• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


CV Series 1140V/300A IEE-Business Contactor Vacuum Bassus

  • CV Series 1140V/300A Low-Voltage Vacuum Contactor

Attributa principalia

Marca Wone Store
Numerus Modeli CV Series 1140V/300A IEE-Business Contactor Vacuum Bassus
currus electricus nominatus 300A
Frequenta nominata 50/60Hz
Series CV

Descriptiones productorum a fornitori

Descriptio

Product Description

Productus habet design compactius, id aptum facit ad apparatus qui spatium strictius requirunt, sicut roadheaders, shearers, et switchgear altae qualitatis. Praeter novas requirementes potentiae, vacuum contactor 1140V/300A longam vitam utendi et altam fiduciam praebet.

Feature

  • Design Compactus pro Applicationibus Spatii Constricti:Optimizatum structura compacta ostendit, id aptum facit ad installationem in apparatu ubi spatium limitatum est, sicut roadheaders, shearers, et switchgear altae qualitatis, ubi efficacia spatialis critica est.

  • Alta Potentia cum Rating 1140V/300A:Specialiter ingeniosus ad requirementes 1140V voltage et 300A currentis satisfacere, operationem stabilam in systematibus potentiae bassae volturae securans, particulariter aptus ad ambientes industriales cum exigentiis potentiae arduis.

  • Longior Vitus Utendi et Fiducia Stabilis:Utilizat technologiam arc-extinguishing vacui, usum contactuum minuens et numerum operationum altum (saepissime ultra 100,000 cyclus mechanicorum) praebens. Robusta constructio perfomantiam constantem etiam in conditionibus duris cum pulvere, vibratione, vel fluctuationibus temperature sustinet.

  • Enhanced Safety Features:Incorporat multos mechanismos protectionis, inter quos overload protection et short-circuit resistance, pericula electrica praeveniens. Design interruptoris vacui pericula arc leakage eliminat, operational safety in ambientes explosivis vel flammabili, sicut in colliis, augens.

  • Lata Compatibilitas et Facilis Integratio:Compatibilis cum variis systematibus controlis (optiones AC/DC control voltage disponibiles sunt) et potest sine difficultate integrari in configurationes existentes switchgear bassae volturae. Dimensiones montandi standard processus installationis et substitutionis simplificantes.

Specifications

1.14kV, 300 Amp Data Sheet
Part number CV 77U033A12
IEC 60947-4-1, UL508, CSA22.2

Rated parameters
Rated voltage 1.14kV
Rated lightning impact voltage 8kV
Rated current AC1 AC1 at 40℃ = 330 A

AC1 at 60℃ = 300 A
Power Rating (Inductive Load) under AC Load P.F. = 0.95 (at 60℃ )

230 V  73kW

400 V  197kW

500 V  246kW

690 V  340kW

1000 V  492kW
AC-3
Rated current AC3 1.14kV 300 A
The rated parameters of the srat cage motor are 50 and 60 hz 1.14kV 428kW
The capacitive heat load withstands the current for 10 seconds for a short time 2400 A
Rated frequency 50 - 60 Hz
Connectivity ability 3,000A
Ability to divide 2,400A
Dielectric strength 6Kv - 1 Min. Interrupter
Breaking current 3.4kA
Withstand current for a short time 1 second 6.0kA
10 seconds 2.4kA
Electrical Life (AC3) 1 million times
Frequency of operation 600 times / hour (every 6 seconds)
Withstand current 14KA / 50MSec

Control parameter ratings
Voltage fluctuations -30% 至+ 25% - at Range Voltage
Suction voltage 70% cold 75% hot or smaller
Release voltage 70% or less
Auxiliary contacts - standard 2NO & 2NC
Auxiliary Contacts - Optional Code - A22 4NO & 4NC

Application conditions
Installation All planes (contactors only)
elevation 2000 meters
environment Storage temperature -55℃ ... +80℃
Operating temperature *-40℃ ... +60℃

Note: means that the whole cabinet can work at -40 degrees because the whole cabinet is equipped with a heater as standard.

Cognosce tui fornitori
Venditio Online
Ratio praestabilitae tradendae
Tempus responsionis
100.0%
≤4h
Brevis Descriptio Societatis
Locus Operis: 1000m² Numerus omnium laborantium: Summa Annua Exportatio (USD): 300000000
Locus Operis: 1000m²
Numerus omnium laborantium:
Summa Annua Exportatio (USD): 300000000
Servitia
Genus Negotii: Venditio
Categorias Principales: transformator/pars componentium/cable et filum/Energia nova/Instrumenta inspectionis/apparatus electrum altum voltus/Aedificii electritas Apparatus electricus/Apparatus electri bassa tensione/Instrumenta et mensurae/Instrumenta productiva/aestus apparatus/Ferramentae electricitatis
Gubernatio vitae
Servitia gestionis curae integralis pro quaestu, usu, conservatione et post-venditionem apparatus electricorum, securitatem operationis, continuationem imperii et usum electricitatis sine cura garantia.
Fornitori instrumentorum praeteritus est certificationem qualificationis platformae et iudicium technicum, ut ex fonte conformitas, professionalitas et fiducia servantur.

Producta Connexa

Cognitio Connexa

  • Accidentia Transformatoris Principalis et Questiones Operationis Gas Luminis
    1. Registri accidentis (XIX Martii, MMXIX)Hora XVI:XIIX die XIX Martii, MMXIX, monitorium background reportavit actionem gas levis transformatoris principis numeri III. Conformiter Codex Operationis Transformatorum Electricitatis (DL/T572-2010), personale operationis et maintenance (O&M) inspectavit statum in situ transformatoris principis numeri III.Confirmatio in situ: Panel non-electricus protectionis WBH transformatoris principis numeri III reportavit actionem gas levis phase B corpus tr
    02/05/2026
  • Culpae et Tractatio Terrae Unipolaris in Lineis Distributionis 10kV
    Characteristica et Instrumenta Detegendi Defectus Terrae Monofasiales1. Characteristica Defectuum Terrae MonofasialiumSigna Centralia Admonitionis:Campanula admonitionis sonat, et lucerna indicativa inscripta „Defectus Terrae in Sectione Omnibus [X] kV [Y]“ accenditur. In systematibus ubi punctum neutrum per bobinam Petersen (bobinam suppressionis arcus) ad terram connectitur, lucerna indicativa „Bobina Petersen Operatur“ etiam accenditur.Indicationes Voltmetri Monitoris Isolationis:Tensio phase
    01/30/2026
  • Modus operationis terre iunctae puncti neutralis pro transformatoribus retis electricitatis 110kV~220kV
    Dispositio modi operis terrae puncti neutralis pro transformatoribus rete electricitatis 110kV~220kV debet exigentias tolerationis insulationis puncti neutralis transformatorum complere, et simul conari ut impedimentum sequentiae nullae stationum transformationis fere immutatum maneat, dum certatur ne impedimentum sequentiae nullae compositum in quocumque puncto raptus circuiti systematis ultra ter impedimentum sequentiae positivae compositum excedat.Pro transformatoribus 220kV et 110kV in novis
    01/29/2026
  • Cur Quare Substationes Lapidem Gravem Calculos et Rupem Fractam Utuntur
    Cur Quare Substationes Utuntur Lapidibus, Gravibus, Piscinis et Saxis Tritis?In stationibus transformationis, instrumenta ut transformatores electricitatis et distributionis, lineae transmissionis, transformatores tensionis, transformatores currentis et commutatores disiunctionis omnia terram exigunt. Praeter terram, nunc profundius explorabimus cur gravia et saxa trita in stationibus transformationis saepe utuntur. Quamquam videantur ordinaria, isti lapides partem criticam iuxtaque functionalem
    01/29/2026
  • Cur autem nucleus transformatoris tantum in uno puncto terram tangere debet Nonne terra multipuncta fidelius est
    Cur ergo nucleus transformatoris terram tangere debet?In operatione, nucleus transformatoris, simul cum structuris, partibus et componentibus metallicis quae fixant nucleum et spiras, in forti campo electrico situs est. Sub influentia huius campi electrici, potentialem relativum altum ad terram comparatum acquirunt. Si nucleus non terra tangitur, differentia potentialis inter nucleum et structuras claudicantes et vas terratum existet, quae possit ad intermitterentiam dismissionem ducere.Praetere
    01/29/2026
  • Intellegere Terram Neutralis Transformatoris
    I. Quid est Punctum Neutrum?In transformatoribus et generatoribus, punctum neutrum est locus specificus in spira ubi absoluta tensio inter hunc locum et singula terminalia externa aequalis est. In diagrammate infra, punctumOrepraesentat punctum neutrum.II. Cur Punctum Neutrum Terrendum Est?Modus connexionis electricae inter punctum neutrum et terram in systemate AC triphasico diciturmodus terrendi puncti neutri. Hic modus directe afficit:Securitatem, fidem et oeconomiciam retelectrici;Selectione
    01/29/2026

Solutiones Relatae

  • Integrata Solutio Potentiae Mixtae Ventus-Solaris pro Insulis Remote
    AbstractusHoc propositum praebet solutionem integratam energetica innovativam, quae profunde combinet generationem venti, photovoltaicam, accumulationem hydroelectricam et desalinizationem marina. Id intendit systematica adflictiones corde insularum remotarum solvere, inter quas difficultates coperturae rete, costus alti generationis diesel, limitationes accumulationis battery traditionalis et raritas fontium aquarum dulcium. Haec solutio synergiarum et autonomiae in "supply power - energy stora
    10/17/2025
  • Systema Hybridum Ventus-Solar cum Controllo Fuzzy-PID pro BATTERIAE GESTIONE ENHANCED et MPPT
    AbstractusHoc propositum systema generationis electricitatis mixtum venti-solaris praebet, quod superiore technologia controlis innititur, ad efficaciter et oeconomico satisfaciendum indigentiis electricitatis regionibus remotis et scenariis applicationis specialibus. Nucleus huius systematis in systemate intelligenti controlis centrat, quod circa microprocessorem ATmega16 constat. Hoc systema Maximum Power Point Tracking (MPPT) tam venti quam solaris perficit et algorithmo optimato, qui combini
    10/17/2025
  • Solutio Mixta Venti-Solis Costo-Effectivus: Convertor Buck-Boost et Caricatio Intelligens Reducunt Costum Systematis
    AbstractHoc solutio novum systema generationis potestatis venti-solaris altae efficientiae proponit. Ad corrigendum defectus in technologiis existentibus, sicut usus parvus energiae, brevis vita bateriarum, et infirma stabilitas systematis, hoc systema convertes DC/DC buck-boost digitaliter plene controlatos, technologiam parallelam interlaced, et algorithmum intelligentem tristagium caricationis adhibet. Hoc permittit Maximum Power Point Tracking (MPPT) in latiore ambitu velocitatum venti et ir
    10/17/2025
Non invenisti adhuc opportunos fornitoris ut te inveniant Citationem Nunc Accipe
Non invenisti adhuc opportunos fornitoris ut te inveniant
Citationem Nunc Accipe
Inquiry
+86
Click to upload file
Descarica
Obtine Applicatio Commerciale IEE-Business
Utiliza app IEE-Business ad inveniendum apparatus obtinendumque solutiones coniungendum cum peritis et participandum in collaboratione industriale ubique et semper propter totam supportionem tuorum projectorum electricitatis et negotiorum