Peak Value, Average Value and RMS Value

05/27/2025

Definition of Peak Value
The peak value of an alternating quantity refers to the maximum magnitude it reaches within one cycle. Also known as the maximum value, amplitude, or crest value, this parameter for a sinusoidal quantity occurs at 90 degrees, as illustrated in the figure below. Peak values of alternating voltage and current are denoted by Em and Im, respectively.
Average Value of Alternating Quantities
The average value of an alternating voltage or current is defined as the mean of all instantaneous values over one complete cycle.For symmetrical waveforms like sinusoidal signals, the positive half-cycle mirrors the negative half-cycle. Consequently, the average value over a full cycle is zero due to algebraic cancellation.
Since both half-cycles perform work, the average value is calculated without considering sign conventions. Thus, only the positive half-cycle is used to determine the average value for sinusoidal waveforms. This concept is best illustrated through an example:

Divide the positive half cycle into (n) number of equal parts as shown in the above figure

Let i1, i2, i3…….. ibe the mid ordinates

The Average value of current Iav = mean of the mid ordinates

RMS Value Definition and Principle
The RMS (Root Mean Square) value of an alternating current is defined as the steady current that, when passed through a resistor for a specified time, generates the same amount of heat as the alternating current through the same resistor over the same period.
Alternatively, the RMS value is the square root of the mean of the squares of all instantaneous values of the current.
Principle Explanation
Consider an alternating current I flowing through a resistor R for time t, producing the same heat as a direct current Ieff. As illustrated below, the current's cycle is divided into n equal intervals of t/n seconds each:

Let i1, i2, i3,………..in be the mid ordinates

Then the heat produced in

RMS Value Definition and Significance
Mathematically, the RMS (Root Mean Square) value is expressed as Ieff = square root of mean of squares of instantaneous values . This value quantifies the energy transfer capability of an AC source, distinguishing it as the true measure of an alternating current or voltage's practical effect.
Ammeters and voltmeters inherently record RMS values. For instance, a standard domestic single-phase AC supply rated at 230 V, 50 Hz specifies the RMS voltage, as this value dictates the energy delivered to electrical loads. In DC circuits, voltage and current remain constant, simplifying magnitude evaluation, whereas AC systems require specialized metrics due to their time-varying nature. Alternating quantities are characterized by three key parameters: peak value (the maximum instantaneous magnitude), average value (the mean of positive half-cycle values), and RMS value (the effective DC-equivalent for energy transfer). These metrics collectively enable precise analysis of AC system behavior and power transfer.

Zhejiang Vziman Electric Group Co., Ltd. is a high-tech enterprise specializing in R&D, manufacturing, and service of power electrical equipment. Committed to innovation, quality, and customer satisfaction, it supplies smart solutions for global power sectors, covering grid construction, new energy, and industrial distribution. Core Business • Switchgear (GIS, circuit breakers, Recloser, Load break switch) • Distribution equipment (transformers, RMU, smart terminals) • Power automation systems • Engineering services (installation, maintenance, consulting) Technical Strength • Provincial R&D center, multiple patents • Modern production, ISO/GB/IEC/CE/UL certified • High capacity, large-scale delivery support Market & Vision Serves State Grid, Southern Grid, and global projects (Asia, Africa, Europe, etc.). Aims to lead in smart grids and new energy, promoting sustainable energy development.

Difference Between Short Circuit & Overload
Difference Between Short Circuit & Overload
One of the main differences between a short circuit and an overload is that a short circuit occurs due to a fault between conductors (line-to-line) or between a conductor and earth (line-to-ground), whereas an overload refers to a situation where equipment draws more current than its rated capacity from the power supply.Other key differences between the two are explained in the comparison chart below.The term "overload" typically refers to a condition in a circuit or connected device. A circuit
08/28/2025
Difference Between Leading and Lagging Power Factor
Difference Between Leading and Lagging Power Factor
Leading and lagging power factors are two key concepts related to the power factor in AC electrical systems. The main difference lies in the phase relationship between current and voltage: in a leading power factor, the current leads the voltage, whereas in a lagging power factor, the current lags behind the voltage. This behavior depends on the nature of the load in the circuit.What is Power Factor?Power factor is a crucial, dimensionless parameter in AC electrical systems, applicable to both s
08/26/2025
Difference Between Electromagnet and Permanent Magnet
Difference Between Electromagnet and Permanent Magnet
Electromagnets vs. Permanent Magnets: Understanding the Key DifferencesElectromagnets and permanent magnets are the two primary types of materials that exhibit magnetic properties. While both generate magnetic fields, they differ fundamentally in how these fields are produced.An electromagnet generates a magnetic field only when an electric current flows through it. In contrast, a permanent magnet inherently produces its own persistent magnetic field once it has been magnetized, without requirin
08/26/2025
Interpretation of the “Five Mandatory Surveys” for On - site Investigation in the Operation and Maintenance Specialty
Interpretation of the “Five Mandatory Surveys” for On - site Investigation in the Operation and Maintenance Specialty
The power outage and work scopes must be clearly inspectedCollaborate with the site survey leader to confirm the equipment to be maintained and the work area involved. Consider requirements such as the use of special vehicles and large machinery, and safe distances from adjacent energized equipment. Verify on-site whether the proposed power outage scope is sufficient to meet the operational needs.On-site safety measures must be clearly inspectedCollaborate with the site survey leader to verify s
Vziman
08/14/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!