12kV 40.5kV 72.5kV 225kV Vertical Break Disconnect Switch
Vertical-break disconnect switch: up to 72.5kV and above, 630-3150A, lightning impulse 325-650kV, 3s short-time 20-40kA, making peak 50-100kA. For substation isolation duties.
Vertical-break disconnect switch: up to 72.5kV and above, 630-3150A, lightning impulse 325-650kV, 3s short-time 20-40kA, making peak 50-100kA. For substation isolation duties.
Three‑phase group‑operated vertical‑break disconnect switch supports upright, vertical and under‑hung mounting with manual / motor operator, ground‑level operation via linkage‑pipe system. It follows ANSI C37.30.1 and is aligned with relevant IEC disconnect‑switch standards, project customisation available.
High-performance Side-Break Switches: Ensure safe, reliable high-voltage isolation for power systems. Easy to operate, durable—ideal for industrial, distribution, and utility use.
High-quality Vertical Vee Disconnecter: Ensures safe, reliable high-voltage circuit isolation for power systems. Durable, easy to maintain—ideal for utilities and industrial use.
RDS series disconnectors: up to 550kV, 4000A, 63kA. Low-friction, low contact resistance, dead-center interlocking, springless fingers, ice-breaking capability for extreme conditions.
يدعم تكوينات التركيب الأفقي الرأسي، والرأسي، والمعلق من الأسفل. يتاح كل من المشغل اليدوي والمشغل الذي يُشغَّل بمحرك كهربائي كخيارين لتشغيل المجموعة ثلاثية الطور.
فحص بصري دوري كل 6 أشهر؛ وصيانة روتينية في حالة فصل التيار كل 5 سنوات؛ وعمرة دورية شاملة كل 10 سنوات. وفي البيئات القاسية ذات الضباب الملحي أو التلوث، يتم تقصير الدورة إلى كل عامين.
تتبع الصيانة معيار ANSI C37.30.1-2011. ولا يجوز إجراء أعمال التركيب والتشغيل والصيانة إلا بواسطة كوادر مؤهلة ومدربة على التعامل مع معدات الطاقة عالية الجهد.
نظّف سطح التلامس باستخدام وسادة سكوتش-برايت خضراء، ثم ضع طبقة رقيقة ومتساوية من شحم C5-A، وامسح الشحم الزائد.