number of electric vehicle owners. So, conducting regular mandatory inspections of charging piles is particularly important. Below, combined with relevant regulations and practical work, I’ll share some experience and practices on properly carrying out verification, fault analysis, repair, and correct maintenance of AC charging piles for electric vehicles.
1 Common Faults of AC Charging Piles for Electric Vehicles
During the use of AC charging piles, the main circuit is directly affected by current and voltage stress, which is the main cause of faults in AC charging piles. In terms of fault states, there are mainly two common situations for charging piles.
1.1 The power indicator of the charging pile is not on and it can’t charge
1.1.1 Fault Causes
A possible fault cause is that the charging power connection is abnormal:

The AC charging connection device is not properly connected; there is a fault in the charging pile circuit.

1.1.2 Fault Diagnosis & Troubleshooting
Diagnosis flow as Figure 1.
  • Check distribution cabinet main switch (closed in normal operation; close if open).
  • Test main switch output voltage (L - N, L - PE should be 220V). Abnormal voltage → check/reconnect circuit or replace switch (open, loose, damaged).
  • Test charging pile input voltage (L - N, L - PE should be 220V). Abnormal voltage → reconnect circuit or replace switch (open/damaged).
1.2 Physical Connection Done, Charging Started but No Charge
Occurs when power, plug - battery connection, and standby state are normal. 7 cases:
  • Normal charge but monitoring data shows 0 → Communication fault between pile & system.
    Fix: ① Restart monitoring/server; ② Reboot pile display; ③ Power - cycle display system & program.
  • Charge current <20A (normal state) → Display/program fault.
    Fix: ① Restart display program; ② Power - cycle pile & program; ③ Reinstall display/program.
  • Can’t charge/enter interface → Communication fault.
    Fix: ① Check display parameters; ② Power - cycle display system/program; ③ Reinstall display/program.
  • No BMS communication after display reboot → Communication fault.
    Fix: ① Power - cycle display system/program; ② Reinstall display/program; ③ Replace CAN bus module 200T.
  • BMS normal, voltage normal but 0 current → Mistaken emergency stop press.
    Fix: ① Release emergency stop; ② Check battery & BMS.
  • BMS normal, no charge voltage → Mistaken emergency stop press.
    Fix: ① Release emergency stop; ② Check battery & BMS.
  • BMS normal, voltage fluctuates, 0 current → Charging module fault.
    Fix: Replace module.

2 Proper Use & Maintenance of EV Charging Piles

  • Pre - charge: Inspect equipment (cables, connectors) for damage.
  • Abnormality during use: Press emergency stop → cut all power.
  • Keep flammables/explosives (gases, chemicals) away.
  • Don’t use if gun/cable has defects (cracks, wear, exposed wires).
  • Never unplug during charging; no live - contact with gun core.
  • Avoid outdoor charging in rain/thunder. Prohibit charging if water nears vehicle height.
Give a tip and encourage the author!
Recommended
Analysis of Abnormal Causes of High-Voltage Cable Grounding Circulation and Typical Cases
I. Introduction to Cable Grounding Loop CurrentCables rated 110 kV and above use a single-core structure. The alternating magnetic field generated by the operating current induces a voltage on the metallic sheath. If the sheath forms a closed circuit through the earth, a grounding loop current will flow on the metallic sheath. Excessive grounding loop current (loop current exceeding 50 A, more than 20% of the load current, or a ratio of maximum-to-minimum phase current greater than 3) not only a
Felix Spark
09/03/2025
Repair of high-voltage cable metallic sheaths
I. Functions of Metallic Sheaths and Necessity of RepairThe metallic sheath of high-voltage cables is a metal shielding structure laid outside the insulation layer, including types such as lead sheaths, aluminum sheaths, and steel wire armor. Its core functions include mechanical protection (resisting external impact and compression), electrochemical corrosion protection (isolating moisture and soil pollutants), electromagnetic shielding (reducing electromagnetic interference to the environment)
Felix Spark
09/03/2025
Working Principle and Arc Extinction Mechanism of Magnetic Blowout Device in DC Circuit Breakers
The arc extinguishing system of a DC circuit breaker is crucial for the safe operation of equipment, as the arc generated during current interruption can damage contacts and compromise insulation.In AC systems, the current naturally passes through zero twice per cycle, and AC circuit breakers take full advantage of these zero-crossing points to extinguish the arc.However, DC systems lack natural current zero crossings, making arc extinction significantly more difficult for DC circuit breakers. T
Felix Spark
09/02/2025
Analysis of Common Operational Fault Causes in Smart Electricity Meters
With the continuous development of smart grids, smart electricity meters are being increasingly widely applied, and various types of operational faults in smart meters are frequently encountered in energy measurement work. This paper analyzes the causes of smart meter failures and proposes corresponding solutions, using several actual operational fault cases as examples.1. Black ScreenA black screen refers to a powered meter with no display, which is the most commonly occurring fault in field-op
Felix Spark
09/01/2025
Seed Inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.