• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
Zhejiang Wone IT Service Co., Ltd.
1yrs 300++ staff 65666m²+m² US$50,000,000+
Zhejiang Wone IT Service Co., Ltd.
1yrs 300++ staff 65666m²+m² US$50,000,000+
Key attributes
Brand Wone
Model NO. 640 W - 670 W Bifacial high-power Dual cell PERC module (mono)
Power Bifaciality 70%
Max. System Voltage 1500V (IEC)
Max. Series Fuse Rating 35 A
Module Fire Performance CLASS C
Max. power of the module 670 W
Max. efficiency of Module 21.6 %
Series Bifacial MONO PERC
Product descriptions from the supplier
Description

Features

  • Module power up to 670 W Module efficiency up to 21.6 %.

  • Up to 8.9 % lower LCOE Up to 4.6 % lower system cost.

  • Comprehensive LID / LeTID mitigation technology, up to 50% lower degradation.

  • Compatible with mainstream trackers, cost effective product for utility power plant.

  • Better shading tolerance.

Standard

  • 40 °C lower hot spot temperature, greatly reduce module failure rate.

  • Minimizes micro-crack impacts.

  • Heavy snow load up to 5400 Pa, wind load up to 2400 Pa*.

Engineering drawing(mm)

image.png

CS7N-650MB-AG / I-V gurves

image.png

Electrical date/STC*

企业微信截图_17301819004341.png


Electrical date/NMOT*

image.png

Electrical date

image.png

Mechanical charactheristics

image.png

Temperature characteristics

image.png

What is LCOE?

LCOE (Levelized Cost of Energy) refers to the levelized cost of electricity. It is a method used to evaluate the average cost of a power plant throughout its entire life cycle. LCOE takes into account all the expenses of the power plant's construction and operation and apportions them to each unit of electricity produced, thereby measuring the economic viability of a power generation project.

Calculation Formula:

The basic calculation formula for LCOE is as follows:

LCOE = Present Value of Total Costs / Present Value of Total Electricity Generation

Among them, the "Present Value of Total Costs" includes the sum of all costs after discounting, such as construction costs, operation and maintenance costs, fuel costs, decommissioning costs, etc.; the "Present Value of Total Electricity Generation" is the value after discounting of the total electricity generated by the power plant throughout its entire life cycle.


Know your supplier
Wone
Zhejiang Wone IT Service Co., Ltd. 1yrs 300++ staff 65666m²+m² US$50,000,000+
Zhejiang Wone IT Service Co., Ltd.
1yrs 300++ staff 65666m²+m² US$50,000,000+
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 65666m²m² Total staff: 300+ Highest Annual Export(usD): 50,000,000
Workplace: 65666m²m²
Total staff: 300+
Highest Annual Export(usD): 50,000,000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Whole life care manager
Full lifecycle management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Seed Inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.