Unsa ang mga pagsubay sa gigikanan nga kailangan isulbar sa mga voltage transformers?

Oliver Watts
Oliver Watts
Larangan: Pagsusi ug Paghunahuna
China

Praktikal nga Pagbahin sa mga Kahigayonan gikan sa usa ka Electrical Engineer sa Field
Gisulti ni Oliver, 8 Ka Tuig sa Electrical Industry

Kamusta tanang katawo, ako si Oliver, ug nagsilbi na ko sa electrical industry samtang 8 ka tuig.

Gikan sa unang paglibot sa substation commissioning ug equipment inspection, hangtod karon nga nagmamaneho sa maintenance ug fault analysis sa buong power system, ang isa ka adunay paborito nga gipangita sa akong trabaho mao ang voltage transformer (VT / PT).

Bag-o ra, ang usa ka kauban nga just starting out miangutay sa amoa:

“Ano ang dapat nga i-test sa mga voltage transformers? Asa mahibalo kon adunay problema?”

Maayo nga pangutana! Ang daghang mga field workers basi lang kasabot kung connected ba ang wiring o adunay voltage — apan para ma-fully understand ang health condition sa usa ka PT, kinahanglan og series of professional tests.

Karon, ipaubos ko sa inyo sa simple nga language — batas sa akong hands-on experience sa katapusan nga mga tuig — unsa nga mga tests ang typical nga gi-implementar sa mga voltage transformers, asa importante, ug paunsa nga implementar sila.

Walay komplikado nga jargon, walay endless standards — practical nga kaalaman lang nga makagamit sa real life.

1. Asa Importante ang Testing?

Bisan ang voltage transformer simple ra kaayo, adunay tulo ka key roles: measurement, metering, ug protection.

Kon may problema, mahimong magresulta niini:

  • Incorrect meter readings;

  • Protection misoperation or failure;

  • Loss of voltage monitoring across the system.

Konsekwensiya kini nga regular testing is important — sama sa paghatag og full check-up sa imong PT. Makatabang kini sa pagkakat-on sa mga problema sa dili pa mas sayop ug maprevent ang major incidents.

2. Ang Lima ka Pinaka Common nga Mga Test sa Voltage Transformers

Batasan sa akong 8 ka tuig sa field experience, ania ang lima ka pinaka commonly used ug critical tests:

Test 1: Insulation Resistance Test

Purpose: To check insulation between windings and between windings and ground.

This is one of the most basic and essential tests.

Poor insulation can cause signal interference, short circuits, or even explosions.

How to perform it:

  • Use a 2500V megohmmeter for primary to secondary and ground;

  • Use a 1000V megohmmeter for secondary to ground;

  • Measure insulation resistance between primary and secondary, primary to ground, and secondary to ground;

  • Compare with historical data — significant drops mean further investigation is needed.

My advice:

  • Must be done on new installations;

  • Part of annual preventive maintenance;

  • Also test after moisture exposure, lightning strikes, or tripping events.

Test 2: Ratio Test

Purpose: Confirm that the actual voltage ratio matches the nameplate value to ensure accurate measurement and protection.

For example, a PT rated at 10kV/100V must output within tolerance; otherwise, protection relays may misoperate.

How to perform it:

  • Apply a known low voltage (e.g., 100V–400V) to the primary side;

  • Measure the secondary voltage and calculate the actual ratio;

  • Compare with the nameplate — acceptable error is usually ±2%.

My experience:

  • A ratio mismatch may indicate inter-turn shorting;

  • Sometimes it's just incorrect wiring, such as reversed polarity;

  • Always re-test after terminal changes or repairs.

Test 3: Excitation Characteristic Test (Volt-Ampere Curve)

Purpose: Determine if the core is saturated or shows signs of aging or moisture ingress.

This test is especially important for electromagnetic VTs, particularly those in systems prone to ferroresonance.

How to perform it:

  • Apply AC voltage to the secondary winding;

  • Gradually increase the voltage and record current values;

  • Plot the U-I curve and observe the knee point.

Key interpretation:

  • A normal curve will show a clear knee point;

  • A smooth, non-kinked curve suggests core saturation;

  • A steep initial slope may indicate moisture damage.

Real case: I once found abnormal excitation characteristics on a PT — turned out it had water ingress due to poor sealing. After drying, it returned to normal.

Test 4: DC Resistance Test

Purpose: Check for broken strands, turn-to-turn shorts, or poor connections in the windings.

DC resistance testing helps uncover hidden defects inside the windings.

How to perform it:

  • Use a DC resistance tester;

  • Measure the resistance of both primary and secondary windings;

  • Compare results with factory values or previous measurements — deviation should not exceed ±2%.

Important notes:

  • Temperature affects results — best to compare under similar conditions;

  • On large PTs, allow time for discharge before testing to avoid residual charge errors.

Test 5: Dielectric Loss Factor (tanδ) Test

Purpose: Assess the aging or moisture condition of insulation materials.

This advanced test is often used for high-voltage VTs, especially capacitive voltage transformers (CVTs).

How to perform it:

  • Use a tanδ tester;

  • Apply a set voltage and measure the dielectric loss factor;

  • Typically acceptable value is tanδ ≤ 2% (varies by device).

Common issues:

  • High values suggest insulation degradation or moisture;

  • If standard isn't met, consider drying or replacement.

3. Additional Auxiliary Testing Methods

In addition to the five main tests, these supplementary methods are also useful:

Infrared Thermal Imaging

  • Detect overheating at connection points;

  • Identify hotspots early;

  • Especially useful for monitoring operating equipment.

Partial Discharge Detection

  • Detect weak internal discharges;

  • An effective early warning for insulation degradation;

  • Recommended for high-voltage PTs in critical applications.

Wiring Inspection + Polarity Test

  • Ensure correct wiring and consistent polarity;

  • Prevent metering inaccuracies or protection misoperations.

4. My Final Suggestions

As someone with 8 years of field experience, I want to remind all professionals:

“Don’t wait until the voltage transformer fails before thinking about testing.”

Performing regular comprehensive checks every year not only ensures stable system operation but also greatly extends the life of your equipment.

Here are my recommendations for different roles:

For Maintenance Personnel:

  • Learn to use basic instruments (megohmmeters, multimeters, ratio testers);

  • Understand each test procedure and standard;

  • Record test data regularly and build comparison records.

For Technical Staff:

  • Master advanced tests like excitation curves and tanδ;

  • Combine infrared and partial discharge detection to improve diagnostics;

  • Understand the PT’s role in the system to avoid blind operations.

For Managers or Procurement Teams:

  • Clarify testing requirements during equipment selection;

  • Request complete factory test reports from suppliers;

  • Establish lifecycle management and schedule regular inspections.

5. Closing Thoughts

Voltage transformers may seem small, but they play a crucial role in the entire power system.

They’re not just about stepping down voltage — they’re the eyes of the system, the ears of protection, and the heart of metering.

After 8 years in the electrical field, I often say:

“Details determine success or failure, and testing ensures safety.”

If you ever encounter abnormal PT behavior, unusual test results, or don’t know how to diagnose a problem, feel free to reach out — I’m happy to share more hands-on experience and solutions.

May every voltage transformer run stably and safely, safeguarding the accuracy and reliability of our power grid!

— Oliver

Maghatag og tip ug pagsalig sa author
Mga Paksa:
VT
Gipareserbado
Unsa ang Katuyuan nga Dili Mahimong Ishort ang VT ug Iopen ang CT Ginhatagan og Paliwanag
Unsa ang Katuyuan nga Dili Mahimong Ishort ang VT ug Iopen ang CT Ginhatagan og Paliwanag
Tan-awon nato nga ang voltage transformer (VT) dili dapat mogana sa short-circuited, samtang ang current transformer (CT) dili dapat mogana sa open-circuited. Ang pag-short-circuit sa VT o pag-open sa circuit sa CT makapadako sa transformers o makahimo og mga kondisyon nga mapanganib.Gikan sa teoretikal nga pananaw, parehas ang VTs ug CTs mao ang transformers; ang kalainan naglakip sa mga parametro nga gipangandoyan aron masukod. Konseho, bisan sama ra gyud sila sa pipila ka aspeto, unsaon kini
Echo
10/22/2025
Asa kini ang mga Transformer sa Voltaje Nagkakabuto? Pangita og Tunay nga mga Danyos
Asa kini ang mga Transformer sa Voltaje Nagkakabuto? Pangita og Tunay nga mga Danyos
Sa mga circuit sa kuryente, kasagaran ang mga voltage transformer (VTs) mao ang nasira o naburn. Kon ang root cause wala ma-identify ug lang ang transformer ang gi-replace, ang bag-ong unit mahimong mabilis na mosira usab, nang nadisrupt ang supply sa kuryente sa mga user. Taliwala, ang sumusunod nga mga pagsusi kinahanglan gihapon isulod aron matukod ang cause sa pagkabag-o sa VT: Kon ang voltage transformer nag-rupture ug nakita ang oil residue sa silicon steel laminations, ang damage kasagara
Felix Spark
10/22/2025
Ang mga Butangnga Pahibaloan Sa Pag-operasyon Sa Voltage Transformers: Ang Prosidurang De-energizing ug Energizing
Ang mga Butangnga Pahibaloan Sa Pag-operasyon Sa Voltage Transformers: Ang Prosidurang De-energizing ug Energizing
Q: Ano ang mga Patakaran sa Pag-operate para sa Secondary Miniature Circuit Breaker ug High-Voltage Power Supply Durante sa De-energizing ug Energizing sa Voltage Transformer?A: Para sa busbar voltage transformers, ang prinsipyo sa pag-operate sa secondary miniature circuit breaker durung de-energizing ug energizing mao kini: De-energizing:Unang bukasan ang secondary miniature circuit breaker, pagkahuman ibutang ang high-voltage power supply sa voltage transformer (VT). Energizing:Unang energize
Echo
10/22/2025
Paunsa kini ang Pagsulay ug Pagpamahin sa Voltage Transformers Nang Seguro?
Paunsa kini ang Pagsulay ug Pagpamahin sa Voltage Transformers Nang Seguro?
I. Normal nga Operasyon sa Voltage Transformers Ang voltage transformer (VT) mahimong mogamit og dako sa iyang rated capacity sa dugay nga panahon, apan wala kini mahimong mogawas sa iyang maximum capacity. Ang secondary winding sa VT nagdumala og high-impedance instruments, resulta nian ang kaunti kaayo sa secondary current, kasagaran sama sa magnetizing current. Ang voltage drops sa leakage impedances sa primary ug secondary windings kaunti kaayo, nanginahanglan ang VT mobiya sa usa ka kaunti
Edwiin
10/22/2025
Inquiry
Pangutana
Pangutana sa IEE-Business Application
Pangita og mga equipment gamit ang IEE-Business app asa asa ug kailan man sugad og pagkuha og solusyon pagsulay sa mga eksperto ug pagpadayon sa industriya nga pakisayran suportahan ang imong proyekto sa kuryente ug negosyo