Intelligent na mga Transformer sa Grounding alang sa Suporta sa Island Grid

Vziman
Larangan: Pagbuhat
China

1. Kasinangan sa Proyekto

Ang mga proyekto sa distributibong photovoltaic (PV) ug energy storage kay nagdako rapi sa Vietnam ug Southeast Asia, apan gipahimulos sa significanteng mga hamubo:

1.1 Pagkawalay Stabilidad sa Grid:

Ang grid sa kuryente sa Vietnam kasagaran naa sa pagbag-o (espesyalmente sa amihang industriyal nga mga zona). Sa 2023, ang kahuyan sa coal power naghulga og large-scale blackouts, resultando sa daily losses nga mas dako sa USD 5 million. Ang tradisyonal nga PV systems walay efektibong neutral grounding management capabilities, nagpabag-o ang equipment nga vulnerable sa damage ug safety incidents samtang ang grid adunay mubo. Kini nagpakita sa critical nga panginahanglan alang sa reliable nga grounding transformers.

1.2 Prensya sa Compliance sa Policy ug Safety:

Ang 2024 regulations sa Vietnam mag-require sa energy storage systems nga mopasar sa 72-hour islanding operation test sa Vietnam Electricity Group (EVN) ug adunay high/low voltage ride-through (HVRT/LVRT) capabilities. Tungod sa wide deployment sa power electronics, ang zero-sequence current ug harmonic issues prominent, kasagaran nag-trigger og protection malfunctions. Ang high-performance grounding transformers mahimong essential aron mopasabot sa tanang compliance requirements.

1.3 Mga Panginahanglan sa Environmental Adaptability:

Ang mataas nga temperatura ug humidity climates (annual average humidity >80%) nag-accelerate sa aging sa equipment, nag-demand og grounding transformers nga may robust anti-corrosion ug moisture-proof performance. Ang coastal salt spray environments (air salt content >5mg/m³) molambo pa ang corrosion risks, nag-demand og mas taas nga environmental adaptability sa grounding transformers.

2. Solusyon: Intelligent Grounding Transformer System

2.1 Core Technology Design

Zigzag Connection Grounding Transformer:

Adunay specialized six-winding design, rated capacity nga 1250kVA, ultra-low zero-sequence impedance nga 4-6Ω (kontra sa 30Ω sa conventional transformers), ug short-circuit withstand capability nga 25kA/2s, perfect nga suited sa large-scale distributed power plants.

  • Harmonic Suppression Optimization: Integrated Δ-YY winding structure with LC filters achieves ≥85% suppression of 3rd/5th/7th harmonics, reducing total harmonic distortion (THD) from 12% to <5%, effectively preventing equipment damage caused by resonance. This harmonic mitigation capability represents a core safety feature of the grounding transformer.
  • Environmental Adaptability Enhancement: Enclosure with IP54 protection rating; critical components treated with nano-ceramic coating, passing IEC 60068-2-52 salt spray testing (3000 hours with no corrosion). These protective measures ensure long-term reliability of grounding transformers in harsh environments.
  • Thermal Management Design: Equipped with aluminum alloy heat sinks and forced air cooling system, temperature rise is controlled to ≤55K at 45°C ambient temperature. This efficient thermal management system is crucial for the safe operation of grounding transformers in tropical climates.

2.2 Intelligent Monitoring and Protection System

Integrated Sensor Module: Real-time monitoring of winding temperature, partial discharge, and insulation status; data synchronized to local SCADA and cloud platforms (such as Hoymiles S-miles Cloud) within milliseconds. Continuous monitoring significantly enhances the safety profile of the grounding transformer.

Protection Logic Coordination:

  • Circuit Breaker Coordination: Automatically switches grounding mode within 10 seconds upon detecting grid voltage drop to 20%UN (meeting Vietnam's low-voltage lockout requirements)
  • Arc Fault Detection (AFCI) System Integration: Cuts off fault circuits within 0.5 seconds, preventing ground faults from causing fires. This rapid protection logic integrates seamlessly with the grounding transformer.

2.3 Localized Adaptability Improvements

Grid Compliance: Supports EVN-required islanding test mode, simulating seamless transition to energy storage supply after grid interruption. The grounding transformer is a core component for passing this critical test.

Pre-installed sealing wire interfaces meet Vietnam's mandatory metering room sealing requirements.

Maintenance Convenience: Design service life ≥25 years; maintenance cycles extended to 3 years, significantly reducing O&M costs in tropical regions. The durability of the grounding transformer substantially lowers lifecycle costs.

3. Nakamit nga Resulta

3.1 Ginatapos nga Safety ug Reliability

Achieves neutral grounding switching within 15ms during grid faults (surpassing Vietnam's 50ms standard), ensuring continuous operation of critical loads (such as factory production lines). The rapid fault management provided by the grounding transformer reduced equipment failure rates by 85% and completely eliminated grounding-related incidents after deployment in a 2024 Hanoi industrial zone project.

3.2 Economic Benefits and Compliance

  • Reduced Penalty Risk: Nagpamatuon sa mga pangangailangan sa paglabas ng carbon sa "Green Industry Act," nahatagan og pag-angay ang 3% annual revenue fines.
  • Shortened Payback Period: Pinaabot ang pagbawas sa maintenance costs (35% reduction) ug pagbawas sa downtime losses, ang IRR naka-increase sa 2-3 percentage points, nagpahigayon sa payback period mula 5.8 hangtod 4.2 years.

3.3 Enhanced Grid Support Capability

Nagpasabot sa dynamic regulation testing: Sa ilalum sa flexible dispatch sa EVN (kon grid load <75%), nag-suporta sa power regulation nga adunay hasta 30% sa installed capacity, nagpadali sa mga power plants nga makaparticipar sa Frequency Regulation Market (FRM). Ang stable neutral point nga gihatag sa grounding transformer ang nagbuhat sa foundation para sa kini nga grid support functionality. Sa usa ka pilot project sa Ho Chi Minh City, pinaabot ang reactive power support, ang power plant nakakuha og additional 12% revenue gikan sa ancillary services.

Maghatag og tip ug pagsalig sa author
Gipareserbado
Inquiry
Pangutana
Pangutana sa IEE-Business Application
Pangita og mga equipment gamit ang IEE-Business app asa asa ug kailan man sugad og pagkuha og solusyon pagsulay sa mga eksperto ug pagpadayon sa industriya nga pakisayran suportahan ang imong proyekto sa kuryente ug negosyo