750kV Transformer On-Site PD and Induced Withstand Test: Case Study and Recommendations
I. Introduction The Guanting–Lanzhou East 750kV transmission and substation demonstration project in China was officially put into operation on September 26, 2005. This project includes two substations—Lanzhou East and Guanting (each equipped with four 750kV transformers, three of which form a three