The timing for starting grid peaking units is primarily determined by multiple factors to ensure the stable operation and efficient use of resources in the power system. Below are the main factors that influence when to start peaking units:

1. Load Demand Variations

  • Peak Load Periods: During times when grid load reaches or approaches its peak (such as during working hours or summer air conditioning usage peaks), additional generation capacity is needed to meet demand. At such times, peaking units may be started.

  • Off-Peak Load Periods: During nighttime or other periods of low electricity demand, the grid may need to reduce generation to avoid waste. Peaking units can quickly adjust their output or even shut down to accommodate load variations.

2. Intermittency of Renewable Energy

  • Fluctuations in Wind and Solar Power: As renewable energy sources like wind and solar increase their share in the grid, their intermittency and unpredictability pose challenges to grid stability. When wind speeds or sunlight are insufficient, peaking units can quickly supplement the missing generation.

  • Weather Forecasts: Accurate weather forecasts help dispatch centers anticipate renewable energy generation, allowing them to decide when to start peaking units.

3. Electricity Market Prices

  • Price Fluctuations: In electricity markets, prices fluctuate based on supply and demand. When prices are high (usually due to excess demand), starting peaking units can be more economically beneficial.

  • Marginal Costs: The marginal cost (i.e., the cost to produce one additional unit of electricity) of peaking units is typically higher, so they are only started when market prices are sufficiently high.

4. System Reliability Requirements

  • Reserve Capacity: To ensure system reliability, a certain amount of reserve capacity must be maintained. If conventional generating units fail or require maintenance, peaking units can serve as backup power and quickly come online.

  • Frequency and Voltage Control: The stability of grid frequency and voltage is crucial for normal power system operation. Peaking units can rapidly respond to changes in frequency and voltage, maintaining grid stability.

5. Environmental and Policy Factors

  • Emission Limits: Some regions have strict limits on carbon emissions and other pollutants, which affects the choice and use of peaking units. For example, natural gas peaking units are generally more environmentally friendly than coal units and thus are more favored in areas with stringent environmental requirements.

  • Policy Support: Governments may introduce policies encouraging the use of flexible peaking power sources or provide subsidies for unstable renewable energy, which also influences the decision to start peaking units.

6. Technical Characteristics

  • Startup Speed: Different types of peaking units have varying startup speeds. For instance, gas turbines can start within minutes, while hydroelectric units can also respond quickly, but coal units take longer to start. Therefore, the choice of peaking unit depends on the grid's required response speed to load changes.

  • Ramp Rate: The ramp rate (i.e., the ability to increase power output per unit time) of peaking units is another critical factor in determining their suitability for rapid response to load fluctuations.

7. Availability of Energy Storage Systems

Battery Energy Storage Systems: In recent years, battery energy storage systems (such as lithium-ion batteries) have become an important means of peaking. When energy storage systems have sufficient capacity, the need to start peaking units may decrease. Conversely, when energy storage systems are low on charge, the frequency of starting peaking units may increase.

8. Seasonal Factors

Seasonal Load Variations: Load demands vary significantly across different seasons. For example, increased air conditioning usage in summer and heating needs in winter both lead to load fluctuations, affecting the decision to start peaking units.

9. Grid Infrastructure Status

  • Transmission Line Capacity: If transmission line capacity is limited and cannot deliver power from distant sources to load centers, peaking units can be started locally to alleviate transmission bottlenecks.

  • Substation and Distribution Facility Conditions: If certain substations or distribution facilities are undergoing maintenance or upgrades, peaking units can temporarily fill the power supply gap.

Summary

The decision to start peaking units is a complex process involving multiple factors such as load demand, renewable energy fluctuations, market prices, system reliability, environmental policies, and technical characteristics. Power system dispatch centers typically consider these factors comprehensively and use advanced monitoring and control systems to dynamically adjust the operation of peaking units, ensuring the safety, reliability, and economic operation of the grid.

Zhejiang Vziman Electric Group Co., Ltd. is a high-tech enterprise specializing in R&D, manufacturing, and service of power electrical equipment. Committed to innovation, quality, and customer satisfaction, it supplies smart solutions for global power sectors, covering grid construction, new energy, and industrial distribution. Core Business • Switchgear (GIS, circuit breakers, Recloser, Load break switch) • Distribution equipment (transformers, RMU, smart terminals) • Power automation systems • Engineering services (installation, maintenance, consulting) Technical Strength • Provincial R&D center, multiple patents • Modern production, ISO/GB/IEC/CE/UL certified • High capacity, large-scale delivery support Market & Vision Serves State Grid, Southern Grid, and global projects (Asia, Africa, Europe, etc.). Aims to lead in smart grids and new energy, promoting sustainable energy development.

Difference Between Short Circuit & Overload
Difference Between Short Circuit & Overload
One of the main differences between a short circuit and an overload is that a short circuit occurs due to a fault between conductors (line-to-line) or between a conductor and earth (line-to-ground), whereas an overload refers to a situation where equipment draws more current than its rated capacity from the power supply.Other key differences between the two are explained in the comparison chart below.The term "overload" typically refers to a condition in a circuit or connected device. A circuit
08/28/2025
Difference Between Leading and Lagging Power Factor
Difference Between Leading and Lagging Power Factor
Leading and lagging power factors are two key concepts related to the power factor in AC electrical systems. The main difference lies in the phase relationship between current and voltage: in a leading power factor, the current leads the voltage, whereas in a lagging power factor, the current lags behind the voltage. This behavior depends on the nature of the load in the circuit.What is Power Factor?Power factor is a crucial, dimensionless parameter in AC electrical systems, applicable to both s
08/26/2025
Difference Between Electromagnet and Permanent Magnet
Difference Between Electromagnet and Permanent Magnet
Electromagnets vs. Permanent Magnets: Understanding the Key DifferencesElectromagnets and permanent magnets are the two primary types of materials that exhibit magnetic properties. While both generate magnetic fields, they differ fundamentally in how these fields are produced.An electromagnet generates a magnetic field only when an electric current flows through it. In contrast, a permanent magnet inherently produces its own persistent magnetic field once it has been magnetized, without requirin
08/26/2025
Interpretation of the “Five Mandatory Surveys” for On - site Investigation in the Operation and Maintenance Specialty
Interpretation of the “Five Mandatory Surveys” for On - site Investigation in the Operation and Maintenance Specialty
The power outage and work scopes must be clearly inspectedCollaborate with the site survey leader to confirm the equipment to be maintained and the work area involved. Consider requirements such as the use of special vehicles and large machinery, and safe distances from adjacent energized equipment. Verify on-site whether the proposed power outage scope is sufficient to meet the operational needs.On-site safety measures must be clearly inspectedCollaborate with the site survey leader to verify s
Vziman
08/14/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!