• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


110/10kV trafiği evrak şeması örneği

Master Electrician
Master Electrician
Alan: Temel Elektrik
0
China

110/10kV trafiği evrak şeması örneği

Ekran görüntüsü 2024-09-24 110435.jpg

Yazarı Ödüllendir ve Cesaretlendir
Önerilen
Relay Protection Types in Substations: A Complete Guide
Relay Protection Types in Substations: A Complete Guide
(1) Generator Protection:Generator protection covers: phase-to-phase short circuits in stator windings, stator ground faults, inter-turn short circuits in stator windings, external short circuits, symmetrical overload, stator overvoltage, single- and double-point grounding in the excitation circuit, and loss of excitation. Tripping actions include shutdown, islanding, limiting fault impact, and alarm signaling.(2) Transformer Protection:Power transformer protection includes: phase-to-phase short
Echo
11/05/2025
Handling 35kV Substation Fault Tripping
Handling 35kV Substation Fault Tripping
Analysis and Handling of Fault Tripping in 35kV Substation Operation1. Analysis of Tripping Faults1.1 Line-Related Tripping FaultsIn power systems, the coverage area is extensive. To meet power supply demands, numerous transmission lines must be installed—posing significant management challenges. Especially for special-purpose lines, installations are often located in remote areas such as suburbs to minimize impact on residential life. However, these remote areas have complex environments, makin
Leon
10/31/2025
 Analysis of Substation Busbar Discharge Faults and Their Solutions
Analysis of Substation Busbar Discharge Faults and Their Solutions
1. Methods for Detecting Busbar Discharge1.1 Insulation Resistance TestThe insulation resistance test is a simple and commonly used method in electrical insulation testing. It is highly sensitive to through-type insulation defects, overall moisture absorption, and surface contamination—conditions that typically result in significantly reduced resistance values. However, it is less effective in detecting localized aging or partial discharge faults.Depending on the equipment’s insulation class and
Edwiin
10/31/2025
Handling Substation Blackout: Step-by-Step Guide
Handling Substation Blackout: Step-by-Step Guide
1. Purpose of Handling Total Substation BlackoutA total blackout at a 220 kV or higher substation may lead to widespread power outages, significant economic losses, and instability in the power grid, potentially causing system separation. This procedure aims to prevent voltage loss in main grid substations rated 220 kV and above.2. General Principles for Handling Total Substation Blackout Establish contact with dispatch as soon as possible. Restore station service power promptly. Quickly restore
Felix Spark
10/31/2025
Talep
İndir
IEE Business Uygulamasını Al
IEE-Business uygulamasını ekipman bulmak için kullanın çözümler elde edin uzmanlarla bağlantı kurun ve sektör işbirliğine katılın her yerde her zaman güç projelerinizin ve işlerinizin gelişimini tamamen destekleyerek