Project Background
Indonesia possesses approximately 40% of the world's geothermal resources, with a geothermal power generation potential of 23–28 GW. However, by 2022, only about 2.3 GW had been developed. The government aims to achieve 5,000 MW of installed capacity by 2025 but faces multiple challenges:
These constraints necessitate customized recloser solutions to achieve national capacity targets.
Solution
To address Indonesian geothermal plants’ unique conditions, the following recloser system integrates specialized engineering:
Results Achieved
The advanced reclosers achieved breakthrough reliability enhancements in Indonesia’s extreme geothermal environments, directly addressing grid instability challenges. Key outcomes include: