What Are the Common Faults of Low-Voltage Voltage Transformers and Their Solutions?

Felix Spark
Felix Spark
Field: Failure and maintenance
China

Open - Circuit Fault on the Secondary Side

Open - circuit in the secondary side is a typical fault of low - voltage voltage transformers, showing abnormal voltmeter readings (zero/fluctuation), faulty power meters, buzzing noises, and core overheating. When open - circuited, the secondary voltage spikes (no secondary current to balance the primary EMF), causing core saturation, flux distortion, and potential overheating/damage.

Causes include loose terminals, poor contact, or human error. In low - voltage systems, the secondary side connects parallel to meters/protection devices (high impedance, near no - load). A break/poor contact forms an open circuit—e.g., rusted 10kV substation terminals caused open - circuit, voltmeter errors, and protection misoperation.

To fix: First, disable misoperation - prone protections. Check joints/terminals (measure secondary resistance with a multimeter). Repair open - circuit points safely. Temporarily short - circuit the secondary at test terminals (not for long - term use).

Insulation Damage Fault

Insulation damage is common, causing high - voltage fuse melting, internal discharge, overheating, or fire. Caused by moisture, rust, dust, or mechanical damage (degrading insulation materials like epoxy resin, silicon steel, or paper).

Epoxy resin’s water absorption rises sharply in high humidity/temperature (95% RH, 65℃), dropping volume resistivity from 1.57×10¹⁵Ω·cm to 5.21×10¹⁴Ω·cm. Dust and vibration accelerate aging.

Example: A 10kV substation’s voltage transformer failed due to water ingress (poor sealing), reducing insulation resistance and melting the high - voltage fuse.

Prevention: Regular insulation tests (>1MΩ, 2500V megohmmeter for 10kV PTs). Keep equipment clean, ensure single - point grounding. For damp transformers: mild cases use hot oil circulation; severe cases need vacuum drying or insulation replacement.

Excessive Error Fault

Excessive error causes mismatched meter readings, metering deviations, and protection misjudgments. Per JJG314 - 2010, errors must stay within limits for 25%–100% rated secondary load. Out - of - range loads (too high/low) cause errors.

Causes: Overloaded secondary, excessive conductor voltage drop, poor contacts, or harsh environments. E.g., long/small - cross - section 10kV secondary wires caused >0.5% metering errors.

Fix: Check secondary connections (ensure good contact). Measure wire length/cross - section; replace/shorten wires if needed. Adjust errors (replace if adjustment fails).

Mechanical Damage Fault

Mechanical damage (winding deformation, loose cores, broken shells) comes from improper transport, installation, or vibration. It harms accuracy and causes partial discharge/insulation issues—e.g., 10kV transformer installation vibration loosened the core, causing noise and errors.

Prevention: Use shock - absorbing packaging (honeycomb cardboard + polyurethane foam) during transport (limit component displacement to <1mm). Install per specs, check structure regularly.

Multi - point Grounding Fault of the Secondary Circuit

Multi - point grounding causes neutral voltage shifts, protection misjudgments. Low - voltage systems require single - point grounding; multi - point grounding creates circulating currents.

Causes: Poor installation, damaged wires, or bad contacts. E.g., 10kV substation B/C phase auxiliary windings grounded together caused over - current, fuse melting, and protection misoperation.

Fix: Identify and remove extra ground points (ensure one ground). Check connections. Test resistance between UN and the protection panel&rsquo;s ground bar (&asymp;0&Omega; indicates multi - point grounding).

Give a tip and encourage the author!
Recommended
10kV RMU Common Faults & Solutions Guide
10kV RMU Common Faults & Solutions Guide
Application Issues and Handling Measures for 10kV Ring Main Units (RMUs)The 10kV ring main unit (RMU) is a common electrical distribution device in urban power distribution networks, primarily used for medium-voltage power supply and distribution. During actual operation, various issues may arise. Below are common problems and corresponding corrective measures.I. Electrical Faults Internal Short Circuit or Poor WiringA short circuit or loose connection inside the RMU can lead to abnormal operati
Echo
10/20/2025
High-Voltage Circuit Breaker Types & Fault Guide
High-Voltage Circuit Breaker Types & Fault Guide
High-Voltage Circuit Breakers: Classification and Fault DiagnosisHigh-voltage circuit breakers are critical protective devices in power systems. They rapidly interrupt current when a fault occurs, preventing damage to equipment from overloads or short circuits. However, due to long-term operation and other factors, circuit breakers may develop faults that require timely diagnosis and troubleshooting.I. Classification of High-Voltage Circuit Breakers1. By Installation Location: Indoor-type: Insta
Felix Spark
10/20/2025
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation! Never install the transformer too far away—avoid placing it in remote mountains or wilderness. Excessive distance not only wastes cables and increases line losses, but also makes management and maintenance difficult. Never choose transformer capacity arbitrarily. Selecting the right capacity is essential. If the capacity is too small, the transformer may be overloaded and easily damaged—overloading beyond 30% should not exceed two hours
James
10/20/2025
How to Maintain Dry-Type Transformers Safely?
How to Maintain Dry-Type Transformers Safely?
Maintenance Procedures for Dry-Type Transformers Put the standby transformer into operation, open the low-voltage side circuit breaker of the transformer to be maintained, remove the control power fuse, and hang a "DO NOT CLOSE" sign on the switch handle. Open the high-voltage side circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the high-voltage cabinet, and hang a "DO NOT CLOSE" sign on the switch handle. For dry-type trans
Felix Spark
10/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.