Machines
Analysis of Single-Phase Grounding Fault Handling and Small-Current Grounding Line Selection Device in Substations
A substation without a grounding line selection device experienced a single-phase grounding fault. The fault location system (FA) pinpointed the fault section between switch A and switch B. On-site patrol and handling took 30 minutes to isolate the fault, with no need for trial tripping of non-fault
Login