Distribution transformer
Intelligent switchgear opening and closing time operation acc to IEC 61850
For intelligent switchgear, the opening time is defined as the duration starting from the moment when the first message carrying the trip command (a GOOSE message in accordance with the IEC61850 series) is received through the interface, with the circuit - breaker initially in the closed position, a
Login