• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Free Expert Guides on Power Systems, Circuit Design & Electrical Troubleshooting

Access free engineering resources from IEE Business—covering power design, circuit layout, equipment selection, and troubleshooting. Expert-developed guides help engineers, procurement, and project teams make better decisions. Stay ahead on smart grids, renewables, efficiency, and AI tools. Improve reliability, reduce downtime, and enhance outcomes with real-world solutions. Explore our knowledge hub today.
Discussion on Construction Techniques for the 20 kV Power Supply System in High-Speed Railways
1. Project OverviewThis project involves the construction of the new Jakarta–Bandung High-Speed Railway, with a mainline length of 142.3 km, including 76.79 km of bridges (54.5%), 16.47 km of tunnels (11.69%), and 47.64 km of embankments (33.81%). Four stations—Halim, Karawang, Padalarang, and Tegal Luar—have been constructed. The Jakarta–Bandung HSR mainline is 142.3 km long, designed for a maximum speed of 350 km/h, with a double-track spacing of 4.6 m, including approximately 83.6 km of balla
11/28/2025
Consult
Tip
Consult
Tip
Send inquiry
+86
Click to upload file

IEE Business will not sell or share your personal information.

Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.