According to the IEEE C37.122 standard, what are the routine tests for high-voltage gas-insulated substations (GIS)?
As required for routine tests of gas-insulated metal-enclosed switchgear, it is necessary to ensure that each equipment unit undergoes systematic routine tests before leaving the factory. These tests (also known as production tests) core on confirming the consistency between the equipment's operatin