Core Dilemma in Southeast Asia 12kV Medium Voltage Switchgear​

06/12/2025

Southeast Asia’s rapidly growing power demand (GDP growth >5% annually) combined with extreme climatic conditions—high temperature, humidity, and salt spray corrosion—necessitates balancing lifecycle costs with climate resilience in switchgear selection. This article analyzes the optimal cost-performance solutions between GIS and AIS.

I. GIS vs. AIS Cost Comparison Model (Southeast Asia Context)​​

1. Initial Investment Costs

2. Long-Term Operational Costs
 

  • GIS Advantages:
     Extended maintenance cycles (2 years vs. 1 year for AIS)
     Lower failure rates (SF₆ insulation stability > air)
  • AIS Advantages:
    Lower spare part costs (simple structure, local repairability)
    Zero SF₆ handling fees (critical amid tightening environmental regulations)

 ​Cost Inflection Point: GIS excels in high-load hubs (>10-year operation) for lower TCO, while AIS is economical for distributed nodes (<5 years).

II. Environmental Adaptation Technical Solutions

1. AIS Moisture Reinforcement (for RH >80%)

Triple-Layer Protection:

  • Structural: Aluminum moisture-proof pads + detachable supports (20cm elevation)
  • Airflow: Dual dehumidification ducts + smart dehumidifier synchronization
  • Sealing: Sponge gaskets + moisture-proof cable glands (IP54 rating)
    Case Study: Coastal Vietnamese factories reduced condensation failures by 90% with reinforced AIS.

2. GIS Optimization for Humid Climates

  • Real-time SF₆micro-water monitoring (prevents gas liquefaction in heat)
  • Silver-plated copper busbars (salt spray corrosion resistance, validated in Philippine projects)

III. Scenario-Based Selection Framework

Typical Cases:

  • Singapore CBD: GIS space savings offset premium costs.
  • Cambodian Sihanoukville Industrial Park: China-aided AIS + moisture barriers cost 1/3 of GIS.

IV. Emerging Trends: Hybrid Solutions & Localization

  1. GIS-AIS Hybrid Deployment:
    GIS at core substations (space compression) + reinforced AIS for branches (Jakarta pilot) .
  2. Localized Production:
    AIS assembly in Thailand/Vietnam (30% lower labor vs. China)
    USD-denominated contracts in Cambodia (80% USD circulation) mitigate forex risks .

Conclusion: Optimal Cost = Geographic Adaptation × Lifecycle Calculation

  • GIS: Ideal for land-constrained, high-load hubs (ROI >8 years).
  • Reinforced AIS: Mainstream choice in manufacturing hubs (Vietnam/Cambodia), covering 90% of projects via moisture-proof upgrades .

Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!