What are the polarity test methods for GIS current transformers?

07/07/2025

I’m Oliver, an 8 - year current transformer testing pro. Today, let’s break down new and old polarity test methods for GIS current transformers—how they work and their pros/cons.
1.Testing Methods
1.1New Method
  • Pre - test ops: Open FDS21/FDS22 fast disconnectors + DS23 disconnector. Close CB21 breaker, then ES21/ES22 grounding disconnectors. Disconnect ES21’s SF6 - shell ground.
  • Wiring: Connect battery between ES21’s moving contact (negative grounded) + ground electrode. This lets current flow L1→L2 in TA’s primary coil. Wire K1 (CT secondary) to DC milliammeter +ve, K2 to - ve.
  • Test: Use DC method—apply DC to primary, check milliammeter deflection. Use ≤100mA range (100μA best for clear deflection). Briefly connect/disconnect ES21’s moving contact + K - battery +ve. Positive deflection (battery on) + negative (battery off) means L1 (CT) and K1 (secondary) are same polarity. Note CT primary coil positions; draw results.

1.2 Old Method

  • Pre - test ops: Close FDS21/FDS22 disconnector, matching disconnector. Open ES21/ES22 grounding disconnectors. Close CB21 breaker.
  • Wiring: Connect battery +ve to 110kV inlet bushing (Ⅰ/Ⅱ), - ve to GIS outlet bushing. Briefly connect/disconnect. Positive deflection (on) + negative (off) means L1/K1 are same polarity. Note CT positions; draw results.

2 Method Comparison

  • New: Simple wiring/ops, low energy loss, works with small batteries. Milliammeter deflects sharply—high sensitivity, accurate.
  • Old: Complex steps, long wires—troublesome on - site. High - altitude risks (battery wiring on bushings). More series components → high impedance → unstable results. Often needs big batteries (rare on - site), risking wrong calls.
3. Safety Must - Dos
Follow strict sequence: Keep CB21 open → open FDS21/FDS22 (line) + DS23 (bus) → close ES21/ES22 (grounding). Critical for live lines/buses—avoids “live + ground disconnector” accidents.
4. Wrap - Up
The new method solves on - site polarity testing pain points, ensures relay protection works, and stabilizes grids. After 8 years in testing, I swear: choosing the right method balances safety + efficiency. 

Hey! I'm Oliver Watts, an electrical engineer in Inspection and Testing. With years of hands - on experience, I ensure electrical systems meet top safety and performance standards. Using advanced gear, I conduct diverse tests, easily spotting issues in both large - scale industrial and small - scale commercial setups. I love teaming up, sharing knowledge, and keeping up with industry regs. Also, I'm skilled at data analysis with software. If you're into electrical inspection or just want to chat engineering, reach out. Let's connect and explore!

Analysis of Issues and Causes in Smart Meter Testing
Analysis of Issues and Causes in Smart Meter Testing
1. Issues and Cause Analysis in Smart Electricity Meter TestingDuring the verification of smart electricity meters, inspections must be conducted on the meter’s appearance, as well as the clarity and integrity of nameplate markings. Additionally, careful checks are required for physical damage and whether the display can show digits completely. A power-on inspection is also necessary. If error codes appear on the display after power-up, faults should be identified and addressed according to the
09/01/2025
What tests are required for a qualified smart electricity meter?
What tests are required for a qualified smart electricity meter?
In today's world, not wearing a watch is no longer unusual, but not having an electricity meter is a serious issue. As a measuring instrument vital to people's daily lives, the electricity meter is an essential tool for power consumption measurement and billing in every household. According to current national strategic requirements for smart grid development, smart electricity meters have been widely applied and promoted, bringing entirely new and extensive market opportunities to the metering
09/01/2025
What Tests Are Required for Indoor Load Switches?
What Tests Are Required for Indoor Load Switches?
The testing of indoor load switches should cover their entire lifecycle, focusing on four core aspects: "ensuring reliable insulation, normal mechanical operation, safe switching capability, and operational compatibility." The main testing categories include:1. Insulation Performance Testing: Use a megohmmeter to measure insulation resistance between phases, from phase to ground, and between moving and fixed contacts (≥0.5 MΩ for low voltage, ≥1000 MΩ for high voltage). High-vo
08/28/2025
What inspections and tests need to be carried out for low - voltage pole - mounted circuit breakers?
What inspections and tests need to be carried out for low - voltage pole - mounted circuit breakers?
Alright, folks, Oliver Watts here. Been poking, prodding, and testing these pole-mounted breakers for about eight years now, mostly out in the field but also in the lab. Seen a fair share of good ones, bad ones, and... well, let's just say "interesting" ones. So, when we're talking about signing off on a qualified low-voltage pole-mounted circuit breaker – you know, one that's actually gonna do its job when the sh*t hits the fan out there on the line – it ain't just a quick visual ch
08/21/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!