What does the testing of photovoltaic transformers involve?

Oliver Watts
Field: Inspection and testing
China
1. Specificities and Testing Requirements of Photovoltaic Transformers
As a new energy systems technician, I recognize photovoltaic transformers' unique design and application traits: Inverter - output AC carries abundant 5th/7th - order odd harmonics, with PCC harmonic current distortion reaching 1.8% (higher voltage distortion under low load), causing winding overheating and accelerated insulation aging. Photovoltaic systems use TN - S grounding, requiring reliable N - phase output from the secondary side to avoid short circuits. Environmentally, they must withstand 60°C desert heat, coastal salt spray, and industrial EMI.
These specifics dictate testing uniqueness: Beyond conventional DC resistance, voltage ratio, insulation, and withstand voltage tests, add harmonic detection (Fluke F435 for THD), temperature rise monitoring (infrared imagers), grounding system checks (four - terminal method for ≤0.1Ω contact resistance), and short - circuit impedance testing. The core aim is ensuring safe operation in power electronic environments while preventing harmonic, thermal, and grounding - related risks.
2. Conventional Testing Items and Tool Selection for Photovoltaic Transformers
2.1 DC Resistance Test
This key test identifies inter - turn short circuits or loose connections in windings. The four - terminal method is used to eliminate line resistance interference, with procedures including power-off discharge, winding cleaning, temperature measurement, current selection (1A/10A), and temperature correction. The ZSCZ - 8900 DC resistance tester (accuracy: 0.2%±2μΩ, resolution: 0.1μΩ) meets high - precision requirements. Measured values must be compared with standards/historical data; significant deviations may indicate faults - as seen in a case where poor winding contact was detected via DC resistance testing and later repaired.
2.2 Voltage Ratio Test
This verifies whether winding turns ratios align with design specifications to ensure stable voltage output under load. The dual - voltmeter method calculates ratios by measuring primary/secondary voltages under no - load conditions, while the voltage ratio bridge method offers higher precision. For instance, a voltage imbalance in the low - voltage output of an 800V/400V transformer, caused by a high - voltage side open circuit, was identified through voltage ratio testing.
2.3 Insulation Performance Test
  • Insulation Resistance Test: Using an MI - 2094H megohmmeter, measure insulation resistance between windings and between windings and the core (required ≥300MΩ).
  • Withstand Voltage Test: Apply 2× rated voltage for 60 minutes to check for breakdown. Ensure power is off, disconnected from live equipment, and surfaces are clean before testing.
2.4 Short - Circuit Impedance Test
The volt - ampere method evaluates short - circuit tolerance: one side is shorted, and a test voltage is applied to the other side to drive rated current through windings, measured by a CS - 8 impedance tester. A change >±2% from the factory value may indicate winding deformation. Note: Test current should be controlled at 0.5% - 1% of rated current to avoid waveform distortion.
2.5 Temperature Rise Test
After full - load operation, measure temperatures of windings, core, and casing using thermometers or infrared thermometers. Temperature rises should be ≤60K for oil - immersed transformers and ≤75K for dry - type transformers. A dry - type transformer operating in a 60°C environment that maintained a temperature rise within 65K extended its service life effectively.
2.6 Grounding System Test
The four - terminal method measures grounding continuity to avoid misjudgments from the two - terminal method. Common faults include rusted connections or plastic washer misuse, requiring regular inspection. Four - terminal ground resistance testers ensure measurements meet the 0.1Ω standard.
2.7 Harmonic Detection
A unique test for photovoltaic systems, using Fluke F435 at the PCC to detect harmonics up to the 50th order (focusing on 5th/7th orders). Results must comply with GB/T 14549 - 93, providing data for equipment optimization.
3. On - site Testing Procedures and Safety Specifications for Photovoltaic Transformers
3.1 Pre - testing Preparation
Develop detailed plans specifying project information, testing items, and equipment lists (including high - precision power analyzers, power quality testers, infrared thermal imagers, etc.). Check equipment integrity and power voltage (220V±10%), and monitor environmental conditions - such as irradiance ≥700W/m², irradiance variation <2% in the preceding 5 minutes, no strong winds or clouds - to ensure test accuracy.
3.2 Electrical Connection Inspection
Use a phase volt - ampere meter to verify inverter output polarity matches the transformer's primary corresponding terminal, preventing circulating current losses. Inspect cable connections for tightness. For oil - immersed transformers, check oil level and color; for dry - type transformers, verify cooling fans operate normally.
3.3 Insulation Resistance Test
With power off, use a megohmmeter to test high/low - voltage windings and grounding, recording 1 - minute stable values. A sudden resistance drop indicates insulation issues. Detailed test reports must be compiled post - testing.
3.4 AC Withstand Voltage Test
Connect the withstand voltage device's output to test points, set parameters to 2× rated voltage, gradually increase voltage while monitoring for breakdown, and maintain for 60 minutes before reducing voltage.
3.5 Load Test
Measure output voltage, current, and power under full - load operation to calculate efficiency and voltage regulation rate, while monitoring temperature rise. Increase load current gradually and record parameter changes for analysis.
3.6 Short - Circuit Impedance Test
Apply voltage to the high - voltage side with the low - voltage side shorted (using wires with sufficient cross - section). Control test current at 0.5% - 1% of rated value and correct results for temperature (75°C for oil - immersed, 120°C for dry - type) to avoid misjudging winding deformation.
3.7 Harmonic Detection
Use a power quality analyzer at the PCC to monitor odd - order harmonic content and calculate THD, ensuring compliance with national standards for safe operation in harmonic environments.
Give a tip and encourage the author!
Recommended
Constant testing of high-voltage cable lines
1. Definition of High-Voltage Cable Line Constant TestingHigh-voltage cable line constant testing refers to the systematic measurement, using specialized instruments, of electrical parameters such as resistance, inductance, capacitance, and conductance before a cable line is commissioned or after major maintenance. The aim is to obtain fundamental data characterizing the electromagnetic properties of the cable, serving as a critical testing phase that provides accurate parameter support for powe
Oliver Watts
09/03/2025
Withstand voltage test of high-voltage cables
Withstand voltage test is an insulation test, but it is a destructive test that can reveal insulation defects difficult to detect in non-destructive testing.The test cycle for high-voltage cables is three years, and it must be conducted after non-destructive tests. In other words, the withstand voltage test is performed only after all non-destructive tests have been passed.Most high-voltage cables used today are cross-linked polyethylene (XLPE) cables, which can have large cross-sections and cov
Oliver Watts
09/03/2025
Analysis of Issues and Causes in Smart Meter Testing
1. Issues and Cause Analysis in Smart Electricity Meter TestingDuring the verification of smart electricity meters, inspections must be conducted on the meter’s appearance, as well as the clarity and integrity of nameplate markings. Additionally, careful checks are required for physical damage and whether the display can show digits completely. A power-on inspection is also necessary. If error codes appear on the display after power-up, faults should be identified and addressed according to the
Oliver Watts
09/01/2025
What tests are required for a qualified smart electricity meter?
In today's world, not wearing a watch is no longer unusual, but not having an electricity meter is a serious issue. As a measuring instrument vital to people's daily lives, the electricity meter is an essential tool for power consumption measurement and billing in every household. According to current national strategic requirements for smart grid development, smart electricity meters have been widely applied and promoted, bringing entirely new and extensive market opportunities to the metering
Oliver Watts
09/01/2025
Seed Inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.