Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Distribution transformer calculations – MS Excel Spreadsheet
Four Fast Transformer CalculationsThe distribution transformer calculations spreadsheet enables rapid computations for the following: ascertaining the MV/LV transformer rating, calculating the rating of the overcurrent protection device on the low - voltage side of the transformer, determining the prospective short - circuit current, and computing the sizes of natural ventilation openings required for the transformer room.Determining the MV/LV Transformer RatingInput Parameters: Primary Rated Vo
04/12/2025
Consult
Tip
Consult
Tip
Connections and working principles of three - phase distribution transformers
Three - Phase TransformersThree - phase power supply can be achieved either by a single three - phase transformer or by interconnecting three single - phase transformers. A single three - phase transformer is more compact in size compared to an equivalent - capacity bank composed of three single - phase transformers.Connections and Working Principles of Three - Phase Distribution TransformersThree - phase transformers are often used in underground switchrooms (or similar spaces) or as pad - moun
04/11/2025
Consult
Tip
Consult
Tip
According to the IEEE C37.122 standard, what are the routine tests for high-voltage gas-insulated substations (GIS)?
As required for routine tests of gas-insulated metal-enclosed switchgear, it is necessary to ensure that each equipment unit undergoes systematic routine tests before leaving the factory. These tests (also known as production tests) core on confirming the consistency between the equipment's operating status and design requirements as well as type-test parameters, serving as an indispensable quality control link after assembly. Test parameters are directly derived from type-test data, so routine
04/08/2025
Consult
Tip
Consult
Tip
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C37.122The final assembly of the gas - insulated substation (GIS) takes place in the field. This is where all the diverse components that make up the GIS are brought together for the first time. Even if it were possible to fully assemble the GIS in a factory, it would still have to be disassembled for transportation, shipped, and then reassembled at the installation site.The objective of the field tests is to confirm that
04/07/2025
Consult
Tip
Consult
Tip
Intelligent switchgear opening and closing time operation acc to IEC 61850
For intelligent switchgear, the opening time is defined as the duration starting from the moment when the first message carrying the trip command (a GOOSE message in accordance with the IEC61850 series) is received through the interface, with the circuit - breaker initially in the closed position, and ending at the instant when the arcing contacts of all poles are separated.Regarding the closing time of intelligent switchgear, it refers to the time span from the reception of the first message co
03/18/2025
Consult
Tip
Consult
Tip
Loss evaluation in transformers based on IEC 60076
I. Definitions of Losses in IEC 6007IEC 60076-1 (General Requirements) and IEC 60076-7 (Loading Guidelines) specify two core types of losses:No-load Loss (P0)Definition: Losses measured when the primary winding is energized at rated voltage and the secondary winding is open-circuited (dominated by core losses).Test Conditions Measured at rated frequency and voltage (typically sinusoidal power frequency). Corrected to reference temperature (75°C for oil-immersed transformers, 115°
02/27/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.